Sunteți pe pagina 1din 47

om

l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Principle of a frequency inverter ....................................................................................................... 3


Power Module Overview (1) ............................................................................................................. 5
Power Module Overview (2) ............................................................................................................. 6
Power Module Overview (3) ............................................................................................................. 7
Power Module PM230
om
...................................................................................................................... 8
Power Module PM240 / PM340 ........................................................................................................ 9
l.c
Power Module PM250 / PM260 ........................................................................................................ 10
Power Module PM240-2 ................................................................................................................... 11
ai

SINAMICS G120C .......................................................................................................................... 12


SINAMICS G120D .......................................................................................................................... 13
gm

Electromagnetic compatibility ........................................................................................................... 14


Notes on installation ......................................................................................................................... 16
Intelligent Operator Panel IOP .......................................................................................................... 18
@

Exercise 1: Commissioning with IOP ................................................................................................ 22


Exercise 1: Commissioning with the IOP .......................................................................................... 23
Exercise 1: Commissioning with IOP ................................................................................................ 24
0

Exercise 2: Changing parameter settings ......................................................................................... 25


01

Exercise 3: Operation with the IOP ................................................................................................... 26


Exercise 4: Factory settings with IOP ............................................................................................... 27
l2
pa
el
ne

SITRAIN 9-1
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Power Module The power modules supplies the motor in the power range from 0,37 kW to 250
kW. IGBT- technology with pulse width modulation guarantees a higly reliable and
flexible operation of the motor.

IOP om
The Intelligent Operator Panel is a convenient alternative to the BOP-2. The
graphic display facilitates work and can even display characteristic curves.
l.c
Application macros The interconnection of inputs/outputs is a task that is required for almost every
commissioning operation. Numerous parameters must be set here. The macros set
ai

all parameters for the particular requirements at the touch of a button.


gm
@
0
01
l2
pa
el
ne

SITRAIN 9-2
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Mode of operation In a rectifier circuit the three-phase current from the power supply is rectified. This
results in a DC voltage, which is buffered by capacitors (DC link).
A power section with transistors takes this DC voltage and generates a three-phase
current with a variable frequency and voltage from it.

V/f characteristic
om
Variable voltage? The motor primarily represents an inductive resistance for the
current flow. When the frequency increases, so does the inductive resistance. The
l.c
inverter must therefore increase the output voltage in proportion to the output
frequency. This relationship is referred to as the V/f characteristic.
ai

Free-wheeling diodes As the motor represents inductive resistance, the current flow is smoothed.
gm

To enable the current to continue to flow when the transistors pause, there is one
built-in diode for each transistor.

Note The diagram above shows the principle of how an inverter works. Today, (almost)
@

all inverters for three-phase motors function according to this principle. Additional
components such as reactors, fuses, braking resistors, etc., are not shown.
0
01
l2
pa
el
ne

SITRAIN 9-3
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Switching frequency The DC link voltage is switched on and off in order to produce the variable voltage
at the inverter's output.
A fixed switching frequency (pulse frequency) of a few kHz is employed.
Pulse-width
modulation om
The mean value of the output voltage is the crucial factor. This value is varied as a
function of the switch-on/switch-off timing. Therefore, the width of the pulses
changes at a constant switching frequency (pulse-width modulation - PWM).
l.c
Sine-wave A sinusoidal mean voltage value can be generated by continuously varying the
ai

pulse-width modulation. This is the fundamental frequency of the three-phase


current.
gm

Three-phase current If all 6 transistors are triggered in a particular combination, a three-phase current
with a frequency between 0 Hz and 650 Hz is generated (depending on the
particular inverter type and control variant).
@
10
20
p al
el
ne

SITRAIN 9-4
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

PM230 PM230 was specifically designed for drives of pumps, fans and compressors.
Available in IP20 and IP54/55 degrees of protection,
it is optimally suited for building engineering.
Due to the special design with a mains-friendly DC link, no line reactor is needed.
om
This saves space and weight, and reduces power dissipation.

PM240 PM240 implements the principle of a DC link converter that has been used for
l.c
decades. It is also suitable for highly dynamic applications with rapid load changes.
It also controls regenerative operation with braking resistor. In another design, such
power units can be connected together in the DC link to create a multi-motor
ai

system for the SINAMICS S120 converter series.


gm

PM240-2 The second generation of PM240-2 power units will gradually replace the PM240.
The new hardware platform enables higher power density as well as innovative
cooling concepts with push-through
@

technology (PT-technology).

