Ref: item no
Prime Structures
Item Description Location On-site Progress from RTO
(comments/target date) Report
Gaps
10 "We will seal with sealant 2/7/2019." ref: no 6
between Aluminium Fins
Gaps
between Aluminium Box up and glass "Water proofing membrane done, termination
11 ref: no 21
railing to make good, to sealed off, no panel expected to complete by 04/07/19."
water ingress in the future.
Ref: item no
Prime Structures
Item Description Location On-site Progress from RTO
(comments/target date) Report
Level 4, Level 4 sky level "We had engage New Art to seal the gap between
Gaps ref: no 42/45
13 glass and sofit and expect to complete by
on ceiling and glass wall terrace 46/49
07/07/19."
Gaps
on glass railing and concrete, "Materials on site, start install by 22/6/2019 expect
16 ref: no 53
on glass facade and aluminium cladding to complete by 02/07/19."
box up
Broken Glass
18 Level 6 "Ordered, ETA mid July 2019." ref: no 9
to replace
Ref: item no
Prime Structures
Item Description Location On-site Progress from RTO
(comments/target date) Report
End Capping
28 Level 7 "Done." ref: no 37/39
to complete capping on cladding
Access Panel "The Inspection Hatch cover panel was push up and
30 to complete Level 4 left it inside ceiling. Hatch panel to stiffen with angle ref: no 44
before fix it back 01/07/2019."
Doors Installation
31 to complete Level 4, Terrace Door Installed. ref: no 47
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
2 1 AD no. 48 to 61 - C&S AD no. 48 to 61 - C&S 48-61 C&S all completed C&S all completed
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
9 1 Ironmongery - door lock IRONMONGERY - M&E Riser besides Driveway 115 8/30/2019 inspection completed:
Door Lock damaged 30/08/2019
inspection completed:
13 1 Level 1 Apron Slab Tiles Tile defect at Apron Slab need to be replaced. 115 9/23/2019 23/09/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
17 1 Kung Chong Road - drainage gaps Big Gaps on drainage Grating at Kung Chong 115 9/18/2019 inspection completed :
Road 18/09/2019
inspection completed:
18 1 Level 1 - building perimeter drainage At Building perimeter drainage not properly 115 8/26/2019 26/08/2019
cleaned must have proper flow Furhter Comment: main
driveway need to clean
19 1 Draw Pit Cover - In front of DRAW PIT COVER RUSTY AT DRIVEWAY NEAR 115 9/10/2019 inspection completed:
Substation ELECTRICAL SUBSTATION. 10/09/2019
21 L1 - Driveway Tiles Oil stains on driveway tiles, need make good 115 preparing for inspection
22 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 9/23/2019 inspection completed:
23/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
23 1 L1 - Driveway Tiles CRACKED ON BLACK COLOR DRIVEWAY TILES 115 9/23/2019 inspection completed:
23/09/2019
25 1 Plaster cracks near hand rail base PLASTER CRACKS NEAR HAND RAIL BASE 115 9/10/2019 inspection completed:
NEAR SECURITY ROOM 10/09/2019
26 1 Level 1, Fire Fighiting Lobby 2 AT 1ST Floor Level FireFighting Lobby 2 Tile on 115 9/23/2019 inspection completed:
Wall need to make good 23/09/2019
27 1 Basement CRACKS ON PLASTERED WALL, WALL PAINT 115 8/30/2019 inspection completed:
TO MAKE GOOD 30/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
At 3rd floor fire fighting lobby 1, Fire Exit door inspection completed:
30 1 Level 3, Fire Fighting Lobby 1 jamb need to rectify. 115 10/9/2019 09/10/2019
31 1 Level 4, Fire Fighting Lobby 1 At 4th floor fire fighting lobby 1, Fire Exit door 115 10/9/2019 inspection completed:
jamb need to rectify. 09/10/2019
32 1 Level 5, Fire Fighting Lobby 1 At 5th floor fire fighting lobby 1, Fire Exit door 115 10/9/2019 inspection completed:
jamb need to rectify. 09/10/2019
33 1 Level 6, Fire Fighting Lobby 1 At 6th floor fire fighting lobby 1, Fire Exit door 115 10/9/2019 inspection completed:
jamb need to rectify. 09/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
34 1 Level 7, Fire Fighting Lobby 1 At 7th floor fire fighting lobby 1, Fire Exit door 115 10/9/2019 inspection completed:
jamb need to rectify. 09/10/2019
35 1 Level 4 - Lobby 1 door AT 4TH FLOOR FIRE EXIT DOOR LESS THAN 1 115 7/25/2019 inspection completed :
METER ALLOWABLE CLEARANCE 25/07/2019
inspection completed :
1 pc of Damaged decking at 4th floor sky 13/08/2019
39 1 Level 4 - landscape area terrace, Decking not properly cleaned all the 115 8/13/2019 Further comment: to
way.
