at fax number by
CEO/PRESIDENT
QC MANAGER
PLANT MANAGER
PROD. CONTROL
PROCESS ENGR.
PRODUCT ENGR
SALES
OTHER
5 YOUR CURRENT PLANT UTILIZATION? % IMPACT OF SOUTHCO QUOTED BUSINESS ON YOUR PLANT?
6. HOW MANY SHIFTS PER DAY DOES YOUR PLANT NORMALLY WORK? DAYS PER WEEK?
** NOTE: - % = PERCENT OF TOTAL VOLUME PPM = RETURN + SCRAPPED + SORTS + REWORKS) X 1,000,000 / RECEIPTS
13. DO YOU CURRENTLY MANUFACTURE PARTS FOR THE AUTO INDUSTRY? YES NO
14. WHAT ARE THE TYPICAL TOLERANCES WITH WHICH YOU WORK?
NON-US COMPANY. IF YOU ARE A NON-US COMPANY AND WILL SHIP TO A US SOUTHCO FACILITY, YOU MUST
COMPLETE AND SUBMIT THE C-TPAT SURVEY FORM 1315D OF THIS SPREADSHEET
CALIBRATION OR GAGE SUPPLIERS STOP HERE. THOSE WHO ARE NOT ISO 17025 ACCREDITED MUST COMPLETE SOUTHCO
FORM 1315a AND RETURN WITH THIS SURVEY. SUPPLIERS ACCREDITED TO ISO 17025 MUST RETURN A CURRENT COPY OF
THEIR CERTIFICATE WITH THIS FORM.
HEAT TREAT SUPPLIERS STOP HERE. SIGN THE BOTTOM OF THIS DOCUMENT AND COMPLETE FORM 1315B OF THIS SPREADSHEET
PLATING SUPPLIERS STOP. SIGN THE BOTTOM OF THIS DOCUMENT AND COMPLETE FORM 1315C OF THIS SPREADSHEET
ISO/TS CERTIFIED SUPPLIERS STOP HERE. SIGN THE BOTTOM OF THIS DOCUMENT. RETURN THIS DOCUMENT ALONG
WITH A COPY OF YOUR ISO/TS CERTIFICATION TO SOUTHCO.
3. Is there a planning process consistent with the Design Reviews, FMEA's, Control
elements of APQP? Plans, Timing Charts, Checklists
PROCESS CONTROL
Question Y/N Examples List Examples and Exceptions
1. Are all interrelated processes in-house? Flow Diagram
2. Are control plans revised for product and process Control Plans compared to
changes or when processes are found to be product and process SPC Charts
unstable or non-capable? updated
3. Does the supplier utilize defect prevention SPC, Error Proofing, Visual
methods? controls
4. Work area chean and well organized? Adequate lighting
Material Identifications
Nonconforming Material
In-Process
Final Inspection
Product Rework
Preventative Maintenance
Tools & Equipment
Calibration
Do you design and/or build your own tools? If yes, What percentage?
PURCHASING
Question State Plan / Procedure Verification/Effectiveness
FINANCIAL STABILITY
Question State Details
1.
Have you declared bankruptcy or changed
majority ownership in the last 3 years?
COST REDUCTION
Question State Details
1. Do you have a cost reduction program
(internal/external)?
TRAINING
Question State Plan / Procedure Verification/Effectiveness
1. How does the supplier cover for
absenteeism?
2. How does the supplier train replacement
employees?
3. How does the supplier deal with internal
language barriers?
4. How is the effectiveness of the training
verified?
SUPPLIER HAS REVIEWED SOUTHCO FORM 1058 - SOUTHCO SUPPLIER QUALITY STATEMENT OF REQUIREMENTS
DATE:
Supplier Representative Signature
Southco maintains control of all monitoring and measuring devices used in the
Manufacture of our products. To ensure valid results, all equipment is verified at
Specified internals against national or internationally recognized standards. All
calibration and gauge suppliers are required to show compliance to Southco
requirements via one of the following methods
Or
The following request will accompany all purchase orders for calibration services
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1. Is the responsibility for quality planning of heat treat processes clearly defined? Assess the adequacy of the
heat treater's quality planning effort. Identify the key contact personnel/department for quality planning and
quality concern resolution. Include names, department names, and phone numbers.
