طراحي و مهندسي تفصيلي
»«خط لوله ششم سراسري گاز ايران
NOTES :
5. TRANSMITTER SHALL BE SMART (CPU BASED) AND SUITABLE FOR HART PROTOCOL COMMUNICATION.
6. ZERO AND SPAN ADJUSTMENT SHALL BE INCLUDED AND BE ACCESSIBLE FROM OUTSIDE IN ADDITION TO HHC.
7. OVER RANGE PROTECTION (AT LEAST 30% FULL SCALE) SHALL BE PROVIDED.
8. MANIFOLD RATING SHALL BE COMPLIED WITH ASME/ANSI B16.34. CONNECTION OF TWO VALVE MANIFOLD IS 1/2"NPTF X 1/2"NPTF.
9. TEST TERMINALS, BYPASS DIODE AND REVERSE POLARITY PROTECTION SHALL BE PROVIDED.
10. M20 ISO CABLE GLAND, NICKEL PLATED BRASS, SUITABLE FOR ARMOURED CABLE SHALL BE PROVIDED BY VENDOR.