PM250 If load changes and regenerative operation occur, the PM250 is the innovative
solution. 4-quadrant operation and regenerative feedback is allowed. A typical area
0

of application is conveyor technology.


01

PM260 PM260 is currently available for 690 V. Due to the integrated sinusoidal filter on the
l2

motor side, it is suited for long motor cables of several hundred meters.
pa

PM340 PM340 of the SINAMICS S series can be used for single-phase mains terminals in
the lower power range.
el
ne

SITRAIN 9-5
Power Module and Operator Panel
Private copy for Neelanjan Pal, neelpal2010@gmail.com

SITRAIN
ne ne
el el
pa pa
l2 l2
01 01
0 0
@ @

9-6
gm gm
ai ai
l.c l.c
om om

Power Module and Operator Panel


Private copy for Neelanjan Pal, neelpal2010@gmail.com

SITRAIN
ne ne
el el
pa pa
l2 l2
01 01
0 0
@ @

9-7
gm gm
ai ai
l.c l.c
om om

Power Module and Operator Panel


om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

PM230 PM230 was specifically designed for drives of pumps, fans and compressors.
Available in IP20 and IP54/55 degrees of protection,
it is optimally suited for building engineering.

om
Due to the special design with a mains-friendly DC link, no line reactor is needed.
This saves space and weight, and reduces power dissipation.
l.c
PT Push Through, installation with through-hole technology in which the heatsink
extends to back out of the cabinet.
ai

LO Performance data with low overload (LO)


gm

HO Performance data with high overload (HO)


@
0
01
l2
pa
el
ne

SITRAIN 9-8
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

PM240 PM240 implements the principle of a DC link converter that has been used for
decades. It also suitable for highly dynamic applications with rapid load changes. It
also controls regenerative operation with braking resistor. In another design, such

om
power units can be connected together in the DC link to create a multi-motor
system for the SINAMICS S120 converter series.
l.c
PM340 PM340 of the SINAMICS S series can be used for single-phase mains connections
in the lower power range.
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9-9
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

PM250 If load changes and regenerative operation occur, the PM250 is the innovative
solution. 4-quadrant operation and recovery is allowed. A typical area of application
is material handling.

PM260 om
PM260 is currently available for 690 V. Due to the integrated motor-end sinusoidal
filter, it is suited for long motor cables of several hundred meters.
l.c
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 10
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

PM240-2 The second generation of PM240-2 power units will gradually replace the PM240.
The new hardware platform enables higher power density as well as innovative
cooling concepts with push-through
technology (PT).
om
l.c
ai
gm
@
10
20
al
p
el
ne

SITRAIN 9 - 11
Power Module and Operator Panel
om
l.c
ai
gm
@
0 10
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

G120C The SINAMICS G120C compact converter offers a balanced mix of features for a
wide variety of applications. The SINAMICS G120C is a compact, robust and easy-
to-use converter and can optionally be equipped with a simple or convenient
operator panel.
SINAMICS G120C is specifically designed for the requirements of system
om
integrators, OEMs and distributors to provide high productivity and tailored
performance.
l.c
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 12
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

G120D The SINAMICS G120D distributed frequency converter is the solution for
demanding drive tasks especially in the area of conveyor technology. SINAMICS

om
G120D enables stepless speed control of AC induction motors and meets all the
requirements of material handling applications from simple frequency control to
sophisticated vector control.
l.c
IP65 With its sophisticated modular design with IP65 degree of protection, it fits
seamlessly into the system while enabling high system availability combined with
ai

low stocking of spare parts. The innovative recovery power unit concept helps to
gm

save energy. The patented realization concept of integrated safety functions is


unique throughout the world and enables improved plant designs with higher
productivity. This drive can be seamlessly integrated into the Siemens TIA world of
automation by means of PROFIBUS or PROFINET.
@

Power range With it various device models (sizes FSA to FSC) in the power range from 0.75 kW
to 7.5 kW, it is suitable for a variety of drive solutions.
0

CU240D-2 The CUs have been expanded in I/0 scaling. The safety function STO ("Safe
01

Torque Off") is integrated in all variants of the SINAMICS control units. The safety
functions (SLS, SS1) and SDI (Safe Direction) and SSM (Safe Speed Monitoring)
l2

are supported in the failsafe design.


pa

CU250D-2 The CU250D-2 can now implement applications with positioning requirements in
the drive. This enhancement now allows use in hoisting/traverse/travel or rotary
applications.
el

• Vector (VC) and sensorless vector control (SLVC) is possible


• Positioning by means of an encoder (HTL/SSI) or
ne

parallel with two sensors (HTL and SSI)

SITRAIN 9 - 13
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

EMC Electromagnetic compatibility refers to the state in which there is no mutual


interference between technical devices caused by unintentional electrical or

om
electromagnetic effects.