clean decks and the whole
walkway.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
42 1 Level 4 - Prime Structure Works Gap on glass wall and precast wall need to 115 7/25/2019 inspection completed :
make good 25/07/2019
43 1 Level 2 & 3 - silver tapes Aluminium Tape on Façade wall to make good 115 8/30/2019 inspection completed:
30/08/2019
inspection completed:
30/08/2019
44 1 Broken Glass at Level 1 (Hoy Fatt Broken façade glass on 1st floor high level 115 8/30/2019 further comment:
Road) need to be replaced (Hoy Fatt Road) Installed glass deviates
from previously approved
color of Façade.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
inspection completed:
30/08/2019
45 1 Broken Glass at Level 1 (Kung Chong Broken façade glass on 1st floor high level 115 8/30/2019 further comment:
Road) need to be replaced (Kung Chong Road) Installed glass deviates
from previously approved
color of Façade.
46 1 Level 6, Fire Fighting Lobby 1 At 6th Floor Level painting at walls, ceiling 115 10/2/2019 inspection completd:
works to make good 02/10/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
50 1 Level 5, Fire Fighting Lobby 2 At 5th floor level, fire fighting lobby 2, door 115 10/16/2019 inspection completed:
hinges paint stains to make good 16/10/2019
51 1 Level 5, Fire Fighting Lobby 2 At 5th floor level fire fighting lobby 2, door 115 10/16/2019 inspection completed:
jamb to make good 16/10/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
54 1 Level 7 - Water Tank Room At 7th floor roof rusty color on pump room 115 10/21/2019 inspection completed:
gates/pump need to paint blue. 21/10/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
58 Level 1 - Ceiling At 1st floor high ceiling need to make good 115
60 1 Roof Foundation Plinths - plaster At roof level, plaster on foundation plinths 115 10/2/2019 inspection completed:
spalling spalling 02/10/2019
62 1 Façade Glasses at All floors Façade glass needs thorough cleaning, 115 10/12/2019 inspection completed:
markings on frames need to clean on all floors 12/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
Lift Motor Room - cement plaster At external wall of lift motor room, visible inspection completed:
64 1 cement plaster cracks facing west direction 115 10/2/2019
cracks 02/10/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
73 1 Level 4,5,6 - PVC pipes installation At Level 4,5,6 Elect PVC pipes installed higher 115 8/5/2019 inspection completed:
than required slab level 05/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
77 1 Architectural Fins at all floors Painting of Architectural Fin Supports should 116 8/30/2019 inspection completed:
match adjacent color of Arch. Fins 30/08/2019
78 1 Architectural Fins at all floors Painting of Architectural fin supports to match 116 8/30/2019 inspection completed:
adjacent material colour 30/08/2019
80 1 Level 6 - Prime Structures Glass At 6th floor level, broken glass need to be 116 9/3/2019 inspection completed:
replaced at near gate 2 at Kung Chong Road 03/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
replaced location near gate 2 at Kung Chong further comment:
81 1 Level 1 - Prime Strcutres Glass Road ` 116 8/30/2019 Installed glass deviates
from previously approved
color of Façade.
inspection completed:
Broken glass to be replaced at 1st floor high 30/08/2019
82 1 Level 1 - Prime Strcutres Glass level near gate 1 Hoy Fatt Road 116 8/30/2019 further comment:
Installed glass deviates
from previously approved
color of Façade.
