ELECTRICAL AUDIT / INSPECTION REPORT

Report No. : NES/ESA/19-20/11 Date : 13.08.2019

CLIENT : Anupam Creations


PROJECT: Electrical/Safety Audit Inspection

LOCATION:
S. No.11, Nr. Ambika E-state, Saijpur-Gopalpur, Shahwadi, Ahmedabad

DOCUMENTS OF REFERENCE:
Sr. No. Title Reference Rev Approved by
1 Checklist Annex - 1 0 NES
2 Inspection Report Annex - 2 0 NES
3 Thermography Annex - 3 0 NES
4 Billing & Consumption Trends Annex - 4 0 NES

ELECTRICAL AUDIT / INSPECTION DETAILS :

1 Audit Date / Period : 25-07-19


2 Visit for Audit : 1

ENCLOSURES TO THIS AUDIT REPORT

Sr. No. Description Nomenclature Pages


1 Checklist Annex - 1 5
2 Inspection Report Annex - 2 2
3 Thermography Annex - 3 2
4 Billing & Consumption Trends Annex - 4 1

Audit Carried Out By:


Mr. Rahul Acharya
Mr. Dhaval Darji

Inspection Report Issued by:


EledeaEnergy Solutions
Navitas

COV Page 1 of 1
ELECTRICAL AUDIT / INSPECTION REPORT NO.NES/ESA/19-20/11
ANNEX - 2
Checklist
PROJECT: Electrical Audit / Inspection of Factory Premises

Sr. No. Description A B C D Remarks

1 Electrical Installations & Equipments

A Substation OISD 147 NA


1 Condition of Incomer Cable
2 Visual Examination
3 Equipment Upkeep / Maintenance
4 Earthing Pits
5 Warning Plates / Signs
6 Presence of any Foreign Material
7 Presence of Moisture / Water
8 Locking System
9 Overall Safety

B DP Structure OISD 147


1 Visual Examination x
2 Painted Last / Condition of Painting x
3 Equipment Upkeep / Maintenance x
4 Marking & Warning Plate x
5 Condition of Earthing x
6 Qty. of Earth Pits x
7 Overall Safety x

C Lightening Arrestors IS11548 NA


1 Existing
2 Visual Examination
3 Equipment Upkeep / Maintenance
4 Last Change
5 Condition of Earthing
6 Qty. of Earth Pits
7 Overall Safety

D Transformer IS 2026
1 Visual Examination x
2 Rating x
3 Equipment Upkeep / Maintenance x
4 Cable Connection x
5 Oil Level x
6 Breather x
7 Protection x
8 Suitability x
9 Load Distribution x
10 Oil BDV Last Value x
11 Oil Spillage / Leakages x
12 Condition of Earthing x
13 Qty. of Earth Pits x
14 Painted Last / Condition of Painting x
15 Overall Safety x
E Switchgears & Main Panel IS13947
1 Visual Examination x
2 Capacity x
3 Rating x
4 Connection x
5 Energy Meters x
6 Condition of Wiring x
7 Colour code of wire adhered x
8 Condition of Earthing x
9 Equipment Upkeep / Maintenance x
10 Rubber Mat in front & Back of the panel x
11 Marking & Warning Plate x
12 Fire Extinguisher in Vicinity x
13 Overall Safety x

F Load Distribution Panel IS13947


1 Visual Examination x
2 Load distribution x
3 Bus Bar Capacity x
4 Voltage Monitoring x
5 Cable Suitability x
6 Cable IR x
7 Gland Condition x
8 Condition of Wiring x Hanging wires found
9 Colour code of wire adhered x
10 Rating of MCBs x
11 ELCB x
12 Fuses x
13 IP of Panel x
14 Internal Wiring Status x
15 Access for working x
16 Rubber Mat in front & Back of the panel x
17 Marking & Warning Plate x
18 Fire Extinguisher in Vicinity x
19 Maintenance / upkeep of equipment x Dust observed in some panels
20 Overall Safety x

2 Electrical Utilities and Auxiliaries

A Pumps
1 Equipment Upkeep / Maintenance x
2 Connection wiring / Conduiting x
3 Terminal Connections & Contacts x
4 MCB / Contactor x
5 Foundation x
6 Overload Protection x
7 Overall Condition x

B D G Set OISD 147


1 Visual Examination x
2 Engine condiiton x
3 Generator rating & Condition x
4 Coupling x
5 LT Panel x
6 Exciter Panel x
7 Battery bank x
8 Enclosure x
9 Meters x
10 Type of Changeover x Manually changeover
11 Condiiton of Changeover x
12 Type of Cooling x
13 Megger Value x
14 Earthing x
15 Foundation x
16 Oil Spillage x
17 Cable Connection x
18 Suitability of the Cable x
19 Access x
20 Exhaust Arrangement x
21 Presence of Inflammable / unrequired material x
22 Maintenance / upkeep of the equipment x
23 Overall Safety x

