Sunteți pe pagina 1din 3

UMASHANKAR.

U
I Communication I Team work l Decision Making l Work under Pressure l
Problem Solver l Leadership l Innovative l Hard Worker l Creativity l

QA/QC ENGINEER
s

CONTACT JOB SUMMERY

Mobile-
Experienced QA QC Engineer with welding inspector certification having 8 years
+91-8270622940 extensive working experience in oil & gas Above ground Storage Tanks in different
methods such Double deck and single deck, external and internal floating roof, cone &
Email-
dome roof, single and double bottom Tanks, fabrication and Erection of Piping, pipe lines,
ujshankar09@gmail.com Distillation MED Evaporators and structural. Seeking to use proven skills and hard
S
working to improve quality aspects of the product in the way of company system.
EDUCATION

Bachelor of Mechanical PROFESSIONAL EXPERIENCE


Engineering

Anna University-Tiruchirappalli 1. Organization (at Last – December 2017 to April 2019)

M/s. CHEMIE TECH DMCC (BR) FZE (Lekki Free Trade Zone, Lagos, Nigeria)
First Class with Distinction
Chemie Tech is providing EPC solutions & services and leading in
2007-2011 Above Ground Storage Tanks Manufacturer having manufacturing facilities at
Sharjah, UAE and CTL having projects in Australia, South Africa, Nigeria, India
TECHNICAL SKILLS and Ghana etc. CTL has ISO 14001:2004, ISO 9001:2008, BS OHSAS
18001:2007 certifications
1. CSWIP 3.1 –Certified
Welding Inspector Project:
(Certificate No: 93717)
Client: Dangote Oil Refinery Company Ltd, Nigeria.

2. ASNT NDT Level II in PMC: Engineering India Ltd,


following testing.
(Total 82 Tanks, Maximum diameter 90m and Minimum diameter 30m and
having EFR, IFR, Dome and Cone Roof Tanks & its piping and structures)
❖ Visual Test,
❖ Radiography Test,
❖ Magnetic Particle
Test, 2. Organization (at past – September 2013 to November 2017)
❖ Ultrasonic Test,
❖ Liquid Penetrant M/s. QUALITY INTERNATIONAL Co. LTD (Free Zone, hamriah, UAE)
Test.
Quality International is a leading Process Equipment Manufacturer
having manufacturing facilities at Sharjah and Fujairah, United Arab Emirates.
KNOWN LANGUAGES QICL is ISO 14001:2004, ISO 9001:2008, BS OHSAS 18001:2007 and ASME
"U","U2" & "S" stamps and National Board "R" & "NB" certifications

Tamil, English, Hindi


and Telugu.
Projects # 1

• Amman strategic Reserve Terminal for Petroleum Products with consists


COMPUTER SKILLS of 6 Gasoline Tanks – Amman, Jordan.

Contractor: OHL and MID Joint Venture.

• MS Office (Design, Fabrication and Erection of 46 m and 36 m diameter of


Storage Tanks, its piping and Structures)
o Word, Excel , Projects # 2
PowerPoint and
Outlook • Fujairah Oil Terminal Project in Fujairah, UAE with 7 number of Storage
tanks
• AutoCAD
Contractor: Rotary Engineering Ltd

• PDF Editor and Reader (Fabrication and Erection of 7 above ground storage Tanks-
maximum diameter of tank 72m).

AREA OF KNOWLEDGE Projects # 3

• Fundamental Understanding of • Az-Zour Oula North Phase-1-IWPP MED Evaporator


following International Codes and
standards Contractor: SIDEM – Veolia Water Technologies
o ASME-Sec-II,V,VIII and
IX (Fabrication and Erection of Multiple Effect Distillation Evaporator -
o ASME B 31.3 51m X 30m X 6 No’s, its Structures and piping)
o API 620 and API 650
3. Organization (at past - Nov 2011 to August 2013)
o D1.1
o ASTM M/s. AARKAY AND BROS. (Chennai, Tamilnadu, India)

• Project: Louis Dreyfus Commodities India Pvt. Ltd


• Preparation and Review of following
Specification and Procedures Contractor: Aker Solutions.

