Sunteți pe pagina 1din 3

MAIN PAGE

CHAPTER 12

PLANTING REQUIREMENT

DRAWING TITLE DRAWING NO. REVISION

SOIL AERATION (SHEET 1 OF 2) LTA/SDRE14/12/PNR1 A

SOIL AERATION (SHEET 2 OF 2) LTA/SDRE14/12/PNR2 A


CHAPTER 12 - MAIN PAGE NEXT
C D E
12000
AERATION TROUGH SDRE14/12/PNR2
SDRE14/12/PNR2
SDRE14/12/PNR2
12000
EDGE OF CARRIAGEWAY

FOOTPATH CUM DRAIN TREE PLANTING STRIP

AN
CENTRE M EDI
NG

4000

2000
CONTRACT DRAW I
A TREE PLANTING STRIP B
ON,
M ENSI
REFER TO
FOR DI

VERGES & SERVICES


EDGE OF CARRIAGEWAY
E APPROVED SOIL MIX
250 DIA UPVC
6000
2000 2000 (HEAVY DUTY) PIPE SDRE14/12/PNR2
APPROVED EDGE OF CARRIAGEWAY
SOIL MIX
C D PROPOSED SOIL AERATION AT CENTRE MEDIANS (FOR NORMAL CROSSFALL)
SDRE14/12/PNR2 SDRE14/12/PNR2
SCALE 1:150

PROPOSED SOIL AERATION AT SIDETABLE


SCALE 1:150

FALL
APPROVED SOIL MIX
EDGE OF CARRIAGEWAY
12000 12000

AN
E MEDI
4000

2000
CENTR
AERATION TROUGH APPROVED SOIL MIX B
TREE PLANTING STRIP

1000

375
4000 6000
1 EDGE OF CARRIAGEWAY
250 DIA UPVC

FALL
(HEAVY DUTY) PIPE CLOSED DRAIN

AERATION TROUGH WRAPPED ROUND


SECTION A-A WITH GEOTEXTILE AS SPECIFIED PROPOSED SOIL AERATION AT CENTRE MEDIANS (FOR SUPERELEVATION)
SCALE 1:150 IN M&W SPECIFICATIONS SCALE 1:150
20 DIA HOLES AT
100 C/C ALONG
250 DIA UPVC
(HEAVY DUTY) PIPE
200

12000
85
500
700

20 SIZE STONE
AERATION TROUGH APPROVED SOIL MIX
115

1000
2000

DETAIL 1
SCALE 1:50
SECTION B-B
SCALE 1:150
NOTES:
5. Low plants can be permitted in front of the road-signs.The choice of
1. Tree planting strip is to be excavated to 1.0m deep ready to receive these plant shall take into account the need to do pruning so as to
loamy soil from Nparks. keep the height of these plants at a manageable level.
STANDARD DETAIL
2. Service verge is to be excavated to 0.6m deep ready to receive 6. Trees planted along curve section of road shall not obstruct the
loamy soil from Nparks. required sight visibility around the bends otherwise no planting zone
3. Aeration trough is required when area of tree planting strip / verges and shall be implemented or low height shrub shall be considered.
services are less than 12 sqm. 7. Tree / shrubs shall not be planted right before non-signalised road
SOIL AERATION DRAWING NO. REV.
4. Tree planted shall have clear sight distance in front the road signs as follow: junction unless sufficient intersection sight distance can be achieved.
(SHEET 1 OF 2) LTA/SDRE14/12/PNR1 A
ROAD TYPE CLEAR DISTANCE
EXPRESSWAY 75m A SEPT 2017 DATE OF ISSUE SCALE SHEET NO.

