3. In your company individual movable aggregates have a complex structure and the
use of functional locations is not supported. What is the alternative option?
4. What are the two different types of statuses to describe and ascertain whether
or not a technical object is available for particular operations?
5. How do you assign vendor 1000 as the responsible vendor and user USER101 as the
responsible user to your piece of equipment E1?
a) Goto -> Equipment b) Goto -> Partners c) SAP menu -> Logistics -> Plant
Maintenance -> Management of technical objects -> Partners -> Change d) SAP menu ->
Logistics -> Plant Maintenance -> Management of technical object -> Equipment ->
Change
a) No, BOM has to be related to only specific plant b) Yes, through Group BOM c)
Yes, through Stock BOM d) Yes, through complex BOM
7. Which types of materials are used if you have to track the cash in the Plant
Maintenance Information System, but do not require inventory management?
Note: More than one correct option
8. Assume a scenario where all objects of the same construction type use the same
material BOM and you want to avoid creating equipment BOM for each individual
object. Which type of assignment do you prefer?
9. In general if you enter a material that already has a serial number profile for
the serialization of individual pieces of equipment in the equipment master record,
the system displays the last serial number assigned for this material (if a serial
number was already assigned). But where do you perform the actual assignment?
10. When goods are moved, the fields relevant for the stock are checked. After the
movement the serial number is updated with the current stock data from the
inventory management. What happens when the data does not correspond during the
movement?
11. Which type of preventive maintenance enables you to plan maintenance based on
counter reading that are managed for the technical objects to be maintained?
13. Assume a scenario where you entered a measurement document on 01.05. This has
been transferred to equipment P-1000 using the functional location hierarchy. On
17.05, you enter the equipment P-1000 is replaced by equipment P-2000 with a
historical reference data 22.04. What happens to the measurement document for
equipment P-1000 and P-2000?
14. Which types of task list are object-based and created for a specific,
individual piece of equipment?
15. How do you assign stock materials which are not listed in the bill of materials
for the maintenance object, directly in the maintenance task list?
16. You want to determine the costs for equipment task lists and functional
location task lists. Can you run the cost analysis program for both task lists
types at once?
a) You can run the cost analysis program for both task list types at once b) You
can only execute the cost analysis program for one task list type at once c) Yes
but result will not be accurate d) Only for external processing operations
17. How do you generate short orders without a task list if no task has been
entered in the maintenance item for the maintenance plan?
a) The system copies the short text for the maintenance plan into the maintenance
order as an operation description b) The task list has to be entered compulsorily
c) Task list is generated but the planner cannot add additional operations to the
maintenance order d) This leads to errors in scheduling data
18. What status will be set in the maintenance plan if you use the deactivate
function to block maintenance plans for a certain period of time?
19. What happens if no scheduling period is defined in the maintenance plan when
the current waiting call is converted into an order?
21. Which task list do you prefer if you have to group operations for objects that
are only slightly different?
a) Single Task list b) Combined Task list c) Detailed Task list d) Configurable
Task list
22. In which case the active maintenance dates during the period in question are
used for the cost estimate?
23. Which profile does the system use to determine at which times and over which
time period certain tasks must be performed for this notification?
24. How do you notify an external company automatically (for example, by automatic
fax or email) when the service entry sheet is called?
25. Which of the following determines the maintenance package will be performed if
two maintenance packages are due at the same time?
26. Which type of task list can be used with engineering change management?
27. How do you extend or shorten the maintenance cycle for example to react to
temporarily additional requirements without changing the maintenance strategy?
29. Which type of maintenance plans must be configured so that right maintenance
date is calculated to match the actual running performance?
30. In performance-based maintenance plans which of the following user exit can you
use to determine (according to your own rules) which maintenance package will next
fall due, dependent upon the previous counter reading?
31. What is the maximum number of time-based cycles that can be used in a multiple
counter plan?
32. Which of the following parameter in multiple counter plan defines the call date
for the order in relation to the calculated planned date and thereby also the basic
start date for the maintenance order?
33. Which type of task list enables you to group operations for objects that are
only slightly different?
34. The vehicle is to undergo a small inspection after 15000 kilometers and/or one
year. After another 15000 kilometers and/or two years a major inspection is to be
carried out. You used a multiple counter plan and defined two cycle sets for this
with the cycles stated. You assign each cycle set (for example cycle set 1 and
cycle set 2) to a maintenance item. One maintenance item contains the small
inspection, the other the major inspection. How can you define how often a cycle
set is used in a sequence to calculate a date before the system switches to the
next cycle set?
36. When a maintenance plan is created with reference to a contract item, the
system automatically copies certain data into the maintenance plan. The start date
is proposed from which of the following?
a) General task list b) Object task list c) Contract header d) Contract item
37. In which table can you find information whether users are allowed to switch
between the SAP menu and their user menus?
38. While using F4 help what is the default value for the maximum number of hits
displayed?
39. In the main of a technical system which tasks comprises determining the actual
condition and restoring the target condition.
40. In SAP Net Weaver, how do you offer users with the possibility of providing the
respective user with a customized application menu that includes precisely the
transactions that are needed for his daily work?
41. Which of the following function of the work center can be used to determine the
dates when operations should he performed?
42. How do you map more complex technical systems, equipment to map individual
objects, and maintenance bills of material to map spare parts?