Line side The rapid switching operations in pulse-width modulation with a sharp increase in
l.c
voltage produce effects on the power supply via the DC link and the rectifier. An
EMC filter is always integrated as a counter-measure.
The current harmonics from rectifier circuits contribute to the overall harmonic load
ai

on the power supply. The line-friendly DC link keeps the share of the PM230 very
low.
gm

Motor side Here, too, rapid switching operations in pulse-width modulation present a potential
source of interference. Shielded cables, whose shields are applied to the inverter
and motor with the greatest possible surface area prevent EMC interference.
@
0
01
l2
pa
el
ne

SITRAIN 9 - 14
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Overview .......................................................................................................................................... 3
Modular inverter ............................................................................................................................... 7
Control Units .................................................................................................................................... 9
Asynchronous motor ........................................................................................................................ 17
Commissioning
om
................................................................................................................................ 22
BOP-2 Basic Operator Panel ............................................................................................................ 25
l.c
Exercise 1: Getting to know the training device ................................................................................. 29
Exercise 2: Commissioning with BOP-2 ............................................................................................ 30
ai

Exercise 3: Data backup with BOP-2 ................................................................................................ 36


Exercise 4: Factory settings with BOP-2 ........................................................................................... 37
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 15
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Power Module (PM) Power Modules are available for motor outputs ranging from 0.12 to 250 kW.
They are available with different degrees of protection depending on the installation
location:
• IP55 for installation outside a control cabinet. The opening for the operator
panel is sealed with:
- BOP-2 or
om
- blind cover
(each to be ordered separately)
l.c
• Installation of the IOP assures degree of protection IP54.
• IP20 is the normal degree of protection for installation in a control cabinet.
ai

Control Units (CU) The modular design of the SINAMICS G120 offers different CUs depending on the
gm

application. These are differing in functions and interfaces.

Operator Panels The optional operator panels can be used for commissioning and operator input.
These are attached to the CUs.
@

As an alternative, a PC can be used for commissioning.


0
01
l2
pa
el
ne

SITRAIN 9 - 16
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Distinguishing
features Optimal CU can be used for this depending on the application and the application
scenario. This ensures optimized function and cost for the customer.

Selection of the
Control Unit
om
The optimal control unit is to be selected based on the number of I/Os and
additional functions such as Safety Integrated or HVAC, if necessary. The
communication options are already integrated and do not have to be purchased or
l.c
installed separately. Two product series are available according to their areas of
application:
ai

• CU230 Control Units are especially designed for pumps and fan applications.
• CU240 Control Units are suited for a number of applications for general
gm

mechanical engineering, for example, conveyors, mixers and extruders.


@
10
20
p al
el
ne

SITRAIN 9 - 17
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

CU230P-2 The control units CU230P-2 are designed for drives with integrated technology-
functions for pumps, fans and compressors.
The I/O-interface, the fieldbus-interface and the additional

om
software-functions support these applications. The integration of technology-
functions is a important differentiation to the other control units of the drive family
SINAMICS G120.
l.c
CU240B-2 The control units CU240B-2 are the standard control units with a
basic I/O-set, optimum for many general purpose applications using V/f- or vector-
ai

control.
gm

CU240E-2 The control units CU240E-2 are the standard control units with an
extended I/O-set and Safety Integrated for applications with more complex
requirements using V/f- or vector-control.
@
0
01
l2
pa
el
ne

SITRAIN 9 - 18
Power Module and Operator Panel
Private copy for Neelanjan Pal, neelpal2010@gmail.com

SITRAIN
ne ne
el el
pa pa
l2 l2
01 01
0 0
@ @

9 - 19
gm gm
ai ai
l.c l.c
om om

Power Module and Operator Panel


om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

CU250S-2 The CU250S-2 is designed for applications with encoder feedback and/or high
quantity in I/O‘s:
- Increased robustness of the vector mode for critical applications

om
- Approval of asynchronous 1PH8 motors in vector mode
- Extended connectivity for encoders for speed and position
- Increased functionality by further Safety functions and Simple Positioning BPOS
l.c
ai

