Sunteți pe pagina 1din 3

Our Submittal

PAGE 12 / 12
Field Joint View
Supplied Product View

WLO/ KLO type heat-shrinkable sleeves


Table 1: Summary of Dimensions
Unit of
Dimension Description Nominal Value
Measure
A Pipe Diameter inch Various
B Total Cutback Length mm 300
C Factory Coating -- 3LPE
D Sleeve Width mm 450
E Factory Coating Overlap mm 75
F Sleeve Length mm Various
G Closure Width (Pre-attached) mm 100
H Adhesive Thickness (“as supplied”) mm 1.65
I Backing Thickness (“as supplied”) mm 0,9

25 Bethridge Road, Toronto, Ontario, Canada M9W 1M7 Tel: (416) 743-7111 Fax: (416) 743-5927 www.canusacps.com
Installation Guide

CanusaWrap™
Two-piece protective bulk roll with separate closure

Product Description Storage & Safety Guidelines Equipment List


1 2 3
To ensure maximum performance, store
Canusa products in a dry, ventilated area. Keep
CAN

products sealed in original cartons and avoid


USA

exposure to direct sunlight, rain, snow, dust or


other adverse environmental elements. Avoid
-CP

prolonged storage at temperatures above 35°C


S

SOLVENT
(95°F) or below -20°C (-4°F). Product
installation should be done in accordance with
local health and safety regulations.
Bulk Roll Closure
CanusaWrapTM is typically shipped in bulk rolls. The These installation instructions are intended as a Propane tank, hose, torch & regulator Appropriate
adhesive is protected from contamination by an guide for standard products. Consult your Canusa tools for surface abrasion
inner liner. Closures are shipped either in bulk rolls representative for specific projects or unique Knife, roller, rags & Canusa approved solvent cleanser
or pre-cut. applications.
Digital thermometer with suitable probe
Standard safety equipment: gloves, goggles, hard hat,
etc.

Product Preparation Guidelines Surface Preparation


4 Bulk Roll Closure 5
overlap

SOLVENT
L
Corner Cuts
A <450mm Pipe O.D.
Pipe O.D.: B
A-50mm, B-25mm
Closure
<450mm (18")
Cut
Underlap

Overlap

100 mm overlap W
Sleeve
>450mm (18")
150 mm overlap
Sleeve >450mm Pipe O.D. width
A-100mm, B-50mm

As a guideline,cut the required lengths of Sleeve material (L)and Closure material (W) from the bulk roll as follows Ensure that the PE coating edges are beveled to 30°.
L = Coated Pipe circumference + overlap dimension W = Sleeve Width Clean exposed steel and adjacent pipe coating with a
solvent cleanser to remove the presence of oil,
Ensure that the sleeve and closure are not damaged or contaminated. Trim corners as shown . grease, and other contaminants.
Please see “CanusaWrapTM Sleeve Cutting Guideline” for more information on alternative cutting methods.

Surface Preparation and Pre-Heat Chart Flame Intensity & Torch Size
6 Standard Sleeves Surface Preparation Min. Pre-Heat Temp. 7
SIS Standard SSPC Standard °C (°F) Pipe O.D. Pipe O.D.
Minimum Preferred Minimum Preferred <450mm >450mm
WLG WTG St2 Sa2 SP2 SP6 50 (122) (18") (18")
WLC WTC St2 Sa2 SP2 SP6 60 (140)
Mastic

WLS WTS St2 Sa2 SP2 SP6 65 (150)


WLO WTO St2 Sa2 SP2 SP6 75 (167)
WLON WTON St2 Sa2 SP2 SP6 75 (167)
WLNN WTNN St3 Sa2½ SP3 SP10 90 (195) Use moderate flame Use moderate to high
WLA St3 Sa2½ SP3 SP10 60 (140) intensity for pre-heating flame intensity for pre-
Melt
Hot

SP10 and shrinking. heating and shrinking.


WLAS St3 Sa2½ SP3 90 (195)
Minimum Torch Size: Minimum Torch Size:
150,000 BTU/hr. 300,000 BTU/hr.