1st insp:
Aluminium cladding interface with vertical 25/07/2019 inspection completed:
83 1 Vertical Fins fins at external metal staircase to complete 116 2nd insp: 01/08/2019
01/08/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
Level 2 - cleaning of brown colored Cleaning of brown colored spots on inspection completed:
89 1 Aluminium cladding at Architectural Fins and 116 9/3/2019
spots at base of Fins at 2nd floor level 03/09/2016
Level 2 - cleaning of brown colored Cleaning of brown colored spots on inspection completed:
90 1 Aluminium cladding at Architectural Fins and 116 9/3/2019
spots 03/09/2016
at base of Fins at 2nd floor level
Level 2 - cleaning of brown colored Cleaning of brown colored spots on inspection completed:
91 1 Aluminium cladding at Architectural Fins and 116 9/3/2019
spots at base of Fins at 2nd floor level 03/09/2016
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
104 1 Gaps at 7th floor Sealant on gaps need to complete at 7th floor 116 9/17/2019 inspection completed:
17/09/2019
105 1 End capping at 7th floor, roof End capping on cladding at 7th floor roof 116 9/17/2019 inspection completed:
need to complete 17/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
107 1 Gap at Level 4 Gap on glass wall and concrete precast wall 116 7/25/2019 inspection completed :
need to complete 25/07/2019
Gap on ceiling and glass wall at 4th floor level inspection completed :
108 1 Gap at Level 4 sky terrace need to complete 116 7/25/2019 25/07/2019
109 1 Gap to have sealant Gap needs to have sealant 116 9/17/2019 inspection completed:
17/09/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
114 1 Level 4 - gap at sky terrace Gap on ceiling and door need to be completed 116 inspection completed:
02/10/2019
117 1 Level 4 - gap Gap on floor and aluminium cladding need to 116 7/25/2019 inspection completed :
make good 25/07/2019
Prime Structures Platforms - Kung Platform paint color not matched adjacent 1st inspection on 80% painting done. To
118 1 matte grey colour, 2nd floor level to 7th floor 116
Chong Road roof level 06/08/2019 remove other paint color
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
Skim-coating to the underside of Skim coating to the underside of slabs to be inspection completed :
121 1 slabs completed. 117 7/25/2019 25/07/2019
122 1 Floor uneveness Floor unevenness to be rectified. 117 7/25/2019 inspection completed :
25/07/2019
124 1 Installation of SOB boxes Installation of SOB boxes as per the M&E 117 7/25/2019 inspection completed :
consultant's approval. 25/07/2019
125 1 Level 7 - missing screed Level 7 missing screed for ZDC to check their 117 10/12/2019 inspection completed.
BQ to find out if they are to screed that area. 12/10/2019
Open channel on the floor for the SOB boxes inspection completed :
126 1 Open Channel on the floor to be concreted back. 117 7/25/2019
25/07/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
128 1 Baement - Water Seepage Some earth pits waterlogged at basement 118 8/1/2019 inspection completed
01/08/2019.
129 1 M&E Permanent power supply for ZDC basement 119 Under M&E Under M&E inspections
hacking work inspections
130 1 AD the same as AD no.62 AD the same as AD no.62 120 completed completed
Toilet
131 1 Level 7 - Male Toilet Urinal too narrow from edge of urinal to 121 9/20/2019 inspection completed:
cubicle partition wall. Unacceptable. 20/09/2019
133 1 Level 7 - Water Seepage Water Ingress on void in front of door. 122 10/12/2019 inspection completed:
12/10/2019
134 1 Level 7 - Unfinished floor outside the Unfinished floor outside the door. 122 10/12/2019 inspection completed:
door 12/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
135 1 FMAP windows Many FMAP windows are open. 122 7/25/2019 inspection completed
25/07/2019.