Safety Integrated Basic Safety functions are available, extended Safety functions can be used with a
license.
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 20
Power Module and Operator Panel
20
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Onboard-Interfaces All types of standard encoders can be connected to the CU250S-2. For Vector-
Control it is possible to connect two encoders (for speed and positioning).

om
l.c
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 21
Power Module and Operator Panel
21
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

positioning Besides the functions for controlling the speed and torque the CU250S-2 provides
a software package for positioning, which can be selected during configuration. The
package is called basic positioner (Bpos).

Bpos om
Selecting Bpos there are functions for controlling the setpoint with
• Jog
• homing
l.c
• Direct setpoint specification / MDI (Manual Data Input)
ai

• Traversing blocks
and a position controller which can be parameterized.
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 22
Power Module and Operator Panel
22
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Analog inputs The two analog inputs AI0 and AI1 are usually supplied directly via the 10V output.
Only one potentiometer is required externally.
These inputs can be switched via DIP switches and then operated with a current

Digital inputs
signal of 0 to 20 mA.
om
The six digital inputs DI0 to DI5 can be supplied directly via the 24V output. Only
the switches are required externally.
l.c
Alternatively, an external voltage source can also be used. In that case, its ground
must be connected with the ground of the terminal strip.
ai

PTC/KTY The following can be connected as motor temperature sensors:


gm

• PTC: e.g. PT100


• KTY: e.g. KTY84
@
0
01
l2
pa
el
ne

SITRAIN 9 - 23
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Analog outputs The two analog outputs AO0 and AO1 are designed for a current signal
of 0 to 20 mA.

Digital outputs The digital outputs have floating contacts.


The following voltage can be used:
• Output DO0 and DO2: 230 V AC
om
l.c
• Output DO1: 30 V DC
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 24
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Control system Higher-level control of the drive can be performed in different ways:
• Manually
• Via digital and analog signals
• Via fieldbus (e.g. PROFIBUS, CAN, Modbus …)
om
The drive-end interface must be parameterized accordingly.

Inverter The inverter has a host of autonomous functions. These are usually deactivated
l.c
and can be activated and adapted as required. For example:
• Automatic restart after power failure
ai

• PID controller for controlling pressure or level


gm

Motor A different motor to the 4-pole motor with the same power as the inverter is
frequently used. Even if simple operation with incorrect data were possible, the
motor data must be adapted for:
• Good closed-loop control response
@

• Correct functioning of the monitors

Load For optimal operation and reduced wear and tear, the following can be set on the
0

inverter, for example:


01

• Ramp up and ramp down incl. rounding


• Speed and torque limits
• Load monitoring for no-load operation and overload
l2
pa
el
ne

SITRAIN 9 - 25
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Overview .......................................................................................................................................... 3
Modular inverter ............................................................................................................................... 7
Control Units .................................................................................................................................... 9
Asynchronous motor
Commissioning
om
........................................................................................................................
................................................................................................................................
17
22
BOP-2 Basic Operator Panel ............................................................................................................ 25
l.c
Exercise 1: Getting to know the training device ................................................................................. 29
Exercise 2: Commissioning with BOP-2 ............................................................................................ 30
ai

Exercise 3: Data backup with BOP-2 ................................................................................................ 36


gm

Exercise 4: Factory settings with BOP-2 ........................................................................................... 37


@
0
01
l2
pa
el
ne

SITRAIN 9 - 26
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Access routes The following options are available for commissioning:

BOP-2 or IOP The operator panels are snapped onto the Control Unit. Individual parameters can

om
be changed or monitored directly using the operator panels. Procedures with
operator prompting are offered for commissioning. With the IOP, these procedures
are known as wizards.
l.c
Memory card An existing parameterization can be copied from the first inverter to other identical
inverters.
ai

The contents of the memory card can be read or written to via normal Windows
operation. A parameterization can thus be sent as an e-mail attachment, for
gm

example, and loaded into the drive on-site without a PC.

STARTER For extensive parameterization, the STARTER software is the obvious choice. With
a graphical operator interface and diverse functions, it supports users in many
@

ways with:
• Overview of diagnostics
• Comparison of parameter files
0

• Data backup
01

• Recording of signal characteristics (trace)


• Control panel (switching on, specifying setpoints, etc.)
l2
pa
el
ne

SITRAIN 9 - 27
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Features The Basic Operator Panel 2 is an extremely user-friendly and low-cost operator
panel for SINAMICS G120 frequency inverters.

