Sunteți pe pagina 1din 11

1

Konica-Minolta bizhub 250 Trouble Error Codes List page 1 (from 4)

Code Description Remedy


LCT Communication Failure
- Due to a software malfunction, etc.,
C0001
the time on the watchdog timer has
run out and a reset is performed.
1 Check the motor and sensor
connectors for proper connection, and
correct as necessary. 2 Check the
connector of each motor for proper drive
coupling, and correct as necessary. 3
Tray 1 Elevator Failure
Check the PU1 connector for proper
- The Lift-Up Sensor is not unblocked
connection and correct as necessary. 4
C0202 even after the set period of time has
PC6 I/O check. 5 PC12 I/O check. 6
elapsed after the paper lift up
PC114-PF I/O check. 7 PC123-PF I/O
operation for the drawer has begun.
check. 8 M7 operation check. 9 M8
operation check. 10 M124-PF operation
check. 11 M125-PF operation check. 12
Change PWB-A. 13 Change PWB-C2.
14 Change PU1.
1 Check the motor and sensor
connectors for proper connection, and
correct as necessary. 2 Check the
connector of each motor for proper drive
coupling, and correct as necessary. 3
Tray 2 Elevator Failure
Check the PU1 connector for proper
- The Lift-Up Sensor is not unblocked
connection and correct as necessary. 4
C0204 even after the set period of time has
PC6 I/O check. 5 PC12 I/O check. 6
elapsed after the paper lift up
PC114-PF I/O check. 7 PC123-PF I/O
operation for the drawer has begun.
check. 8 M7 operation check. 9 M8
operation check. 10 M124-PF operation
check. 11 M125-PF operation check. 12
Change PWB-A. 13 Change PWB-C2.
14 Change PU1.
1 Check the motor and sensor
connectors for proper connection, and
Tray 3 Elevator Failure correct as necessary. 2 Check the
- The Lift-Up Sensor is not unblocked connector of each motor for proper drive
C0206 even after the set period of time has coupling, and correct as necessary. 3
elapsed after the paper lift up Check the PU1 connector for proper
operation for the drawer has begun. connection and correct as necessary. 4
PC6 I/O check. 5 PC12 I/O check. 6
PC114-PF I/O check. 7 PC123-PF I/O
2

check. 8 M7 operation check. 9 M8


operation check. 10 M124-PF operation
check. 11 M125-PF operation check. 12
Change PWB-A. 13 Change PWB-C2.
14 Change PU1.
1 Check the motor and sensor
connectors for proper connection, and
correct as necessary. 2 Check the
connector of each motor for proper drive
coupling, and correct as necessary. 3
Tray 4 Elevator Failure
Check the PU1 connector for proper
- The Lift-Up Sensor is not unblocked
connection and correct as necessary. 4
C0208 even after the set period of time has
PC6 I/O check. 5 PC12 I/O check. 6
elapsed after the paper lift up
PC114-PF I/O check. 7 PC123-PF I/O
operation for the drawer has begun.
check. 8 M7 operation check. 9 M8
operation check. 10 M124-PF operation
check. 11 M125-PF operation check. 12
Change PWB-A. 13 Change PWB-C2.
14 Change PU1.
LCT Elevator Motor Failure
- The Elevator Motor Pulse Sensor
(PC10-LCT) cannot detect both edges
C0209 of H/L even after the set period of time
has elapsed while the Elevator Motor
(M5-LCT) is turning backward/forward
(raise/lower).
Bypass Lifting Motion Failure
- The Bypass Lift Sensor (PC29) is not 1 Check the SL3 connector for proper
blocked or unblocked even after the connection and correct as necessary. 2
C0211 set period of time has elapsed after Check cam position.. 3 PC29 I/O check
the Bypass Pick-Up Solenoid (SL3) is PWB-A. 4 SL3 operation check. 5
energized after the manual feed paper Change PWB-A.
take-up operation has begun.
LCT Ejection Failure
C0212
- See PC-407 sevice manual
LCT Shift Gate Malfunction
C0213
- See PC-407 sevice manual
LCT Shifting Failure
C0214
- See PC-407 sevice manual
LCT Shift Motor Malfunction
C0215
- See PC-407 sevice manual
C0701 Manual Paper Size Detection 1 Check the VR1 connector for proper
3

