Documente Academic
Documente Profesional
Documente Cultură
Valve
Document no.
GTF-3-XXXX-XXX-XX-X-0
This document is the property of Oman Gas Company. S.A.O.C. Neither the whole nor
any part of this document may be disclosed to others or reproduced, stored in a
retrieval system, or transmitted in any form by any means (electronic, mechanical,
reprographic recording or otherwise) without prior written consent of the owner.
Content
1. Introduction..............................................................................................................................3
1.1 Purpose........................................................................................................................................................3
1.2 Abbreviations..............................................................................................................................................3
1.3 Definitions...................................................................................................................................................4
1.4 VENDOR Confirmation of Compliance.....................................................................................................4
2. Applicable Codes and Standards............................................................................................4
2.1 Compliance with Shell DEP version 40 and MESC version 13E...............................................................4
2.2 Versions of Codes and Standards................................................................................................................4
2.3 Vendor Awareness of Applicable Codes and Standards..............................................................................4
2.4 Hierarchy of Codes and Standards..............................................................................................................4
2.5 List of Applicable Codes and Standards......................................................................................................5
3. Scope of Supply........................................................................................................................7
4. Technical Requirements...........................................................................................................7
4.1 General........................................................................................................................................................7
4.2 Design / Manufacturing...............................................................................................................................8
4.3 Sour service specification............................................................................................................................8
4.4 Marking.......................................................................................................................................................8
4.5 Painting and Coating...................................................................................................................................8
4.6 Spare Parts...................................................................................................................................................8
5. Quality Control, Inspection, Testing and Certification.........................................................8
5.1 Inspection & Testing....................................................................................................................................8
6. Preparation for Shipment........................................................................................................9
7. Delivery.....................................................................................................................................9
8. Warranty...................................................................................................................................9
9. Documentation.........................................................................................................................9
9.1 Documentation to be supplied with offer..................................................................................................10
9.2 Documentation to be supplied after award of contract..............................................................................10
10. Vendor Responsibility............................................................................................................10
11. Appendices..............................................................................................................................11
11.1 Appendix-1, Table of Compliance (1 Sheet).............................................................................................11
11.2 Appendix-2, Data Sheet for Ball Valves (4 Sheets)..................................................................................12
11.3 Appendix-3, VDRL (7 Sheets)..................................................................................................................13
1.1 Purpose
Oman Gas Company S.A.O.C. (OGC) is the gas transportation company in Oman delivering
1. Introduction
natural gas to main economic sectors and major consumers comprising of Domestic, Power and
Desalination plants, Fertilizer, Methanol, Petrochemical, Refinery, Steel and Cement plants.
The Company transmits and distributes natural gas to the various consumers through a large
network of gas pipelines, compressor stations and gas supply stations. The company's gas
pipeline network is spread across the country with more than 2300 kilometers of high pressure
transmission pipelines and ancillary facilities covering Fahud, Muscat, and Sohar in the north and
from Saih -Rawl to Salalah in the south of the country.
The purpose of this document is to define the minimum technical requirements for the purchase
of Full Bore Ball valves for Raysut Power Plant GSS.
1.1 Abbreviations
CS Carbon Steel.
DN Diameter Nominal.
GA General Arrangement.
GU Guidelines.
QA Quality Assurance.
SP Engineering Specifications.
1.2
2. Definitions1.3
Applicable 2.2
2.3
2.4 VENDOR
Versions
Vendor
Hierarchy
Codes Awareness
Confirmation
ofofCodes
Codesand
and of
and
Applicable
of
Standards
Standards
Compliance
Standards Codes and Standards
2.1 Compliance with Shell DEP version 40 and MESC version 13E
Manufacturer / Supplier : The party, which manufactures / supplies the Ball valves.
Shall : Mandatory
The VENDOR shall complete the Table of Compliance forming Appendix-1 of this specification.
Any specification items that cannot be complied with by the VENDOR must be noted accordingly in
the Table of Compliance and supported in a separate list of deviations where additional space is
required, referring clause by clause to this specification. Only deviations which are accepted by the
Company will be incorporated into an eventual Purchase Order.
This contract requires compliance to the versions of the codes and standards listed in Shell DEP
version 40 and MESC version 13E. VENDOR shall ensure that this requirement is complied with.
If no revision or issue date is mentioned for referenced International Codes and Standards,
reference should be made to the latest version in force at the time of issue of this document.
It is assumed that all the referenced standards are in the possession of the Vendor. If, however,
any of the Company standards listed are not in the possession of the Vendor, he must immediately
notify the PRINCIPAL and request copies. Failure of the VENDOR to notify the PRINCIPAL of any
company standards not in its possession and any later impact as a result is the responsibility of the
VENDOR. Vendor is responsible for getting International codes / standards without any cost to the
Company.
All specifications, codes and standards listed in this document as applicable, shall be the latest
revisions in force at the time of the Purchase Order unless a specific revision has been defined.
In the event of any conflict or contradiction between the Company Technical Standards and
Procedures the order of priority of the documents shall be in line with the highest possible
standards as follows:
Where the PRINCIPAL Technical Standards and Procedures refer to or amend International Codes
and Standards (e.g. API, ASME, DIN, BS, etc), these International Codes and Standards shall be
deemed to be part of the Specifications.
Any conflicts between this specification and other applicable MESC specifications, Engineering
Standards (DEP/PDO-SP), or industry standards, codes, and forms shall be resolved in writing by
the supplier or manufacturer Representative.