Ease of use
om
Commissioning of standard drives is easy with the menu-driven dialog on a
2-line display. Simultaneous display of the parameter and parameter value, as well
as parameter filtering, means that basic commissioning of a drive can be performed
l.c
easily and, in most cases, without a printed parameter list.
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 28
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

MONITOR Each press of the key jumps to the next display value. In this way, the user can
quickly gain an overview of the capacity utilization of the drive.

CONTROL
om
When changing from automatic mode to manual mode, the following can be
specified here:
• SETPOINT: Modification of the setpoint using the up/down keys
l.c
• JOG: Jog mode at a lower speed (parameterizable)
• REVERSE: Braking and then operation in the opposite direction
ai

DIAGNOS You can obtain an overview of pending and previous fault messages here.
Acknowledgement of the messages for a new start can also be found here.
gm

PARAMS The parameters can be accessed directly here. For simple applications, the filter
setting "Standard" is sufficient. This makes the parameter list shorter and clearer.
@

SETUP This menu item leads to the initial commissioning.

EXTRAS Copying and loading of parameter sets can be initiated here:


0

• Between the Control Unit and the BOP-2


01

• Between the Control Unit and the MMC (if present)


l2
pa
el
ne

SITRAIN 9 - 29
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Filter For simple applications, the "Standard" level is sufficient. This makes the
parameter list clearer and the next required parameter is reached more quickly.
The "Expert" level shows all parameters in the same way as they can also be found

ESC key
in the expert list of the STARTER software.
om
The "Escape" key exits the different menu items and returns to the starting point.
l.c
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 30
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Direct selection The entire value list is run through:


• Parameter numbers or
• parameter values

om
This is convenient if the required values are close together. In the case of large
changes, the pass can take more time and then the digit-by-digit method can be
used.
l.c
Digit-by-digit You change to this mode by pressing the OK key for approximately 2 seconds.
Now you can change the flashing digit.
ai

Brief pressing of the OK key takes you to the next digit.


With the ESC key, you can jump back one digit.
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 31
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Task Find out the motor data which will be needed later for commissioning!
First, find out how the motor is connected:

om
• Star (wye) connection (Y, 400 V) or
• Delta connection ( 230 V)
There are different training devices in use, so if necessary, ask your course
l.c
instructor.

1. Order number:
ai

…………………………………………………………………………………
gm

2. Rated voltage:

…………………………………………………………………………………
@

3. Rated current:

…………………………………………………………………………………
4. Rated output:
0
01

…………………………………………………………………………………
5. Power factor cos :
l2

…………………………………………………………………………………
pa

6. Rated speed:

…………………………………………………………………………………
el
ne

SITRAIN 9 - 32
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Requirements You will need a G120 training case with CU2x0x-2 and BOP-2.
Task You are now going to perform basic commissioning of the drive for a pump/fan
application.

om
The inverter must have "U/f control with quadratic/parabolic characteristic" as the
control mode, and the CU inputs as the command and setpoint sources. To do this,
work through the 15 steps described below.
Note Please remember that the asynchronous motor is connected for 400 V, that is, it is
l.c
star-connected (Y).
The parameter which is changed in order to complete the relevant basic
ai

commissioning step is given in each case in parenthesis below.


gm

1. Use the ESC key and the keys to navigate between menu levels.
2. Select menu level "SETUP" and then press the OK key.
3. The "RESET" step enables you to restore the unit to its factory settings. Select
"YES" and confirm by pressing the OK key. Wait until the "DONE" display
@

appears. When you perform a Reset, you restore all parameter values to their
default (factory) settings.
4. You select the control mode in the step "CRTL MOD".
0

Select "VF QUAD" for the control mode "U/f control with quadratic/ parabolic
01

characteristic". Continue with "OK". (p1300)


5. With the step "EUR/USA" you select the relevant standard and therefore the
units for the remainder of the commissioning process: EUR for IEC or USA for
l2

NEMA.
Select "KW 50 HZ". Continue with "OK". (p100)
pa

6. Enter the motor rated voltage as the setting for "MOT VOLT"
(see rating plate or Exercise 1). Continue with "OK". (p304)
el