Adjustment Failure connection and correct as necessary. 2


- The control value of the Manual Readjust the VR1. 3 Replace VR1. 4
Paper Size Detection Unit does not Change PWB-A.
fall within the specified range when an
adjustment is made of manual paper
size detection.
1 Turn OFF the Main Power Switch, wait
Exit Option Communication Failure for 10 sec. or more, and turn ON the
- The connection status of a finishing Main Power Switch. 2 Check the PWB-A
C1080
option is changed after the copier has FN and the PWB-A for proper
been turned on. connection, and correct as necessary. 3
Change PWB-A FN. 4 Change PWB-A.
Elevator Motor Ascent/Descent Drive
Failure
C1183
- See FS-530/ PU-501/ OT-602
service manual.
Aligning Plate 1 Drive Failure
C1190 - See FS-530/ PU-501/ OT-602
service manual.

Code Description Remedy


Aligning Plate 2 Drive Failure
C1191 - See FS-530/ PU-501/ OT-
602 service manual.
C11A0 Paper-Lifter Drive Failure
Exit Roller
Pressure/Retraction Failure
C11A1
- See FS-530/ PU-501/ OT-
602 service manual.
Saddle Exit Roller Pressure/
C11A2 Retraction Failure
-See SD-507 service manual.
Shutter Drive Failure
C11A3 - See FS-530/PU-501/OT-602
service manual.
Saddle Exit Motor Failure
C11A4
- See SD-507 service manual.
Saddle In & Out Guide Motor
C11A5 Failure
- - See SD-507 service
4

manual.
Saddle Layable Guide Motor
C11A6 Drive Failure
- See SD-507 service manual.
Staple Unit CD Drive Failure
C11B0 - See FS-530/PU-501/OT-602
service manual.
Staple Drive Failure
C11B2 - See FS-530/PU-501/OT-602
service manual.
Saddle Staple 1 Drive Failure
C11B5
- See SD-507 service manual.
Saddle Staple 2 Drive Failure
C11B6
- See SD-507 service manual.
Punch Cam Motor Unit Failure
C11C0 - See FS-530/PU-501/OT-602
service manual.
Crease Motor Drive Failure
C11D0
- See SD-507 service manual.
IU Motor Failure
- The IU Motor Lock signal 1 Check the M2 connector for proper connection
remains set to H for a set and correct as necessary. 2 Check the M2 for
period of time while the IU proper drive coupling, and correct as necessary.
C2211 Motor is turning. 3 Check the PWB-A connector for proper
- The IU Motor Lock signal connection and correct as necessary. 4 M2
remains set to L for a set operation check PWB-A PJ28A-11 (REM) M-4 5
period of time while the IU Change PWB-A. 6 Change PU1.
Motor remains stopped.

Code Description Remedy


Toner Suction Fan Motor Failure
- The Toner Suction Fan Motor 1 Check the M11 connector for proper
Lock signal remains set to H for a connection and correct as necessary. 2
set period of time while the Toner Check the fan for possible overload, and
Suction Fan Motor is turning. correct as necessary. 3 Check the PWB-A
C2351
- The Toner Suction Fan Motor connector for proper connection and correct
Lock signal remains set to L for a as necessary. 4 M11 operation check PWB-
set period of time while the Toner A PJ5A-13 (REM) D-14 5 Change PWB-A. 6
Suction Fan Motor remains Change PU1.
stopped.
5