C Air Compressor OISD 147


1 Visual Examination x
2 Rating x
3 Safety Release operation x
4 Cable Connection x
5 Access x
6 Maintenance / upkeep of the equipment x
7 Overall Safety x

D Yard Lighting IS 13383 NA


1 Junction Box Condition
2 Cable Size
3 Termination
4 Earthing
5 Maintenance / upkeep of the equipment
6 Overall Safety

E Manufacturing Equipments OISD 147 NA


1 Visual Examination
2 Wiring Conditions
3 Meters for Reading various Parameters
4 Access to the Panels of Equipment
5 Cable Connection
6 Colour Code for Wiring
7 Condition of Earthing
8 Maintenance / upkeep of the equipment
9 Overall Safety

3 Offices, Staff Room, Manufacturing / Storage Area, Packing Area & Storage Areas

A Wiring & Conduiting


1 Visual Examination x
2 Equipment Upkeep / Maintenance x
3 Switches / fuses x
4 Conduits & Ceiling Roses x
5 Conduits / Laying of Wires x
6 Extension Boards x
7 Lugging and Contacts x
8 Wiring status x
9 Presence of Foreign Material x
10 Presence of Moisture / Water x
11 Traceability of Wiring/ Colour Coding x
12 Overall Safety x

B Lighting System
1 Visual Examination x
2 Equipment Upkeep / Maintenance x
3 Overall Condition x
4 Wiring / Conduiting status x

C Computers, Printers and Fax Machines


1 Equipment Upkeep / Maintenance x
2 Connection wiring x
3 Extension Board x
4 Ventilation x
5 Overall Condition x

D UPS and Battery Bank


1 Equipment Upkeep / Maintenance x
2 Voltage Stabiliser x
3 Connection wiring x
4 Extension Board x
5 Battery Water level NA as dry type battery provided
6 DC Protection x
7 Gravity Meter x
8 Battery Connections / lugging x
9 Inverter Panel x
10 Ventilation x
11 Overall Condition x

E Air Conditioners
1 Equipment Upkeep / Maintenance x
2 Voltage Stabiliser x
3 Connection wiring x
4 Plug & Socket Condition x
5 MCB x
6 Overall Condition x

F Fans
1 Equipment Upkeep / Maintenance x
2 Connection wiring / Conduiting x
3 Switch & Regultors x
4 Overall Condition x

G Water Coolers / Refrigerators


1 Equipment Upkeep / Maintenance x
2 Connection wiring / Conduiting x
3 Plug & Socket x
4 Overall Condition x

H Plugs & Sockets


1 Equipment Upkeep / Maintenance x
2 Connection wiring / Conduiting x
3 Capacity x
4 Overall Condition x

I Extension Boards NA
1 Equipment Upkeep / Maintenance
2 Connection wiring / Conduiting
3 Capacity
4 Overall Condition

J APABX / Communication / LAN System NA


1 Equipment Upkeep / Maintenance
2 Connection wiring / Conduiting
3 Interference with Electrical Wiring
4 Overall Condition

4 Unsafe Practices

1 Blocking the access to switchboards / equipments x


2 Housekeeping / Waste material removal x
3 Discarded wiring and circuits x
4 Usage of Sockets without Plugs x
5 Negligence towards Maintenance x

5 General Safety Aspects


1 Fire Extinguishers
a Dry Chemical Powder Type x
b CO2 type x
2 Fire Alarm System Not Installed
3 Fire Alarm Panel Not Installed
4 First Aid Chart x
5 First Aid Box x
6 Tools Kit x
7 Display Important Tel. Nos. x
8 No Smoking Board x
9 Switch Off Mobile Board x
10 Training for Safety x
11 Mock drill x
12 Maintenance Record x
13 Records of Failure / Accidents x

6 Recommendation for

1 Energy Saving Schemes x Highly Recommended


2 Awarness for Safety x Highly Recommended
3 Training and encouragement for Safety Practices x Highly Recommended
4 Servo Stabiliser for Voltage x
5 Spike Guards x Highly Recommended
6 Load Balancing Required x Highly Recommended
7 Effective Earthing Required x
8 House Keeping x Highly Recommended
9 Discarding unnecessary wiring and equipments x Highly Recommended
10 Record Registers x Highly Recommended
A - Good B - Satisfactory C - Average D - Below Average

Auditor's Signature:
ELECTRICAL AUDIT / INSPECTION REPORT NO.NES/ESA/19-20/11

CLIENT : Anupam Creations


PROJECT: Electric Audit/Inspection
ANNEX - 1
Inspection Report

Area: GIDC
Name of Power Supply Company: Torrent
Type of Power Supply: HT
Electrical Power Input: Three Phase
Category: Industrial