Company Standards
GU-556-Rev-01 (Feb.2007) Guideline for Vendor Project Document Deliverables
Note: The references listed in each following standards shall also be referred.
MESC SPE 77/300A Synopsis of procedure and technical specification for type
acceptance testing (TAT) of industrial valves.
MESC SPE 85/204 Packing Material, Graphite and Carbon Braided Yarn
(Amendments/Supplements to ASTM F 2191).
Note: The references listed in each following standards shall also be referred.
NACE MR-01-75/ ISO Petroleum and natural gas industries – Materials for use in H2S-
15156 containing environments in oil and gas production.
Note: The references listed in each following standards shall also be referred.
2. Scope of Supply
The vendor scope of supply covers but not limited to the design, engineering, fabrication,
assembly, inspection, testing, painting, certification, documentation, packing, shipping and delivery
of Full Bore CS Ball Valves according to this specification and datasheets (Refer Appendix –2).
3. Technical Requirements
3.1 General
VENDOR shall submit the duly filled table of compliance as per Appendix-1, signed and stamped
valve data sheet (Appendix-2) and Vendor Document Requirement Listing (VDRL) form Appendix-
3. The deviations if any shall be listed in the Table of compliance along with technical offer.
Ball valves shall be manufactured in accordance with this specification and the requirements
specified in the valve data sheets (Refer Appendix –2), shall comply SP-2154 and GME-ENG-L2-
203 –R1 requirements. If seal material specified in the data sheet as thermoplastic, it should be of
lip seal type.
All MOC of Ball valves shall comply with NACE MR 01-75/ISO 15156 (all parts), DEP 39.01.10.12-
Gen and SP-2041.
3.4 Marking
Painting and coating (External) shall be done as per is PCS-1 of SP-1246 with colour RAL 9010.
Vendor shall submit E-SPIR forms with all necessary spare parts detail and comply DEP
70.10.90.11-Gen.
Vendor shall submit Inspection and Test Plan (ITP) for Principal review and approval. Third Party
Inspection (TPI) shall be involved to witness specific stage QC hold points as identified in the ITP.
QA/QC activities shall be in alignment with the requirements stated in Appendix C of PR 1984 –
Criticality Rating Procedure for the specific criticality rating indicated for the item under
procurement, and vendor shall confirm acceptance without any deviations”.
The Vendor shall submit inspection certificates as per MESC SPE 77/302, clause 9.
For all Ball valves inspection shall be done as per MESC SPE 77/302 and relevant MESC SPEs
mentioned in the valve data sheets in addition to project specific ITP (Inspection and Test Plan).
ITP shall cover the entire fabrication process and should be submitted by Vendor for Company’s
review and approval, prior to commence of fabrication. A copy of all internal and subcontractor’s
procedure shall be produced for Company’s review, as called on the ITP.
Company shall advise the extent of Company or Company’s Third Party involvement during stage
inspection and Factory Acceptance Testing and Integration Testing along with Company’s
comments / approval of the Quality Plan / Inspection Test Plan. However, Company reserves the
right to audit, inspect or participate in tests as per its discretion, which will be communicated to
Vendor in a timely manner.
Company or Company’s nominated representative shall access at any time to all premises of
Vendor / Sub-Vendor for inspection, testing and Quality audits. All procedures shall be approved by
the Principal.
Packing for shipment shall be in accordance with Company’s shipping instruction. Ball valves shall
be protected against damage and corrosion during transport and storage. Vendor shall submit the
preservation procedure of equipment and/or material in line with applicable Company / Shell
standards.
6. Delivery
The valves in assembled condition SHALL be delivered to Company’s stores (OGC, Mabella
Stores) Sultanate of Oman or as otherwise as directed in the Purchase Order.
7. Warranty
The VENDOR shall provide warranty for the supplied item as below.
Eighteen (18) months from the date of delivery, in accordance with the delivery terms, or within
twelve (12) months after the Goods have been put into commercial operation following satisfactory
completion of the commissioning and testing programme, if any, whichever expires first, or results
from a cause reported.
8. Documentation
All documents as per VDRL (Appendix – 3) shall be supplied as applicable during bidding stage as
well as after award of purchase order.
The vendor shall provide the following information as a minimum with the offer. These documents
shall include but shall not be limited to,
a. Table of Compliance and deviations to specifications, if any (Refer Appendix-1).
b. Completed (Signed and stamped) data sheet for the Ball valves in Appendix – 2.
c. Fabrication and delivery schedule.
d. Vendor’s standard guarantee and warranty of the complete unit.
e. Valve GA drawings.
f. Any other information not specifically listed here, which are considered necessary by the
vendor.
g. Documents / drawings as per VDRL (Refer Appendix-3).
9. Vendor Responsibility
The VENDOR shall be responsible for all activities including transportation, intermediate
storage, payment of all customs duty, port clearance charges etc., until safe delivery of the
material to the Company’s store in Oman. Any damage incurred before hand-over to the
Company shall be to VENDOR’s account. VENDOR or his agent must obtain a Goods Inward
and Damage Report from the Company upon delivery identifying the status of the materials.
The Goods Inwards and Damage Report must accompany Invoice Submission.
This specification shall in no way release the Vendor from final guarantee as to materials,
apparatus, workmanship and performance of the Ball valves.
All correspondences shall be in English.
Vendor shall submit all documents / drawings as per VDRL.
10. Appendices
10.1 Appendix-1, Table of Compliance (1 Sheet)