136 1 M&E defects and works M&E defects and works 123 Under M&E Under M&E inspections
inspections
137 1 M&E fix alignment To ensure proper and centered alignment of 124 Under M&E Under M&E inspections
the M&E final fix at all the ceiling area. inspections
M&E
141 1 M&E coordinator to engage for the M&E site 128 Under M&E Under M&E inspections
issues. inspections
Open channel on the floor for the SOB boxes inspection completed :
143 1 Open Channel on the floor to be concreted back. 129 7/25/2019 25/07/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
146 1 Pest control - L4 landscape Pest control at level 4. 129 9/23/2019 inspection completed:
23/09/2019
147 1 Levelness of floor Levelness of floor to all level. 129 7/25/2019 inspection completed :
25/07/2019
149 1 Rainwater ingress - staircase 2 exit Rainwater Ingress 130 7/25/2019 inspection completed :
doors @level 2-7 rainwater entering from exit doors 25/07/2019
Door
150 1 Door Jamb - Staircase 2 Exit doors ` visible brown spots and rusty color @staricase 130 10/16/2019 inspection completed:
2 exit door jambs 16/10/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
FMAP Windows
151 1 FMAP windows always open. Even rainy days. 130 7/25/2019 inspection completed :
25/07/2019
Water Clog
Clogged drainage at level 7 due to scattered inspection completed :
152 1 Water Clog at Level 7 cement paper bags, plastics and cigarrette 130 8/1/2019 01/08/2019
butts.
Water Seepage
at basement slab from CRACK on slab inspection completed :
153 1 Basement Water Seepage @ earthpit 1, @ earthpit near firehosereel, @ 130 8/1/2019
near Lift wall 01/08/2019
155 1 Basement Water Seepage Grid E-3 Near Fire Fighting lobby 1 door crack 132 8/1/2019 inspection completed :
on slab 01/08/2019
156 1 Basement Water Seepage Grid E-4 Outside firelift wall corner crack on 132 8/1/2019 inspection completed :
slab 01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
157 1 Basement Water Seepage Grid F-3 Earthpit near hosereel 132 8/1/2019 inspection completed :
01/08/2019
inspection completed :
158 1 Basement Water Seepage Grid F-2 Ramp location of I-Beam Support 132 8/1/2019 01/08/2019
inspection completed :
159 1 Basement Water Seepage Grid F-1 Earth Pit 132 8/1/2019 01/08/2019
160 1 Basement Water Seepage Grid G-0 location of I-Beam Support 132 8/1/2019 inspection completed :
01/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
161 1 Basement Water Seepage Grid E-1 Earthpit 132 8/1/2019 inspection completed :
01/08/2019
162 1 Basement Water Seepage Grid D-1 Earthpit 132 8/1/2019 inspection completed :
01/08/2019
163 1 Basement Water Seepage Grid B-1 Location of previous I-Beam Support 132 8/1/2019 inspection completed :
01/08/2019
inspection completed :
164 1 Basement Water Seepage Grid A-0 Crack on Slab 132 8/1/2019 01/08/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
inspection completed :
Landscaping 13/08/2019
168 1 Damaged deck/ Uncleaned Walkway Damaged deck. (no x 1pc) 133 8/13/2019 Further comment: to
at Landscaping area Unclean deck. clean decks and the whole
walkway.
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
FMAP Windows
175 1 FMAP windows always open. Even rainy days. 134 7/25/2019 inspection completed :
25/07/2019
176 1 Level 1 - handicapped toilet Door handle missing at level 1 - handicapped 134 inspection completed:
toilet 02/10/2019
177 1 Fire-stop at level 3 Firestop damaged at fire hose reel 134 9/24/2019 inspection completed :
compartment 24/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
179 1 Drainage Orifice Discharge drain rectified orifice not done yet 135 7/10/2019 completed. (email dated:
10/07/2019)
181 1 Security Room - door/ floor / Celing Door Jamb at security door not installed 135 inspection completed:
properly floor and ceiling not done 19/08/2019
182 1 Architectural Fins at all floors Painting of Architectural Fin Supports should 135 8/30/2019 inspection completed:
match adjacent color of Arch. Fins 30/08/2019
183 Ceiling at Level 4 - landscaping area At 4th floor level, ceiling to make good 135
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
inspection completed:
At 1st floor high level broken glass need to be 30/08/2019
184 1 Broken Glass at Level 1 - Kung Chong replaced location near gate 2 at Kung Chong 135 8/30/2019 further comment:
Road Road Installed glass deviates
from previously approved
color of Façade.
inspection completed:
Broken glass to be replaced at 1st floor high 30/08/2019
185 1 Broken Glass at Level 1 - Hoy Fatt level near gate 1 Hoy Fatt Road 135 8/30/2019 further comment:
Road Installed glass deviates
from previously approved
color of Façade.