OTHER ROAD 45m REV. DATE 1st APR 2014 AS SHOWN 1 OF 2

12-1
CHAPTER 12 - MAIN PAGE PREVIOUS
CARRIAGEWAY VERGES & SERVICES 1500 / 2000 1800

TREE PLANTING STRIP FOOTPATH CUM CARRIAGEWAY VERGES & SERVICES 1500 / 2000 1800
DRAIN
APPROVED CLOSED-TURFING TREE PLANTING STRIP FOOTPATH CUM
DRAIN
20 DIA HOLES ON

600
APPROVED CLOSED-TURFING
UPVC AT 100 C/C
1
:

600
40
FALL 1
:40

FALL

1:20

1:20
APPROVED
SOIL MIX
250 DIA UPVC (HEAVY DUTY) PIPE

250 DIA UPVC (HEAVY DUTY) PIPE


2m X 2m X 0.7m TROUGH OF UNIFORM
APPROVED SOIL MIX
20mm GRADED STONE WRAPPED ROUND
WITH GEOTEXTILE AS SPECIFIED IN
M&W SPECIFICATIONS
SECTION D-D
SECTION C-C
WITHOUT AERATION TROUGH
WITH AERATION TROUGH
REF DWG NO: SDRE14/12/PNR1
REF DWG NO: SDRE14/12/PNR1
SCALE 1:50
SCALE 1:50

CARRIAGEWAY 4000 CARRIAGEWAY


CARRIAGEWAY VERGES & SERVICES 2000 1800
CENTRE MEDIAN
2000 TREE PLANTING STRIP FOOTPATH CUM
DRAIN

APPROVED

1000
CLOSED-TURFING

600
1:
40

FALL

FALL FALL
1:20
600

1000

250 DIA UPVC (HEAVY DUTY) PIPE


APPROVED SOIL MIX
2

APPROVED SOIL MIX


SECTION D-D
SECTION E-E
SIDETABLE MORE THAN 6m
(FOR OTHER ROAD)
REF DWG NO: SDRE14/12/PNR1
REF DWG NO: SDRE14/12/PNR1
SCALE 1:50
SCALE 1:50 NOTE:
Concrete sump to be provided when length of UPVC scupper is more than 6m.
CARRIAGEWAY 4000 CARRIAGEWAY

1000 1000
2
VEHICULAR 1000 CARRIAGEWAY 125 600 SDRE14/4/GRA3B
VEHICULAR
IMPACT GUARDRAIL IMPACT GUARDRAIL (SEE ANGLE FRAME FOR
VEHICULAR PEDESTRIAN
125 300 PEDESTRIAN GRATING)
IMPACT GUARDRAIL GRATING

APPROVED
600 X 300
SOIL MIX WSFR B6 WSFR B6 A
FALL FALL FALL PRECAST

300
CONCRETE SDRE14/4/GRA2A
250 DIA UPVC SUMP GRADE 30
(SEE PEDESTRIAN
(HEAVY DUTY) FALL CONCRETE
1000

GRATING FOR SUMP


PIPE
1000

WITH M.S. PLATE)


50 THK LEAN

100
CONCRETE
250 DIA UPVC B
F (HEAVY DUTY)
APPROVED SOIL MIX PIPE MILD STEEL PLATE SDRE14/4/GRA2A
SECTION E-E (SEE DWG NO. (SEE PEDESTRIAN GRATING FOR
SDRE14/4/GRA2A) SUMP WITH M.S. PLATE)
SECTION E-E (FOR OTHER ROAD WITH DETAIL 2 SECTION F-F
SCALE 1:50 SCALE 1:50 PEDESTRIAN GRATING
(FOR EXPRESSWAY) VEHICLUAR IMPACT GUARDRAIL)
SCALE 1:25
SCALE 1:50 SCALE 1:50

NOTES: STANDARD DETAIL


1. The spacing for M.S. pedestrian gratings shall be 18m when the drain depth
is more than 1m. Refer to the table in DWG No: LTA/SDRE14/4/GRA1
for the type and spacing of the pedestrian grating.
2. 2m soil depth from the ground level at the planting verge to be free of any debris,
DRAWING NO. REV.
SOIL AERATION
hardcore and other form of construction wastage like concrete
(SHEET 2 OF 2) LTA/SDRE14/12/PNR2 A

A SEPT 2017 DATE OF ISSUE SCALE SHEET NO.

REV. DATE 1st APR 2014 AS SHOWN 2 OF 2

12-2

S-ar putea să vă placă și