2. Are Failure Mode and Effects Analyses (FMEA) and Control Plans used as a basis for establishing quality
programs for heat treat processes?
•
Does the heat treater use analysis processes to determine special characteristics and process parameters?
• Is the customer/end user of the heat treated product brought into the quality planning process?
3. Does the heat treater have available and use a procedure for reviewing part design and heat treat process
changes prior to implementation?
• Are FMEAs and Control Plans reviewed and updated as part of the procedure?
• Is customer approval obtained prior to implementing changes?
• Is there a procedure for updating operator instructions and visual aids for process and product changes?
B. STATISTICAL METHODS
4. Is Statistical Process Control (SPC) utilized for special product characteristics and process parameters?
How are the special characteristics chosen? Describe the SPC methods used. Are they appropriate to the
•
factors being controlled?
Evaluate the heat treater's reaction to out-of-control conditions. Is the reaction as specified in the Control
•
Plan? What is the role of the operator?
Evaluate the heat treater's application of SPC, based on the evidence of the control charts, process logs
•
and other appropriate documentation.
5. Are process verifications/capability studies conducted on new product characteristics and heat treat process
parameters?
6. Are statistical control charts being used effectively to monitor the process?
Do control charts indicate that statistical control has been achieved and that process capability has been
demonstrated?
In all cases where process capability has not been demonstrated, is there a plan to improve the process? Is
•
appropriate interim action being taken to prevent shipment of nonconforming parts?
7. Does the heat treater have a defined program to being about continual improvement in quality and
productivity?
8. Does the heat treater have an effective system for ensuring the quality of incoming products and services?
C. GENERAL
9. Are process/product monitoring and control functions and responsibilities clearly defined?
Indicate which plant activities conduct process/product monitoring and control.
11. Are written process monitoring and control instructions available for incoming, in-process, laboratory,
dimensional inspection and outgoing auditing?
Are all Special characteristics and Process Parameters included, particularly those affecting function and
•
durability?
• Are Special characteristics and related operations identified?
• Are sample sizes and frequencies adequate?
• Is appropriate statistical analysis specified?
12. Are appropriate process monitors, thermocouple and inspection/test equipment available to facilitate process
control?
13. Does the heat treater have an effective preventive maintenance program for heat treat process equipment,
thermocouple and process monitoring equipment?
Do records indicate that process monitors, thermocouples and inspection test equipment are periodically
•
inspected and calibrated?
• Does the heat treater perform furnace temperature uniformity surveys (thermal profiles)?
• Asses the adequacy of the heat treater's preventive maintenance program and its effectiveness.
14. What controls does the heat treater use to indicate the processing and inspection status of products throughout
the heat treating system.
Are effective controls in place to provide accurate part processing information throughout processing
•
storage, packaging and shipping?
Are controls adequate to prevent movement of nonconforming rejected in-process products into the
•
production system?
15. Does the heat treater have complete records supporting Production Part Approval (PPAP) certification?
When required, has product engineering approval of Product/Process Control Plan, samples and test
equipment been documented.
17. Are process monitoring and inspection/tests performed according to the instruction sheets?
• Are there adequate records of inspections and tests?
18. Are documented heat treat reject, reprocessing or scrap procedures available?
• Are reprocessed parts audited for conformance to all customer requirements?
• Assess the adequacy of the procedures?
19. Are heat treat processing, handling, storage and packaging adequate to preserve product quality?
• Assess the heat treater's furnace loading system, in-process handling and shipping process for any
cause of concern.
20. Are plant cleanliness, housekeeping, environmental, and working conditions conducive to quality
improvements?
• Are there working conditions that could be detrimental to quality improvement?
• Could product quality be affected by plant environment?
