Project Job Ref.

Structure Sheet no.


Page 1/3
Calc. by Date Chk'd by Date App'd by Date
17/10/2019 11/10/2019 11/10/2019

PC 3

Static
Applied Loads Summary
Strength Service
Analysis 3D Building Analysis 3D Building Analysis
Combination 3 (Erection) Cb1-1.4D+1.6I+1.6RI 3 (Erection) Cb1-1.4D+1.6I+1.6RI
P 691.1 kN 493.7 kN
Fx,sup 0.0 kN 0.0 kN
Fy,sup 0.0 kN 0.0 kN
Mx,sup 0.0 kNm 0.0 kNm
My,sup 0.0 kNm 0.0 kNm
Added Loads
Fswt 3.5 kN
Fsoil 0.0 kN
FGsur 0.0 kN
FQsur 0.0 kN
Project Job Ref.

Structure Sheet no.


Page 2/3
Calc. by Date Chk'd by Date App'd by Date
17/10/2019 11/10/2019 11/10/2019

Foundation Details
Foundation Type Pile Cap
Concrete Class C25
Size 550mm × 550mm
Overall Depth 500.0 mm
Top Cover 40.0 mm
Bottom Cover 40.0 mm
Side Cover 40.0 mm
Depth From Surface 0.0 mm
Number of Piles 1
Pile Shape and Size Circular 250 mm
Pile Installation Type Driven
Pile Length 20.000 m
Pile Edge Distance 150.0 mm
Pile Embedment 100.0 mm

Pile Capacity - Critical


Summary
Compression Tension
Analysis 3D Building Analysis -
Combination 3 (Erection) Cb1-1.4D+1.6I+1.6RI -
Fpn,max 497.1 kN -
R 500.0 kN -
Ratio 0.994 -

Bending Capacity
Summary
Direction X Y
Analysis 3D Building Analysis 3D Building Analysis
Combination 3 (Erection) Cb1-1.4D+1.6I+1.6RI 3 (Erection) Cb1-1.4D+1.6I+1.6RI
mu 94.243 kNm/m 94.243 kNm/m
d 430.0 mm 450.0 mm
K / K' 0.131 0.119
z 408.5 mm 427.5 mm
As,reqd,bot 576 mm2/m 551 mm2/m
As,prov,bot 1047 mm2/m 1047 mm2/m
As,min,bot 738 mm2/m 738 mm2/m
Ratio 0.551 0.526
Top - -
Bottom Type 2 T 20 @ 300.0-B2 Type 2 T 20 @ 300.0-B1

Shear Capacity
Summary
Direction X Y
Analysis 3D Building Analysis 3D Building Analysis
Combination 3 (Erection) Cb1-1.4D+1.6I+1.6RI 3 (Erection) Cb1-1.4D+1.6I+1.6RI
vsu 0.000 N/mm2 0.000 N/mm2
Project Job Ref.

Structure Sheet no.


Page 3/3
Calc. by Date Chk'd by Date App'd by Date
17/10/2019 11/10/2019 11/10/2019

vres 0.000 N/mm2 0.000 N/mm2


Ratio 0.000 0.000

Pile Punching Shear


Summary
Perimeter u0 / un vef vmax / vc Ratio Status
[mm] [N/mm2] [N/mm2]
Loaded - - - - Not required

Pile One-Way Shear


Check Not Required
Check not required for any pile

Static
Pile Capacity - Critical
3D Building Analysis - Critical
3 (Erection) Cb1-1.4D+1.6I+1.6RI - Critical
Piles centroid X axis position from plan bottom cx-x = 275.0 mm
edge
Piles centroid Y axis position from plan left cy-y = 275.0 mm
edge
Sum of squares of pile offsets about piles Ixx = 0 mm2
centroidal X axis
Sum of squares of pile offsets about piles Iyy = 0 mm2
centroidal Y axis
Number of piles n=1
Total base reaction T = (γfG,0 × Fswt + γfG,soil × Fsoil + γfG,sur × FGsur + γfQ,sur × FQsur) - P = 497.1 kN
Length in X direction Lx = 0.550 m
Length in Y direction Ly = 0.550 m
Moment about X axis Mx,c = Mx,sup - (P × ePy) - (h × Fy,sup) = 0.0 kNm
Moment about Y axis My,c = My,sup + (P × ePx) + (h × Fx,sup) = 0.0 kNm
Eccentricity in X direction eTx = My,c / T = 0.0 mm
Eccentricity in Y direction eTy = -Mx,c / T = 0.0 mm
Load eccentricity about piles centroidal X axis exx = |(Ly / 2) - eTy - cx-x| = 0.0 mm

Load eccentricity about piles centroidal Y axis eyy = |(Lx / 2) - eTx - cy-y| = 0.0 mm

Pile 1 : 497.1kN < 500kN


Pass