COSTO DIRECTO
GASTOS GENERALES 15%
UTILIDAD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
METRADOS
OBRAS PRELIMINARES L A
Trazo y replanteo
17.00 10.00
26.00 10.00
MOVIMIENTO DE TIERRAS
Excavación para cimentación 17.00 1.00
26.00 1.00
Eliminación manual de material excedente (Proveniente de excavaciones) 129.00
Eliminación de material excedente C/Maquinaria
OBRAS DE CONCRETO ARMADO
CONCRETO EN CIMENTACION
Concreto F'c=210 kg/cm2 17.00 1.00
26.00 1.00
Acero Fy=4200 kg/cm2 Cant L
5.00 18.00
68.00 0.90
P. UNIT C. PARCIAL
1.60 688.00
1,800.00 1,800.00
1.40 420.00
2,000.00 2,000.00
1,500.00 1,500.00
1,500.00 1,500.00
42.00 5,418.00
15.00 2,322.00
20.00 3,096.00
450.00 58,050.00
5.60 838.26
450.00 96,750.00
45.00 1,935.00
5.50 18,730.80
}
195,048.06
29,257.21
19,504.81
==========
243,810.08
43,885.81
==========
287,695.89
H Parcial Total
430.00
170.00
260.00