Conformance to QS-9000, Heat Treat System Survey Scoring Guidelines and W-HTX requires at least a "7" rating on each
individual element and at least a "160" overall System Survey Rating. Suppliers should provide improvement action plans for all
areas with a rating below "7" within 60 days.
Are you willing to participate in team meetings at your facility and ours:
What outside certifications do you have such as ISO 9001/2000, TS16949, and
automotive?
Do you mix parts to optimize load size? If yes, how do you separat
E-Coat
• Gloss – Glossy / Semi-gloss / Dull
Fluorocarbon
• Emralon
• Xylan
Geomet plus Sealer
Nickel
• Bright / Black
• per MIL-F-14072; QQ-N-290; SAE
AMS 2418
Phosphate
• per GM4435M
• Zinc Phosphate
Powder Coat
• Gloss – Glossy / Semi-gloss /
Textured / Flat
Tin
• Bright per ASTM B545
Zinc Plate
• per ASTM B633; BS EN 12329; AS
1789; DIN 50961
• with Hexavalent Chromate – Bright,
Yellow, Olive Drab, Black
• with Phosphate Dip
Zinc Plate
Zinc Plate
• with Trivalent Black Chromate
• Gloss – Bright / Semi-gloss
• Sealed
Zinc Cobalt
• with Chromate – Bright / Black /
Yellow
• with Phosphate Dip
• Sealed
Zinc-Iron Alloy
• with Chromate – Metallic Grey / Black
Zinc-Nickel Alloy
• per ASTM B841
• with Chromate – Metallic Grey / Black
/ Yellow
Additional Comments:
Company Name:
Street Address:
City / Country
E-mail Address:
Select business that best describes your company Supplier NVOCC Carrier
Section 3: Certification
1) Is your Company a certified participant in a government-sponsored supply chain security program (eg. C-TPAT) YES NO (Check One)
3) If no, do you plan to become certified within 12 months ?: YES NO (Check One)
1 - YES
PROVIDE CODE AND COMMENTS THAT BEST DESCRIBES 2 - PARTIALLY IN PLACE
YOUR CURRENT SITUATION FOR EACH ITEM 3 - NOT NOW - MAY CONDIER AT LATER DATE
4.6 Are there CCTV cameras and if so, who monitors them?
4.7 Does the CCTV system cover interior and exterior areas?
TARGET
DATE
No. Section 5: Access Controls Code Current status RECOMMENDED IMPROVEMENTS COMPLETION
COMPLETED
DATE
Do you employ an identification system for all employees?
5.1
Describe method - badges, etc.
TARGET
DATE
No. Section 7: Personnel Security Code Current status RECOMMENDED IMPROVEMENTS COMPLETION
COMPLETED
DATE
Do you conduct pre-employment screening and interviewing
7.1
of prospective employees?
TARGET
DATE
No. Section 8: Documentation Security Code Current status RECOMMENDED IMPROVEMENTS COMPLETION
COMPLETED
DATE
Do you have controls in place to check the accuracy of all
8.1 shipping documentation, to include invoices and packing
lists?
TARGET
Section 10: Conveyance and Manifest DATE
No. Code Current status RECOMMENDED IMPROVEMENTS COMPLETION
Security COMPLETED
DATE
Do you maintain processes to protect against the
10.1 introduction of unauthorized personnel and material in the
supply chain?
TARGET
Section 11: FOREIGN DATE
No. Code Comments RECOMMENDED IMPROVEMENTS COMPLETION
Container Security (if applicable) COMPLETED
DATE
Do you have documented procedures for affixing, replacing,
11.1 recording, tracking and verifying seals on containers or
trailers?
CERTIFIED TO BY REVIEWED BY
_______________________________________________ ___________________________________________________
Print Name Name (Southco Reviewer)
_______________________________________________ ___________________________________________________
Signature Title
_______________________________________________
Reason:
DO NOT SOURCE
Reason:
SOURCE
Comments:
DATE:
Buyer
DATE:
Supplier Quality Engineer
DATE:
Regional Supply Chain Manager