Sunteți pe pagina 1din 20

1/20

Project proposal for:

ADVANCE MANUFACTURING TECHNOLOGY


TRAINING CENTER FOR
ELECTRICAL & WELDING
Phase 1
2/20

Summary

No. QTY UNIT DESCRIPTION PICTURE UNIT PRICE AMOUNT

1 1 set Electrical Installation Php 3,337,200 Php 3,337,200


Training System

(workbench,consumables,
platform)

1 Fault Assessment Module Php 2,202,600 Php 2,202,600

1 Residential and Building Php 2,580,800 Php 2,580,800


Intelligent Control (KNX
Technology)

2 1 set Advance Virtual Welding Php 4,402,200 Php 4,402,200

Trainer - Single User

3 1 set Advanced Process Welding Php 3,289,500 Php 3,289,500


Machine

Total Amount, VAT Inclusive : Php 15,812,300


3/20

Subject: Electrical Installation Training System

No. DESCRIPTION

1 Electrical Installation Training System

The picture is for reference only

Ⅰ. Equipment overview
electrical installation equipment is the designated equipment for China selection
competition of the 44th world skills competition, in compliance with the requirements and
standards of WSC. It will train various kinds of innovated design ability, practical operation ability,
and engineering practical ability of students according to the standards and processes of WSC. It,
as a designated equipment in China national selection competition for world skills competition,
has received great attention in China. The equipment is also equipped with the world's skills
competition supporting resource package.
This equipment also includes building intelligent control training system, using KNX digital
distributed control system for automation and centralized control management within the area of
all kinds of lighting, air conditioning, curtains and other electrical equipment. It can fulfill the
energy monitoring, not only effectively managing the electrical equipments, and providing
flexible functions and effects, but also maintain and extend the service life of lamps and electrical
equipment to achieve safety, energy saving, hommization , intelligentization . It can also be
conveniently used according to the needs of users for expansion in the feature.

Electrical installation device project, taking world skills competition modes and ideas for
reference, is designed by combining with the practical training characteristics of technical schools.
It is synchronous with the latest information of electrical installation device project in WSC,
complete sharing the resources. The built equipment, in full compliance with the world
competition site environment, let students experience the charm of the world competition.
Related supporting information of this equipment consists of not only supporting test and
evaluation standard of world skills competition and national skills competition, but also the
training simulation questions and evaluation standards for WSC, and safety and health standards,
etc.

II. Technical Parameter:


1. Outline dimension: ladder structure, outer side is established by patch board, and inner side is
established by five simulation metopes.
1.1 Left hand panel board (A)/1200mm x 2400 x1.8 mm
1.2 Right hand panel board (B)/1200mm x 2400 x1.8 mm
1.3 Front panel board dimension
4/20

Subject: Electrical Installation Training System

No. DESCRIPTION

Panel board (1) 1000 x 952.5 x 1.8mm two plates


Panel board(2) 1000 x 792.5x 1.8mm two plates
Panel board(3) 1745 x 378 x 1.8mm one plate
Ceiling board (D)/front 2624mm,back 1816 mm,depth:1262 mm
1.4 The included angle between the left panel and the main panel is 109.
2. Operation desk and tools box
Operation desk:1600(L)X700(W)X750(H)
It provides for workers operating platform, avoiding the interference of various factors, easy to
operate and to protect workers. It plays a key role in completion of the operation.
Tools cabinet:
It is to protect the safety of the operators, available for the tools stroage.
3.Power supply: It adopts emerging technologies for electrical installation, with each station
equipped with a power socket (AC380V three-phase five wires), a computer power socket
(AC220V single phase), a power socket for player's electrical construction. (AC220V single
phase), a lighting fluorescent lamp, and 1 power strip.
3.1 Input power:three phase three wires 380V±10% 50HZ
3.2 Working environment:environment temperature range -5~40℃
3.3 Capacity:AC<4KVA
3.4 Safety Protection:leakage protection(working current≤30mA),overcurrent protection,
overload protection, emergency stop protection,undervoltage protection
3.5 Relative humidity:<85%