1 Check the UN2 connector for proper


IU Fuse Blowing Failure
connection and correct as necessary. 2
- The fuse is not blown even after
C2431 Remove the Developing Unit from the IU,
the lapse of a predetermined
and then replace UN2. 3 Run F8. 4 Change
period of time.
PWB-A. 5 Change PU1N.
ATDC Sensor Failure
- The scanning value of the ATDC 1 Check the UN2 connector for proper
Sensor is less than 7 % while the connection and correct as necessary. 2
C2557 IU Motor is turning. Remove the Developing Unit from the IU,
- The scanning value of the ATDC and then replace UN2. 3 Run F8. 4 Change
Sensor is more than 19 % while PWB-A. 5 Change PU1N.
the IU Motor is turning.
ATDC Adjustment Failure
- The adjustment of the ATDC
1 Check the UN2 connector for proper
control voltage could not be
connection and correct as necessary. 2
completed in the set period of
C255C Remove the Developing Unit from the IU,
time when function F8 is run.
and then replace UN2. 3 Run F8. 4 Change
- The ATDC control voltage was
PWB-A. 5 Change PU1N.
not within the range of 5.39 V to
8.15 V when function F8 is run.
1 Disconnect and then connect the power
cord. Turn OFF the Main Power Switch, wait
EEPROM Failure for 10 sec. or more, and turn ON the Main
C2654 - An EEPROM where no initial Power Switch. 2 Check the EEPROM on the
data is written is detected Mechanical Control Board for proper
connection, and correct as necessary. 3
Change PWB-A. 4 Change EEPROM.
Abnormal Image Transfer Voltage
- The image transfer voltage
1 Check the installation of the Transfer
C2702 exceeds 100 V for the set period
Roller. 2 Change HV1
of time while the IU Motor remains
stopped.
Fusing Warm-Up Failure (Main) 1 Check that the H1 comes on when the
- The Fusing Roller Thermistor Main Power Switch is set to ON, and correct
does not detect the required or replace as necessary. 2 Check that the
temperature within 30 sec. after a H2 comes on when the Main Power Switch
warmup cycle has begun; is set to ON, and correct or replace as
therefore, the copier does not necessary. 3 Check the installation of the
C3451
complete the warm-up cycle. TH1 and the TH2, and correct or clean as
- The temperature of the Fusing necessary. 4 Check the operation of the
Rollers does not reach the TH1. Remove CN80 (4P), and then check
required level even after the set that the resistance across CN80-2 and -3 on
period of time has elapsed during the Thermistor is infinity. 5 Check the
a warm-up cycle. operation of the TH2. Remove CN81 (4P),
6

and then check that the resistance across


CN81-2 and -3 on the Thermistor is infinity.
6 Check the continuity of the H1. Correct or
replace as necessary. 7 Check the
continuity of the H2. Correct or replace as
necessary. 8 Change PU1. 9 Change PWB-
A.
1 Check that the H1 comes on when the
Main Power Switch is set to ON, and correct
or replace as necessary. 2 Check that the
H2 comes on when the Main Power Switch
Fusing Warm-Up Failure (Sub)
is set to ON, and correct or replace as
- The Fusing Roller Sub
necessary. 3 Check the installation of the
Thermistor does not detect the
TH1 and the TH2, and correct or clean as
required temperature within 30
necessary. 4 Check the operation of the
sec. after a warm-up cycle has
TH1. Remove CN80 (4P), and then check
begun; therefore, the copier does
C3452 that the resistance across CN80-2 and -3 on
not complete the warm-up cycle.
the Thermistor is infinity. 5 Check the
- The temperature of the Fusing
operation of the TH2. Remove CN81 (4P),
Rollers does not reach the
and then check that the resistance across
required level even after the set
CN81-2 and -3 on the Thermistor is infinity.
period of time has elapsed during
6 Check the continuity of the H1. Correct or
a warm-up cycle.
replace as necessary. 7 Check the
continuity of the H2. Correct or replace as
necessary. 8 Change PU1. 9 Change PWB-
A.
1 Check that the H1 comes on when the
Main Power Switch is set to ON, and correct
or replace as necessary. 2 Check that the
H2 comes on when the Main Power Switch
is set to ON, and correct or replace as
necessary. 3 Check the installation of the
High Fuser Temperature Failure
TH1 and the TH2, and correct or clean as
(Main)
necessary. 4 Check the operation of the
- The Fusing Roller Thermistor
TH1. Remove CN80 (4P), and then check
and Fusing Roller Sub Thermistor
C3751 that the resistance across CN80-2 and -3 on
are detected to be at a
the Thermistor is infinity. 5 Check the
temperature above 240 °C when
operation of the TH2. Remove CN81 (4P),
the Main Power Switch is set to
and then check that the resistance across
ON.
CN81-2 and -3 on the Thermistor is infinity.
6 Check the continuity of the H1. Correct or
replace as necessary. 7 Check the
continuity of the H2. Correct or replace as
necessary. 8 Change PU1. 9 Change PWB-
A.
7