o PQR and WPS for (Vegetable Oil Refinery Plant – Fabrication and Erection of 28
SMAW,SAW,GTAW, Product Storage tanks, Heating Coil and Structural)
FCAW
o ITP’s for Storage 4. Organization (at past - Since May 2011 to Sep 2011)
Tanks, Piping,
M/s. CRIMSON METAL ENGINEERING PVT LTD . (Pondicherry, India)
Structural
o Material Handling • (Black and Galvanized Welded Pipes Manufacturing)
o Consumable Handling
o Fabrication Procedure
o Erection Procedure
o NDT methods JOB RESPONSIBILITIES
DPT,MPI,UT,RT,VT
o PWHT Procedure
o Blasting & Painting ❖ Co-ordinate with Sub-Contractor, vendors, Client and Third party for inspection
activities.
Procedure
❖ Executing inspection activities for Fabrication and Erection of Above ground
o Weld Map storage Tanks under API 650 and API 620
o Documentation ❖ Executing inspection activities for Fabrication and Erection of Structural such as
Main girders, Rafters, Cross girders, columns, pipe racks, walkways and etc
under D1.1.
❖ Executing inspection activities for Fabrication and Erection of Above ground
pipe line and underground pipe line and piping under B31.3
❖ Conducting inspection as per approved Inspection & test Plan, approved
drawings, Specifications and Codes & standards.
• Testing & its Procedures ❖ Witnessing the Qualification of the PQR's and supervising the process with Client
and TPI.
o Hydro Test ❖ Review Project approved drawing, Weld map and welding Procedure
Specification.
o Tank Hydrostatic Test
❖ Preparation and updating of RT history sheet, RT Map, Weld map by Excel and
o Pneumatic Test AutoCAD, Piping line history sheet, Tank history sheet.
o Pressure Test ❖ Preparation and Review of Method statement for construction, inspection &
o Oil penetrate Test Testing Plan.
o Vacuum Test ❖ Carrying out preliminary inspection of income materials of construction &
o Vacuum box test reviewing the materials against mill certificate, project specification, Project
o Hammer Test drawings and standards.
o RF Pad Pneumatic Test ❖ Preparing the weld & material traceability report and updating the same.
o Roof Floatation Test ❖ Carrying out Mechanical dimensional Inspections.
❖ Conducting inspection of structure and piping layouts, alignment, straightness
and distortion.
PERSONNAL DETAILS ❖ Inspection of weld joint fit-up alignment prior to root pass, during welding and
visual inspection of final weld. Then Conducting a Oil penetrate test & Vacuum
test on welding joints as per approved procedures.
❖ Conducting Peaking & banding inspection, Roundness inspection, Plumpness
• Father’s Name: inspection, Rim space measurement and OCF measurement for each shell
before and after welding.
G. UTHIRAPATHY ❖ Coordination of inspection activities with client and subcontractor with reference
to approved project specifications, drawings and codes and & standards.
Preparing and review of construction procedures, Painting and coating
• Date of birth: procedures, Fabrication, Erection, hydro testing, pneumatic test procedures,
repair procedure and Quality testing Procedures.
3 July 1989 ❖ Executing inspection and Handling of Income Raw materials, welding
consumables and painting consumables.
• Marital Status: ❖ Review and preparation of NDT reports, Witness of NDT Inspections and
Executing or witnessing of Quality testing such piping hydro test, hydrostatic test,
Married flushing, pneumatic test, RF pad pneumatic test, pressure test, vacuum test,
hammer test, Roof floatation test.
❖ Identifying & issuing of non-conformity as observed during site inspections and
• Nationality: surveillance based on approved documents.
❖ Conducting mockup test and preparing reports.
Indian ❖ Issuing of site observation as observed during working
❖ Interpretation of RT films in dark room and attending repairs as per repair
procedure.
❖ PWHT shop and Site (Furnace and machine methods) and Hardness Testing
PASSPORT DETAILS ❖ Preparing and updating check list with continues monitoring as per approved
drawings for final walkthrough.
❖ Preparing and issuing punch list after final walkthrough inspection as per
K1669237 drawings.
❖ Preparation of documentations relevant to client requirements.
Date of issue – 19 November 2012 ❖ Coordination of Tank calibration with client.
❖ Conducting Blasting & Painting Inspection such as Surface profile inspection, Salt
Contamination test, Pull off test, Tooke test and X cut test.
Date of expiry –18 November 2022
❖ Preparation of dossier for Pre-commissioning and Commissioning.

Your’s faithfully

Place : Tamilnadu,India

Date : 23 October 2019 (UMASHANKAR.U)

S-ar putea să vă placă și