7. Enter the motor rated current as the setting for "MOT CURR".
Continue with "OK". (p305)
ne

SITRAIN 9 - 33
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

8. Enter the motor rated power in KW (IEC) as the setting for "MOT POW".
Continue with "OK". (p307)
9. Enter the rated speed in rpm as the setting for "MOT RPM".
Continue with "OK". (p311)
10.You can select whether or not to perform a motor identification run in the step
m
"MOT ID". Read the Note below for further information.
Select the "STILL" option. Continue with "OK". (p1900)
co
Note If you select MOT ID (p1900) during basic commissioning, alarm A07991 will
l.

appear at the end of the commissioning process. To enable the inverter to identify
ai

the data for the connected motor, you must switch on the motor (e.g. via the BOP-
2). The inverter switches off the motor after the motor data identification has been
gm

completed.

NOTICE! Motor data identification with hazardous loads!


Before you start the motor data identification run, you must secure any hazardous
@

plant sections by cordoning off the danger zone, for example, or by lowering a
suspended load onto the ground.
If in doubt, you should dispense with rotating measurement and only carry
10

out the motor data identification during standstill!


20
pal
el
ne

SITRAIN 9 - 34
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Task (continued) Now change the relevant parameter settings


(cf. step 12 of basic commissioning process):

1. Use the ESC key and the


om
keys to navigate between menu levels.
2. Select menu level "PARAMS" for the parameters and then press the
OK key.
l.c
3. Select "STANDARD FILTER" with "OK".
4. Use the keys to navigate to parameter p1080.
ai

5. Press OK and use the keys to set the minimum speed to the value which
you calculated in the previous subtask.
gm

6. Confirm your input with "OK" and press the ESC key repeatedly until you reach
the status display again (MONITOR).
@

Note Your training device might be a 3-phase PM240 unit for 400 V that is connected to
a 230 V supply with a single phase. With this type of training case, the supply
voltage is raised internally.
0

One of the ways of detecting this is that fault F6310 "Supply voltage (p0210)
01

incorrectly parameterized" will be displayed. The training case might malfunction as


a result.
To prevent this problem, you should use the "EXPERT FILTER" following the
l2

procedure described above to set parameter


pa

p210 (device supply voltage) = 460 V.

If you are uncertain, please ask your instructor for advice.


el
ne

SITRAIN 9 - 35
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Requirements You have completed Exercise 3


Task You can upload data to a BOP-2 and download them again back to the drive from
the BOP-2. You can use this function to perform series commissioning on drives of
the same type, for example.
om
In this exercise, you are first going to upload the current data set to the BOP-2 and
then restore the drive to its factory settings. You are then going to download the
l.c
data set to the drive again and perform a function test.
1. Use the ESC key and the keys to navigate between menu levels.
ai

2. Select menu level “EXTRAS" and then press the OK key.


3. Select "RAM -> ROM" and confirm with "OK" in order to safely transfer the
gm

current data to the EEPROM of the drive and then wait until the drive has
finished storing the data.
4. Now select "TO BOP" and "OK" in order to upload the current data set to the
BOP. The BOP-2 shows a progress display of the upload operation. Wait until "-
@

DONE-" is displayed.
5. Now restore the factory settings on the drive.
To do this, continue with Exercise 5 and return to this exercise again afterwards.
0

6. By actuating switches DIN0 to 2, check that the factory settings are restored on
the drive and that the drive is no longer responding.
01

7. Now select option "FROM BOP" in menu “EXTRAS" and press "OK" in order to
download the current data set from the BOP-2 back to the drive.
l2

8. When the download is finished ("-DONE-"), switch off the power supply. Wait
until all LEDS have gone out. Now switch the power supply on again.
pa

9. Now test the drive to check whether it is functioning as described in Exercise 3.


el
ne

SITRAIN 9 - 36
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Requirements You will need a G120 training case with CU2x0x-2 and BOP-2.
Safety functions must be disabled if the Control Unit has any.

om
Task In order to create a starting point for continuing commissioning with the
BOP-2, you are going to restore the factory settings on the G120.
Restoring factory settings with the BOP-2:
1. Use the ESC key and the keys to navigate between menu levels.
l.c
2. Select menu level “EXTRAS" and then press the OK key.
3. Select option "DRVRESET" in order to restore the factory settings and confirm
ai

the restore operation by pressing the OK key twice.


gm

The BOP-2 will display "-BUSY-" for several seconds and then "-DONE-" once the
factory settings have been restored.