1 Check that the H1 comes on when the


Main Power Switch is set to ON, and correct
or replace as necessary. 2 Check that the
H2 comes on when the Main Power Switch
is set to ON, and correct or replace as
necessary. 3 Check the installation of the
High Fuser Temperature Failure
TH1 and the TH2, and correct or clean as
(Sub)
necessary. 4 Check the operation of the
- The Fusing Roller Thermistor
TH1. Remove CN80 (4P), and then check
and Fusing Roller Sub Thermistor
C3752 that the resistance across CN80-2 and -3 on
are detected to be at a
the Thermistor is infinity. 5 Check the
temperature above 240 °C when
operation of the TH2. Remove CN81 (4P),
the Main Power Switch is set to
and then check that the resistance across
ON.
CN81-2 and -3 on the Thermistor is infinity.
6 Check the continuity of the H1. Correct or
replace as necessary. 7 Check the
continuity of the H2. Correct or replace as
necessary. 8 Change PU1. 9 Change PWB-
A.
1 Check that the H1 comes on when the
Right-Side Door is opened, then closed, and
correct or replace as necessary. 2 Check
that the H2 comes on when the Right-Side
Low Fuser Temperature Failure
Door is opened, then closed, and correct or
(Main)
replace as necessary. 3 Check the
- The Fusing Roller Thermistor
installation of the TH1 and the TH2, and
and Fusing Roller Sub Thermistor
correct or clean as necessary. 4 Check the
are detected to be at a
operation of the TH1. Remove CN80 (4P),
temperature below 105 °C during
C3851 and then check that the resistance across
standby.
CN80-2 and -3 on the Thermistor is infinity.
- The Fusing Roller Thermistor
5 Check the operation of the TH2. Remove
and Fusing Roller Sub Thermistor
CN81 (4P), and then check that the
are detected to be at a
resistance across CN81-2 and -3 on the
temperature below 105 °C during
Thermistor is infinity. 6 Check the continuity
printing.
of the H1. Correct or replace as necessary.
7 Check the continuity of the H2. Correct or
replace as necessary. 8 Change PU1. 9
Change PWB-A.
Low Fuser Temperature Failure 1 Check that the H1 comes on when the
(Sub) Right-Side Door is opened, then closed, and
- The Fusing Roller Thermistor correct or replace as necessary. 2 Check
C3852 and Fusing Roller Sub Thermistor that the H2 comes on when the Right-Side
are detected to be at a Door is opened, then closed, and correct or
temperature below 105 °C during replace as necessary. 3 Check the
standby. installation of the TH1 and the TH2, and
8

- The Fusing Roller Thermistor correct or clean as necessary. 4 Check the


and Fusing Roller Sub Thermistor operation of the TH1. Remove CN80 (4P),
are detected to be at a and then check that the resistance across
temperature below 105 °C during CN80-2 and -3 on the Thermistor is infinity.
printing. 5 Check the operation of the TH2. Remove
CN81 (4P), and then check that the
resistance across CN81-2 and -3 on the
Thermistor is infinity. 6 Check the continuity
of the H1. Correct or replace as necessary.
7 Check the continuity of the H2. Correct or
replace as necessary. 8 Change PU1. 9
Change PWB-A.
1 Check the MFBS/MFBS2 connector for
proper connection, and correct as
necessary. 2 Check the PWB-A connector
for proper connection, and correct as
Main body Communication Failure
necessary. 3 Check the flat cable between
Communications with the
C4001 MFBS/MFBS2 and PWB-A for proper
Mechanical Control Board and the
connection, and correct as necessary. 4
MFBS Board/MFBS2 Board fail.
Turn OFF the Main Power Switch, wait for
10 sec. or more, and turn ON the Main
Power Switch. 5 Change MFBS/MFBS2. 6
Change PWB-A.
HSYNC Detection Failure
- No SOS falling edges are 1 Turn OFF the Main Power Switch, wait for
detected within the set period of 10 sec. or more, and turn ON the Main
time after laser emission began Power Switch. 2 Check the PH and the
C4002
while the Polygon Motor is PWB-A connectors for proper connection,
turning. and correct as necessary. 3 Change PH. 4
- No SOS falling edges are Change PWB-A.
detected while VIA remains ON.
Polygon Motor Failure
- The Polygon Motor Lock signal
could not be detected within the
set period of time after the
Polygon Motor is energized.
(Faulty start detection)
1 Check the PH connector for proper
- No First Lock signals are
C4101 connection, and correct as necessary. 2
detected during the 1- second
Change PH. 3 Change PWB-A.
period that starts 1 second after a
First Lock signal. (Faulty lock
signal detection)
- The Polygon Motor Lock signal
could not be detected after the set
period of time has elapsed while
9

the Polygon Motor is turning.