44. In which phase of corrective maintenance does the orders runs through different
checks such as material availability checks and capacity planning which are
important for the release of the order?
45. Which type of permits are determined automatically based on a field in the
order header and can likewise influence the order release?
46. Which of the following scheduling parameter in multiple counter plans defines
that the current call object must be completed before a new one is generated?
47. In contrast to the performance-based strategy plan, when you schedule the
multiple counter plans, no high numbers of cycles occur for determining the new
planned date. Instead, scheduling is always calculated from which readings?
48. To assign material components to a general maintenance task list, you must
first enter the following in the general task list header?
49. What will you do if the components that you want to assign to an equipment task
list or functional task list are not available in the respective bill of material
when the assignment is made? Does the system automatically add the freely assigned
material to the bill of material?
a) You can assign stock material freely b) You cannot assign stock material freely
c) The system does not automatically add the freely assigned material to the bill
of material of material d) The system automatically adds the freely assigned
material to the bill of material of material
50. In which type of relationship the start of one operation is linked to the end
of the following operation?
51. In which selection procedure of task list all the task lists, which have been
created for the objects that are sub-objects of the reference object are selected?
a) General task list b) Sub-object task list c) For assembly d) For object
structure
52. When a configurable task list is included in an order, operations are selected
on the basis of characteristics. Operations use objects dependencies and these
object dependencies are a combination of?
53. How do you cover some objects that are maintained in a fixed cycle determined
by a standard?
54. Which of the following can be used for time-based and performance-based
preventive maintenance?
55. In general we use call horizon scheduling parameter to define when the order is
actually generated compared to the planned date. 0% of the cycle would mean?
a) Cycle is generated exactly on the planned date b) Order is generated when the
maintenance plan is started c) Generation of the order would occur abler 81 days d)
The maintenance plan is not scheduled
56. How do you process the maintenance of a technical system which consists of
system parts with different maintenance cycles, should be processed within an
order, this can be performed?
57. In which customizing option for the order type do you define whether the system
should automatically release the maintenance order when it is generated?
59. In which plan can you assign cycle with different dimensions?
a) Single counter plan b) Annual counter plan c) Multiple counter plan d) Reference
counter plan
60. Which of the following factors is set in customizing and represents the link
between PM and QM?
61. What are the two functions to monitor maintenance plans regularly using
deadline monitoring?
62. Which of the following class type is recommended by SAP as a prerequisite for
creating configurable task lists?
a) Class type 100 b) Class type 001 c) Class type 300 d) Class type 500
63. Which type of lists allows you to use a filter to activate or deactivate
different objects like notifications, orders and measuring points?
64. Which type of lists allows you to select entries based on header data and
operation data?
67. Which of the following info structure contains characteristics order type,
Maintenance activity types, Functional location Equipment and Month?
68. Identify the object for which you cannot link a work center?
a) With a cost center b) With company code c) With qualifications d) With positions
69. Which strategy do you follow if you want to analyze what effects the usage
conditions have on the likelihood of damage to the installed equipment?
70. Which data is useful to monitor a piece of equipment dynamically that is track
changes to the equipment over a specific period of time?
71. What are the prerequisites that must be fulfilled for a piece of equipment to
be installed at a functional location?
72. Where can you find documentation related to the work performed for a
notification?
73. After the maintenance order obtained the status TECO after the maintenance work
required for the order has been completed. The maintenance order can he changed
online as follows:
Note: More than one correction option
a) The deletion flag cannot be set b) It can be locked or unlocked c) You can still
change the settlement rule d) You cannot change the settlement rule
74. How does maintenance bill of material differs from other BOMs and identify the
functions that is related to maintenance bill of materials?
75. Which type of maintenance the creation and release of the maintenance order in
one work step after a malfunction has been reported for example by an employee in
production?
76. Which of the following instruments available for processing maintenance tasks
are used to convey maintenance requirements and the documentation for technical
findings and activities performed?
77. When a maintenance plan is created with reference to a contract item, the
system automatically copies certain data into the maintenance plan. The start date
is proposed from which of the following?
a) General task list b) Object task list c) Contract header d) Contract item
78. What do you call a combination of code groups grouped together by their content
for example damages, causes of damages?
79. What are the two different views that plant maintenance order offers with
regards to the work environment for the planner?
a) The expert view b) Internal processing view c) Customizing view d) The simple
order view
80. Which element of the maintenance order contains span parts, which are required
and used when the maintenance order is executed?
2. a
3. c
4. c & d
5. b & d
6. b
7. a & c
8. b
9. a
10. a, b, c & d
11. c
12. b, c & d
13. a & b
14. c
15. d
16. b
17. a
18. b
19. c
20. d
21. d
22. b & d
23. a, c & d
24. a
25. c
26. a & c
27. c
28. a & c
29. c
30. c
31. d
32. d
33. a
34. b
35. c
36. d
37. c
38. a
39. a & d
40. c
41. d
42. c
43. b
44. c
45. a
46. a
47. a
48. a
49. a & c
50. d
51. d
52. a & d
53. c
54. b
55. b
56. a & c
57. b
58. c
59. c
60. b
61. a & b
62. c
63. c
64. b & c
65. a
66. a, b & c
67. d
68. b
69. c
70. d
71. a & c
72. a
73. b & c
74. a, c & d
75. b
76. d
77. d
78. a
79. a & c
80. d