Broken Glass at Level 2 - Hoy Fatt Broken glass to be replaced at 2nd floor level
186 Road near gate 1 Hoy Fatt Road 135
187 Aluminium Box-up alignment Aluminium box up alignment 1pc sticking out 135
from the rest
188 1 Meter Room Level 1 - door / signage Respective finishing / signage/ at meter room 135 10/16/2019 inspection completed:
door not yet completed 16/10/2019
189 1 Gas Riser Room Level 1 - door / Respective finishing / signage/ at gas riser 135 8/1/2019 inspection completed :
signage / finishing door not yet completed 01/08/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
194 1 Gaps on Aluminium fins at Staircase Gaps on Aluminium fins to make good/cover 135 8/22/2019 inspection completed:
2 22/08/2019
195 1 Architectural Fins at all floors Painting of Architectural fins supports to 135 8/22/2019 inspection completed:
match adjacent material color 22/08/2019
196 1 Broken Glass at Level 6 - Kung Chong At 6th floor level broken glass need to be 135 9/3/2019 inspection completed:
Road replaced near Gate 2 @ Kung Chong Road 03/09/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
1st insp:
198 1 Vertical Fins - near staircase 2 Aluminium cladding interface with vertical 135 25/08/2019 inspection completed :
(outside of building) fins at external metal staircase to complete 2nd insp: 01/08/2019
01/08/2019
201 1 LED lights in the toilets LED on toilet mirror not yet installed 135 inspection completed:
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
204 Water Tap Handle Missing Water tap missing handle at green buffer 135
207 1 Fire Damper to be installed on duct Fire-damper to be installed on duct 137 Under M&E Under M&E inspections
penetration through fire-rated wall penetration through fire rated wall inspections
inspection completed :
209 1 Basement Moisture reading at basement 138 8/6/2019 06/08/2019
211 1 Basement Marking of driveway and car parking lots 138 8/16/2019 inspection completed :
16/08/2019
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
214 1 Level 1 - lift lobby wall Level 1 lift lobby 2- to remove marble wall 138 8/13/2019 inspection completed :
cladding to expose lift door jamb 13/08/2019
215 1 Lift lobby 2 Lights not install as per approved drawing. 138 inspection completed:
(lights to be fitted inside the cove) 02/10/2019
216 1 Lift lobby 2 Timber threshold to be removed and to 138 8/23/2019 inspection completed :
perform water test on the alum edge. 23/08/2019
inspection completed:
30/08/2019
218 1 Level 1 Level 1 - external façade, cracked on curtain 138 8/30/2019 further comment:
wall glass. Installed glass deviates
from previously approved
color of Façade.
