Kiln shutdown
Report
September-2019
Wadi El Nile Cement Company,
Egypt
Table of Contents
.................................................................................................................................. 1
Crusher Inspection Findings ....................................................................... 3
Raw Mill Area.............................................................................................. 4
2.1 321.SR150 ................................................................................................ 4
2.2 321.RM100 ................................................................................................ 5
2.3 311.WF150 ................................................................................................ 5
2.4 Main EP 331.EP300 ..................................................................................... 6
2.5 ID Fan 331.FN110 ...................................................................................... 6
2.6 Bucket Elevator 341.BE050.......................................................................... 7
Kiln Area ..................................................................................................... 8
3.1 Bucket Elevator 351.BE340.......................................................................... 8
3.2 Rotary Kiln 431.KL100 ................................................................................ 8
Cooler Area (441.CC100) ............................................................................ 9
4.1 Static Grate ............................................................................................... 9
4.2 Chamber ..................................................................................................10
4.3 451.EP200 ................................................................................................11
Coal Mill Area............................................................................................ 12
5.1 461.SR150 ...............................................................................................12
5.2 461.RM100 ...............................................................................................14
Page 2 of 14
Wadi El Nile Cement Company, Egypt
Page 3 of 14
Wadi El Nile Cement Company, Egypt
Page 4 of 14
Wadi El Nile Cement Company, Egypt
2.2 321.RM100
Cracked clamp in roller 1,2 and 3 have been changed
2.3 311.WF150
40 lamellas have been changed
Page 5 of 14
Wadi El Nile Cement Company, Egypt
Page 6 of 14
Wadi El Nile Cement Company, Egypt
Page 7 of 14
Wadi El Nile Cement Company, Egypt
Kiln Area
3.1 Bucket Elevator 351.BE340
Drive drum lagging has been changed
Oil seals for H.S.S have been changed for drive A and drive B
Page 8 of 14
Wadi El Nile Cement Company, Egypt
Page 9 of 14
Wadi El Nile Cement Company, Egypt
4.2 Chamber
worn-out crossbars have been changed
Reclaimer Side
CCR Side
Page 10 of 14
Wadi El Nile Cement Company, Egypt
4.3 451.EP200
The two worn-out collecting plates have been repaired
There are two worn-out hammers at the inlet chamber and at chamber 4
Page 11 of 14
Wadi El Nile Cement Company, Egypt
Page 12 of 14
Wadi El Nile Cement Company, Egypt
Page 13 of 14
Wadi El Nile Cement Company, Egypt
5.2 461.RM100
Worn-out wear tube for roller #3 piston has been changed
Worn-out air seal for roller #3 (dam ring side) has been changed
Page 14 of 14