The factory settings have now been restored on the inverter.


@

Note When you restore the inverter to its factory settings, the bus address and baud rate
remain unchanged.
0
01
l2
pa
el
ne

SITRAIN 9 - 37
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Overview .......................................................................................................................................... 3
Modular inverter ............................................................................................................................... 7
Control Units .................................................................................................................................... 9
Asynchronous motor
Commissioning
om
........................................................................................................................
................................................................................................................................
17
22
BOP-2 Basic Operator Panel ............................................................................................................ 25
l.c
Exercise 1: Getting to know the training device ................................................................................. 29
Exercise 2: Commissioning with BOP-2 ............................................................................................ 30
ai

Exercise 3: Data backup with BOP-2 ................................................................................................ 36


gm

Exercise 4: Factory settings with BOP-2 ........................................................................................... 37


@
0
01
l2
pa
el
ne

SITRAIN 9 - 38
Power Module and Operator Panel
om
l.c
ai
gm
@
0 10
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Properties The Intelligent Operator Panel IOP is a user-friendly and powerful operator panel.
Thanks to the large plain text display, the menu prompting and the application
wizards, it is easy to perform commissioning.

Parameters A drive can be essentially commissioned without having to use a printed parameter
om
list, as the parameters are displayed in plain text, explanatory help texts are
available, and the parameter filtering function is provided.
l.c
Wizards Application wizards interactively guide you when commissioning important
applications such as conveyor technology, pumps, fans and compressors. The
ai

basic commissioning wizard is available for general commissioning.


gm

Control The manual control of drives is performed easily using directly assigned buttons
and the navigation wheel. The IOP has a dedicated switchover button to switch
over from the automatic to the manual mode.
@

Diagnostics The frequency inverter can be diagnosed in a user-friendly fashion using the plain
text display of faults and alarms. Help texts can be obtained by pressing the INFO
button.
0

Up to two process values can either be graphically or numerically visualized on the


01

status display. Process values can also be displayed in technological units.


l2
pa
el
ne

SITRAIN 9 - 39
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Wizards The IOP wizards are question-based macros that support the user when setting up
the various functions and applications of the inverter.

Control
om
The "Control" menu can be used to control the drive and change settings
in real time.
l.c
Note Further information is provided in the “Operating Instructions SINAMICS IOP “.
Make sure you have the current firmware version.
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 40
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Menu When the "Menu" option is selected, the following functions are displayed:
• Diagnostics includes all diagnostic functions
• Parameters, where you can display and modify parameters
• Wizards, shortcut to "Wizards" main menu
• Up/Download for managing data storage
• Extras (see following page).
om
l.c
Note Further information is provided in the " Operating Instructions SINAMICS IOP“.
Make sure you have the current firmware version.
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 41
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
l2
Private copy for Neelanjan Pal, neelpal2010@gmail.com

pa
el
ne

Tools If you select "Menu" followed by “EXTRAS“, the following functions are displayed:
• Status screen wizard, where you can adapt the status display
• Drive identity, where you can see the technical data for the components
• Parameter settings for changing parameter access rights
om
• panel settings, where you can adapt the panel settings

Note Further information is provided in the "Operating Instructions for the Intelligent
Operator Panel“. Make sure you have the current firmware version.
l.c
ai
gm
@
0
01
l2
pa
el
ne

SITRAIN 9 - 42
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Requirements You will need a SINAMICS G120 training case with a Control Unit (CU2x0x-2) and
an IOP operator panel.

Task Perform basic commissioning using the IOP.


om
The inverter should be operated in the control mode "V/f control with quadratic
l.c
characteristic“. The inputs of the terminal strip are used as command and setpoint
sources.
ai

Note Please make sure that the motor is connected:


• Star connection (Y, 400 V) or
gm

• delta connection ( 230 V)


If necessary, ask your course leader because the training cases may differ.
@

1. Select "Wizards" and click OK.


2. Select "Basic commissioning".
3. The 1st step "factory Reset" allows you to restore the parameters to their factory
settings (in every wizard). Select "Yes" and confirm by pressing the OK key.
0

4. Select "V/f with quadratic / parabolic characteristic" as the control mode.


01

5. Progress through the following screens to enter the motor data, but retain the 50
Hz characteristic.
l2

6. When you reach the input screen for the motor voltage, enter the motor data
specified on the rating plate in the following screens.
pa
el
ne

SITRAIN 9 - 43
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

7. Select "Identification standstill" in the "Motor data ID" step.

Note If you have selected "Motor data ID", alarm A07991 will appear at the end of the

om
basic commissioning process. To enable the inverter to identify the data of the
connected motor, you must switch on the motor (e.g. via the IOP). The inverter
switches off the motor after the motor data identification has been completed.
l.c
NOTICE! Motor data identification with hazardous loads!
Before you start the motor identification run, you must secure any hazardous plant
ai

sections by cordoning off the danger zone, for example, or by lowering a


gm

suspended load onto the ground.