Ceiling at Basement
219 1 Ceiling at Basement Ceiling is inconsistent with 3rd floor Ceiling 139 9/18/2019 inspection completed:
Construction, Recessed Ceiling not 18/09/2019
constructed
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
228 1 Column Angle Guards at Basement Column Guard not installed yet, materials for 139 8/20/2019 inspection completed:
approval not submitted 20/08/2019
EPS systems at Rump going up and EPS not installed yet at RUMP GOING UP TO Under M&E
229 1 1ST FLOOR AND AT RUMP GOING DOWN TO 139 Under M&E inspections
going down BASEMENT FLOOR inspections
230 Cat Ladder at Upper Roof Cat Ladder not installed yet, Location at upper 139
roof near Car Lift Motor Room
232 Gondola Supports at Upper Roof Actual Gondola support constructed not the 139
same as drawing
233 Platforms at Kung Chong Road Platform not same as drawing 139
234 Gondola Supports at Upper Roof Actual Gondola platform constructed not the 139
same as drawing
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
238 1 Plaseter Cracks at Basement Wall Plaster cracks on wall of ramp going down to 139 inspection completed:
basement 03/10/2019
239 1 2.2m Clear Height in Basement Non-compliance to minimum 2.2m clear 140 Under M&E Under M&E inspections
height in basement car park area inspections
240 1 Basement Basement moisture reading test to conduct 141 8/6/2019 inspection completed:
06/08/2019
241 1 Status of sty 4 soil replacement ZDC to resolve the infestation 141 9/23/2019 inspection completed:
23/09/2019
244 1 Operation of EPS barrier system To update the technicals of EPS barrier system 141 Under M&E Under M&E inspections
inspections
245 1 Basement Basement 2.2m clear basement height check 141 Under M&E Under M&E inspections
inspections
246 1 Lift Lobby Lift Lobby ceiling and wall tiling at lift door 141 9/18/2019 inspection completed:
18/09/2019
247 1 M&E fix alignment Metal M&E final fix at the fireman lift lobby 141 9/18/2019 inspection completed:
18/09/2019
248 1 To follow up on all observation All observation reports and ADs to follow up 141
reports and ADs issued
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
250 All outstanding works to complete all outstanding works to complete 141
254 1 Bin Centre at Level 1 At bin centre, ZDC subcon store their 143/144 9/24/2019 inspection completed :
materials inside the Bin Centre 24/09/2019
258 Exit Sign at Level 7 - outside of Lobby At 7th floor roof, Green coloured exit sign 143/144 preparing for inspection
2 turned into Blue color.
Prepared By: Alfredo Claro -Archi. RTO
ZDC: Khin Khin Han Archi. Coordinator UPDATED ZDC ARCHITECTURAL OUTSTANDING WORKS AS AT 22 October 2019 244÷ 285 = 85.610% Accomplished
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
260 Level 3 - Washing Bay At 3rd floor, washing bay rectification not 143/144
done yet.
264 1 RC Kerb at drive way area chipped off corners of RC wll. RC kerb to 143/144 8/30/2019 inspection completed:
make good. 30/08/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
Level 2 Floor Slab - visible survey At 2nd floor level, slab surface to make good,
268 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.
Level 1 Floor Slab - visible survey At 1st floor level, slab surface to make good,
269 markings, depressed areas, all visible survey marking, all depressed areas, 143/144 preparing for inspection
protruding bars, all to make good. protruding bars, floor surface to make good.
271 1 Doors at Lobby 1 and Lobby 2 - all Defects on all doors at fire fighting lobby 1 143/144 10/9/2019 inspection completed:
floors and at fire fighting lobby 2 not rectified yet 09/10/2019
Lobby 1 and Lobby 2 - fire break Gaps to make good to all fire break glass inspection completed:
272 1 glass panel and lift panels to make panel and lift panels at fire fighting lobby 1 143/144 10/16/2019
good. and at fire fighting lobby 2. 16/10/2019
273 1 Level 1 to 7 - gaps at door At level 7 to basement level, gaps on fire 143/144 10/16/2019 inspection completed:
doors needs to be rectified. 16/10/2019
S/N Zhengda Before Photos Description After Rectification Photo - comments Ref AD Inspection Date Status Mr. Alfredo Mr. David
No. (acknowledgement) (acknowledgement)
Lobby 1 - lift doors, plastic At fire fighting lobby 1, door of lifts, plastic inspection completed:
275 1 protection, door frames to be protection, door frames to be cleared of paint 143/144 8/30/2019
cleared of paint stains at all floors stains, from level 7 to basement level. 30/08/2019
Fire Doors - paint stains, silicone Fire door, paint stains, silicone stains, ZDC to inspection completed :
277 1 stains ZDC to make good make good. 143/144 9/24/2019 24/09/2019
278 Level 4 - landscape area Installation of lights and LED lights at 145
landscape area
282 1 M&E defects, works and T&C M&E 147 Under M&E Under M&E inspections
inspections
283 Land Scape at Green buffer Poor landscaping at green buffer 148