Measurement Taken Per Phase:


Parameters Ph-1 Ph-2 Ph-3
Voltage (V) 436.2 436.0 434.2
Current (Amp.) 754.4 732.8 744.5
Load (KW) 167.80 164.60 163.90

Whether Load is balanced or unbalanced : Balanced

Status of Present Electrical Installation

Rated Actual Actual


Sr. No. Load
Power (KW) Current (A) Voltage (V)

Line - A
1 Reggiani M/c 45 27.3 426.5
2 Reggiani M/c AC 11 24.8 427.1
3 MS Printing M/c 45 11.3 425.9
4 MS Printing M/c AC 11 14.1 426.3
5 Dust M/c Alfa 330 45 11.2 428.1
6 Dust M/c AC 11 25.3 424.5
Line - B
7 Drying M/c 50 16.4 427.2
8 Air Compressor 45 34.6 426.9
Line - C
9 MCS Washing M/c 47 98.5 425.9
10 Drying Range-I 50 14.8 426.5
11 Stanter Device 300 3.1 424.8
12 Loop M/c 80 15.7 428.1
13 RO Plant 50 21.2 427.9
14 Oil Boiler 150 56.4 426.7
15 Steam Boiler 150 52.5 427.1
16 ESP M/c 11 19.4 428.5
Line - D
17 ETP Plant 200 9.4 427.9
Line - E
18 Calender M/c 100 82.4 426.5
Direct Tap off From 1600 A to Borewell
19 Borewell Pump 60 76.9 428.3

Auditor's Signature:

Anx -1 Page 1 of 3
ELECTRICAL AUDIT / INSPECTION REPORT NO.NES/ESA/19-20/11

CLIENT : Anupam Creations


PROJECT: Electric Audit/Inspection
ANNEX - 1
Inspection Report

Profile of Load Requirement / Safety Devices / Electrical Wirirng:

(a) Sanctioned Load (KW) : 700

(b ) Rating of Transformer (KVA) 1250

(c) Rating of DG set (KVA) 500

(d) Whether MCBs are ISI marked : Yes

(e) Whether MCBs are of appropriate rating : Yes

(f) Capacity of UPS System : 100 KVA

(g) Average Power Factor of last 12 month : 0.89

(h) Whether APFC Panel installed : No


If yes, capacity : - KVAr

(i) Whether all Electrical cables/wirings are of


Yes
appropriate rating, ISI approved & fire resistant :

Auditor's Signature:

Anx -1 Page 2 of 3
ELECTRICAL AUDIT / INSPECTION REPORT NO.NES/ESA/19-20/11

CLIENT : Anupam Creations


PROJECT: Electric Audit/Inspection
ANNEX - 3
Thermography of Anupam Creations

Sr. No. Description


1 Main LT Panel

IR Images Actual Image

2 1600 A BBT

IR Images Actual Image

3 1600 A Busbar

IR Images Actual Image

4 1600A to 800A Line-B Busbar

IR Images Actual Image

5 1600A to 800A Line-C Busbar

Anx -5 Page 1 of 2
ELECTRICAL AUDIT / INSPECTION REPORT NO.NES/ESA/19-20/11

CLIENT : Anupam Creations


PROJECT: Electric Audit/Inspection
ANNEX - 3
Thermography of Anupam Creations

Sr. No. Description

IR Images Actual Image

6 1600A to Borewell

IR Images Actual Image

7 1600A to 800A Line-D Busbar

IR Images Actual Image

8 1600A to 800A Line-E Busbar

IR Images Actual Image


NOTE :-
1 Kindly note that all temperature mentioned in the photographs are in Fahrenheit.
Formula for conversion from Fahrenheit (˚F) to Celsius (°C) is mentioned below:
2
T(°C) = (T(°F)-32) x 5/9

Auditor's Signature:

Anx -5 Page 2 of 2
ELECTRICAL AUDIT / INSPECTION REPORT NO. NES/ESA/19-20/11

CLIENT : Anupam Creations


PROJECT: Electrical Audit / Inspection
ANNEX - 4
Billing & Consumption Trends

Nos. of Units Total Energy


Sr. No. Month
Consumed Charges Paid

1 Apr-19 647 2030634.34


2 May-19 595 1825725.37
3 Jun-19 615 2080056.39
4 Jul-19 642 611899.26

C-1 KWH / Month


Units Consumed in kWH

660 647 642


640
620 615

600 595

580
560
Apr-19 May-19 Jun-19 Jul-19

Month

Auditor's Signature:

Anx -6 Page 1 of 1