(Out-of-timing lock detection)
- The Polygon Motor Lock signal
is set to ON for longer than the set
period of time while the Polygon
Motor remains stopped.
(Abnormal lock detection)

Code Description Remedy


1 Turn OFF the Main Power Switch, wait
Main Body G/A Communication
for 10 sec. or more, and turn ON the Main
Failure
Power Switch. 2 Check each control
C4721 - Communications with the gate array
board and the PWB-A for proper
for expansion I/O (the IC mounted on
connection, and correct as necessary. 3
the Mechanical Control Board) fail.
Change PWB-A.
1 Check the M1 connector for proper
connection, and correct as necessary. 2
Main Motor Failure
Check the M1 for proper drive coupling,
- The Transport Motor Lock signal
and correct as necessary. 3 Check the
C5102 remains set to H for a set period of
PWB-A connector for proper connection
time while the Transport Motor is
and correct as necessary. 4 M1 operation
turning.
check PWB-A PJ28A-4 (REM) M-4 5
Change PWB-A. 6 Change PU1.
Power Supply Cooling Fan Motor
Failure
- The Power Supply Cooling Fan
Motor Lock signal remains set to H 1 Check the M4 connectors for proper
for a set period of time while the connection, and correct as necessary. 2
Power Supply Cooling Fan Motor is Check the fan for possible overload, and
C5351
turning. correct as necessary. 3 M4 operation
- The Power Supply Cooling Fan check PWB-A PJ33A-1 (REM) D-5 4
Motor Lock signal remains set to L Change PU1.
for a set period of time while the
Power Supply Cooling Fan Motor
remains stopped.
Cooling Fan Motor Failure
- The Cooling Fan Motor Lock signal 1 Check the M5 connectors for proper
remains set to H for a set period of connection, and correct as necessary. 2
C5352 time while the Cooling Fan Motor is Check the fan for possible overload, and
turning. correct as necessary. 3 M5 operation
- The Cooling Fan Motor Lock signal check. 4 Change PWB-A.
remains set to L for a set period of
10

time while the Cooling Fan Motor


remains stopped
IU Cooling Fan Motor Failure
- The IU Cooling Fan Motor Lock
signal remains set to H for a set 1 Check the M6 connectors for proper
period of time while the IU Cooling connection, and correct as necessary. 2
C5353 Fan Motor is turning. Check the fan for possible overload, and
- The IU Cooling Fan Motor Lock correct as necessary. 3 M6 operation
signal remains set to L for a set check. 4 Change PWB-A.
period of time while the IU Cooling
Fan Motor remains stopped.
Engine connection error
- The system fails in checking initial
engine connection when the Power
Switch is turned ON. 1 Check the connection between
- The system succeeded in checking Mechanical Control Board and BCRS
C7001 initial connection when the Power Board. 2 Reset the malfunction and turn
Switch was turned ON; then it fails in OFF and ON the Power Switch. 3
rechecking initial connection through Change BCRS. 4 Change PWB-A.
the execution of a software reset
when a communications error occurs
during operation.
ADF Fan Motor Failure
C8301
- See DF-620 service manual.
ADF Document Size Failure
C9701 Adjustment
- See DF-620 service manual.
1 Turn OFF the Main Power Switch, wait
MIO Device Failure for 10 sec. or more, and turn ON the Main
CA052 - The MIO device does not operate Power Switch. 2 Check the BCRS
properly connectors for proper connection, and
correct as necessary. 3 Change BCRS.
Flash ROM Failure 1 Turn OFF the Main Power Switch, wait
- The Flash ROM data was for 10 sec. or more, and turn ON the Main
CC153
determined to be faulty when the unit Power Switch. 2 The firmware data is
was turned on. overwritten. 3 Change PWB-A.
Exit Option Flash ROM Failure
CC155 - See FS-530/PU-501/OT-602
service manual.
HDD error 1 Turn OFF the Main Power Switch, wait
CD004 - When error occurs during deletion for 10 sec. or more, and turn ON the Main
of HDD data. Power Switch. 2 Check theHard Disk
11

connector for proper connection and


correct as necessary. 3 Reinstall the
Hard Disk. 4 Change Hard Disk. 5
Change MFBS/MFBS2.

S-ar putea să vă placă și