1. GENERAL DATA:
1.1 Soil data:
Net SBC of Soil Considered @ 2.00m = 307.9 kN/m2
Gross SBC of Soil Considered = 307.9X1.25+18x2
Gross SBC of Soil Considered = 420.88 kN/m2
Unit Weight of Soil = 18 kN/m2
Type of Soil = Dense Silty sand
Angle of Repose(ф) = 32⁰
Co-efficient of friction(µ) = 0.4
2.LOAD CALCULATION:
2.1 Footing Load:
Length of Footing(L) = 2 m
Width of Footing(B) = 2 m
Depth of Footing(D) = 0.65 m
Weight of Footing(Wf) = 65.00 kN ;=Wf
Actuating Moment-Mz:
Shear Force(Vx) = 42.23 kN ;=Vu/FOS
Moment due to Shear Force(M sf) = 27.45 kN ;=Vx*D
Bending Moment(Mz) = 103.70 kN ;=Msf+Mz
Actuating moment-MZ = 131.15 kNm
4.STRUCTURAL DESIGN:
4.1 Design of footing:
4.1.1 Soil pressure intensity:
Total Vertical Loads(Pv) = 698.00 kN ;=Py
Total Vertical Loads on Footing(Pu) = 1047.00 kN ;=Pvx1.5
Actuating moment - Mx = 143.34 kNm ;=Mx
Actuating moment - Mz = 131.15 kNm ;=Mz
SBC of soil considered = 421 kN/m2
SBC Check = SBC>PLB±6MxL±6MzB/L2B2
Actual base Max. pres. = 380.37 kN/m2
Actual base Min. pres. = 31.37 kN/m2 ;Negative pressure
1.350
0.650
A O D
=1141.11kN/m
BM at 'O' point(Mux) = 0.5x1141.11((2-0.4)/2² ;=0.5*qWux*((B-b)/2)2
BM at 'O' point(Mux) = 365.15 kN-m
1.350
0.650
B O C
=1140.99kN/m
4.3.2 Spacing(Sv):
Dia of rod is Provid = 20 mm
area of per rod(ast) = 314 mm2
i) Spacing of Main Rods(Sv) =
= 163 mm c/c
ii)3times of eff. Depth of footing = 1746 mm c/c
iii)Normally provided as Spacing = 300 mm c/c
Provided Spacing of Rods(Sv pro) = 150 mm c/c
Area of steel Provided(Ast(pro)) = 2093.33 mm2
4.4.2 Spacing(Sv):
Dia of Rod is Provid = 20 mm
Area of per rod(ast) = 314 mm2
i) Spacing of Main rods(Sv) = 314x1000
1920.60
= 163 mm c/c
ii)3times of eff. Depth of footing = 1746 mm c/c
iii)Normally provided as Spacing = 300 mm c/c
Provided Spacing of Rods(Sv pro) = 150 mm c/c
Area of steel Provided(Ast(pro)) = 2093.33 mm2
1.350
0.650
94.11kN/m
4.5.1.1 Moment aboutCantilever(OA):
BM at 'O' point(Mux) = 0.5x94.11((2-0.4)/2² ;=0.5*qWux*((B-b)/2)2
= 30.11 kNm
1.350
0.650
94.11kN/m
4.5.2 Spacing(Sv):
Dia of rod is Provid = 12 mm
area of per rod(ast) = 113.04 mm2
i) Spacing of Main Rods(Sv) = 780x1000
113.04
= 145 mm c/c
ii)3times of eff. Depth of footing = 1746 mm c/c
iii)Normally provided as Spacing = 300 mm c/c
Provided Spacing of Rods(Sv pro) = 125 mm c/c
Area of steel Provided(Ast(pro)) = 904.32 mm2