If in doubt, omit rotational measurement and perform only motor data
identification at standstill!
@
0
01
l2
pa
el
ne

SITRAIN 9 - 44
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el

Note Your training device might be a 3-phase PM240 unit for 400 V that is connected to
ne

a 230 V supply with a single phase. With this type of training case, the supply

om
voltage is raised internally.
The training case might malfunction as a result. To prevent this problem, you
should use the expert list to set parameter p210 as follows.
l.c
p210 (device supply voltage) = 460 V.
ai

If you are uncertain, please ask your course leader for advice.
gm

Task If necessary, use the IOP to set parameter p210 to 460 V.


1. Select "Menu" and click OK.
2. Select "Parameters" and then “search by number".
@

3. Use the navigation wheel to enter the number "00210".


After you have confirmed with "OK", the parameter “p210 U_Connection" is
displayed.
0

4. Use the navigation wheel to change the parameter setting to 460 V.


01

Confirm with OK.


5. Press the ESC key repeatedly until you reach the status display again.
l2
pa
el
ne

SITRAIN 9 - 45
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Task You have now finished parameterizing the inverter, but it is not yet ready for
operation. You now need to start the motor data identification routine.
You now need to start the inverter in order to perform the motor data identification.
To do this, carry out the steps described below:
om
1. Using the "MANUAL/AUTO" key, switch to the MANUAL operating mode
("HAND" symbol appears in the status display).
l.c
2. Switch on the inverter by pressing the "I" key and wait until the measurement is
complete.
3. Using the "MANUAL/AUTO" key, switch to the AUTO operating mode again
ai

("AUTO" symbol appears in the status display).


The inverter is now ready to operate.
gm

Test the functions In step 8 you selected "Standard I/Os with analog setpoint" (this corresponds to
macro no. 12). With this selection, the command and setpoint sources in the CU
@

were connected as specified below:


• Switch DIN0 (DI0) ON/OFF 1 On/Off switch
• Switch DIN0 (DI1) Reversing Reverse direction of rotation
• Switch DIN0 (DI2) Acknowledge Faults can be acknowledged
0

• Lamp RL1 (DO0) Fault One/several faults pending


01

• Lamp RL2 (DO1) Alarm One/several alarms pending


• Lamp RL3 (DO2) Operation Inverter is running
l2

• Pot. ADC0 (AI0) Setpoint Speed setpoint setting


Test these connections and monitor the display on the IOP.
pa

Note You will find a detailed description of all available macros in Chapter 3.4.5
"Selecting the interface assignments" in the Operating Instructions.
el
ne

SITRAIN 9 - 46
Power Module and Operator Panel
om
l.c
ai
gm
@
0
01
Private copy for Neelanjan Pal, neelpal2010@gmail.com

l2
pa
el
ne

Requirements You will need a G120 training case with a Control Unit (CU2x0x-2) and an IOP.
Disabled safety functions if the Control Unit has safety functions.

Task
om
In order to create a starting point for continuing commissioning with the IOP, you
should restore the factory settings on the G120.
Restoring the factory settings using the IOP:
l.c
1. Select "Menu" and click OK.
2. Select “EXTRAS" and confirm with OK.
ai

3. Select “parameter settings" and confirm with OK.


4. Select "drive factory reset".
gm

5. Acknowledge the prompt with "yes".


6. The IOP will display "in progress… please wait" for several seconds and then
finally "Factory reset completed successfully“.
The factory settings have now been restored on the inverter.
@

Note Every IOP wizard features an option which allows you to restore factory settings.
You are advised to make use of this option when you are working with the wizard.
0

Then you will not need to carry out the above steps separately.
01

When you restore the inverter to its factory settings, the bus address and baud rate
remain unchanged.
l2
pa
el
ne

SITRAIN 9 - 47
Power Module and Operator Panel

S-ar putea să vă placă și