Surface Preparation Pre-Heat


8 h
9 10
idt 0mm
v e W e+5
e
Sle Sleev
m +
50m

Ensure that the pipe is dry before cleaning. Wipe clean or air blast the steel and pipe coating to Pre-heat the joint area to the minimum required
Prepare the steel joint area using the Surface remove foreign contaminants. temperature (see Surface Preparation & Pre-Heat
Preparation and Pre-Heat as a guideline. Lightly Chart). Using a temperature measuring device,
abrade the pipe coating adjacent to the cutback ensure that the correct temperature is reached on
area to a distance of 50mm (2") beyond each end the steel and at least 50mm (2") on each side of the
of the sleeve width. sleeve.

CANUSA-CPS is registered to ISO 9001:2008. Part No. 99060-022


Sleeve Installation
CanusaWrap™
11 12 10 2
13

1
2

Partially remove the release liner and gently heat Centre the sleeve over the joint so that the sleeve Wrap the sleeve loosely around the pipe, ensuring
the underlap approximately 150 mm (6") from the overlaps between the 10 and 2 o'clock positions. the appropriate overlap. Gently heat the backing of
edge. Press the underlap firmly into place and remove the the underlap and the adhesive side of the overlap.
remaining release liner. Press the overlap into place.

14 15A C E

B D F

Remove any release liners from the closure. Gently heat the closure and pat it down with a gloved hand. Repeating this procedure, move from one side to
Centre the closure on the overlapping sleeve. the other. Smooth any wrinkles by gently working them outward from the centre of the closure with a roller.
Press down firmly.

16 17 18

Pipe O.D.:
<450mm (18")
1 torch
>450mm (18")
2 torches

Using the appropriate sized torch, begin at the Continue heating from the centre toward one end Shrinking has been completed when the adhesive
centre of the sleeve and heat circumferentially of the sleeve until recovery is complete. In a begins to ooze at the sleeve edges all around the
around the pipe. Use broad strokes. If utilizing similar manner, heat and shrink the remaining side. circumference. Finish shrinking the sleeve with
two torches, operators should work on opposite long horizontal strokes over the entire surface to
sides of pipe. ensure a uniform bond.
Inspection
19 20 21
2

1
2
1

While the sleeve is still hot and soft, use a hand Continue the procedure by also firmly rolling the Visually inspect the installed sleeve for the following:
roller to gently roll the sleeve surface and push any closure with long horizontal strokes from the weld • Sleeve is in full contact with the steel joint.
trapped air up and out of the sleeve, as shown outwards. • Adhesive flows beyond both sleeve edges.
above. If necessary, reheat to roll out air. • No cracks or holes in sleeve backing.

Backfilling Guidelines
After shrinking is complete, allow the sleeve to cool for 2 hours prior to lowering and backfilling. To prevent damage to the sleeve, use selected backfill
material, (no sharp stones or large particles) otherwise an extruded polyethylene mesh or other suitable shield should be used.

www.canusacps.com

Canada U.S.A./Latin America Europe/Middle East Asia/Pacific


CANUSA-CPS CANUSA-CPS CANUSA-CPS CANUSA-CPS
a division of SHAWCOR LTD. a division of SHAWCOR INC. a division of Canusa Systems Ltd. a division of SHAWCOR LTD.
25 Bethridge Road 2408 Timberloch Place Unit 3, Sterling Park #05-31, Blk 52, Frontier
Rexdale, Ontario Building C-8 Gatwick Road Ubi Avenue 3
M9W 1M7, The Woodlands, Texas Crawley, West Sussex Singapore
Canada 77380, U.S.A. England RH10 9QT 408867
Tel: +1 (416) 743-7111 Tel: +1 (281) 367-8866 Tel: +44 (1293) 541254 Tel: +65-6749-8918
Fax: +1 (416) 743-5927 Fax: +1 (281) 367-4304 Fax: +44 (1293) 541777 Fax: +65-6749-8919
Canusa warrants that the product conforms to its chemical and physical description and is appropriate for the use stated on the installation guide when used in compliance with Canusa’s written instructions. Since many
installation factors are beyond our control, the user shall determine the suitability of the products for the intended use and assume all risks and liabilities in connection therewith. Canusa’s liability is stated in the standard
terms and conditions of sale. Canusa makes no other warranty either expressed or implied. All information contained in this installation guide is to be used as a guide and is subject to change without notice. This installation
guide supersedes all previous installation guides on this product. E&OE
Printed on recycled paper. Recyclable. IG-A4-CW-rev013

S-ar putea să vă placă și