Ⅲ. Features
(1) It uses the actual housing construction structure to isolate each room, close to the work site and
of full compliance with the guidelines and scope of knowledge of the World Skills Competition .
(2) It is installed by use of patch board and wooden mounting plate structure, which is in full
compliance with the equipments requirements of the World Skills Competition. Features: a. This
equipment complies with architectural standards; b. The use of wood plates makes it closer to the
wall mounting for students; c. Patch board structure increases the flexibility of equipments which
is convenient for practical teaching after competition; d. Open room with trapezoidal structure,
fully consistent with the World Skills Competition environment, makes students easily complete
installation of different lines within the three-dimensional space and master various installation
technology; e. Patch board is adopted for easy training and simulation test. It can be repeatedly
used and easy to operate by using patch board. The wooden plate in skills assessment can simulate
real race conditions.
(3) It provides with a fault detection module which contains lighting and electric drive control
principle. Students will complete the task of failure detection through the device including
detecting the fault type and the fault area, and accordingly making analysis according to the
setting of the fault .
(4) One student is to compete(or train) independently who needs to compete within the specified
time in accordance with the requirements of the task module (or training). Combined with
technical colleges practice teaching characteristics, this total task consists of several sub tasks,
which are interrelated to fully train the electrical equipment installation and debugging capabilities
of students, especially the repair and maintenance ability of electrical equipments.
5/20

Subject: Electrical Installation Training System

No. DESCRIPTION

Ⅳ.Configuration
No Item Picture(for reference only) Functions

1 Training platform Simulating the house structure

It provides the general power for the total


training set with leakage protection breaker,
air switch, fuse, three phase power
indicating lamp, key switch, emergency stop
for operating and indicating, lighting power
2 Distribution box switch for lighting,4 outlet socket, 6 outlet
socket,and
K4 protection terminal for external
equipments, and also three phase four wires
industrial socket for power supply of
external equipments

For electrical installation training. It will be


combined to use to fulfill the control training
according to different training contents, eg.
3 Electrical control part the direct start of 3 phase asynchronous
motor,
the start of 3 phase asynchronous motor by
LOGO

As a separate control to operate in lighting


4 Distribution box
training

Provide the motor training requirements of


5 Motor
electrical control

Be used for students to detect and analyze


6 Fault detecting module
the electrical circuit fault
6/20

Subject: Electrical Installation Training System

No. DESCRIPTION

7 Moveable workbench Integral welding

8 Computer table

9 Materials and disc software

10 Specification andsample program

V. The configuration lists of basic modules


Table 1 Configuration of fault detecting module
No. Item Specifications Unit Qty
1 Industrialdistribution box 800mm×600mm×230mm pcs 1
2 Breaker DZ47-60 C type 3P 25A pcs 1
3 Breaker DZ47-60 C type 3P 10A 1
4 Breaker DZ47-60 C type 3P 10A pcs 1
5 Breaker DZ47-60 C type 1P 10A pcs 1
6 Breaker DZ47LE-60 C type 1P+N 20A pcs 1
7 Breaker DZ47KLE-60 C type 1P+N 20A pcs 1
8 Breaker DZ47sLE-60 C type 1P 6A pcs 1
9 Breaker DZ47sLE-60 C type 2P 6A pcs 1
10 Breaker CJX1-09/22Z DC24V pcs 5
12 JRS1D-25/Z 0.63-1A pcs 3
Thermal relay
13 JRS1D-25/Z 0.4-0.63A pcs 1
14 Thermal relay seat Matching use pcs 4
15 Single joint single withtype
86 the AC220V pcs 2
control joint dual
16 Single 86 type AC220V pcs 2
control detector
17 Mobile TCZ3900 AC220V 86 type pcs 1
18 Electric incandescent AC220V 25W small bulb pcs 4
19 5 lamp
outlet socket 86 type pcs 2
20 DC24V switching AC220V3A
DC24V pcs 1
mode power supply
21 Button φ22 red self-reset pcs 2
22 Button φ22 green self-reset pcs 4
23 Overall-limit switch LXJM1-8108 pcs 2
24 Indicating lamp Delix green
DC24V pcs 4
25 Optical- electrical φ22
External pcs 2
sensor
26 Time relay diameter
Time delay 18 pcs 2
27 Intermediate relay NTE8-
DC24V LY4N- pcs 2
28 Intermediate relay J 4 open 4 Omron
PTF14A-E pcs 2
29 seat φ22 DC24V Red pcs 2
Indicating lamp
30 φ22 DC24V Green pcs 2
31 86 type lighting box lighting pcs 11
32 Button box JL-BX2-22 pcs 1
7/20

Subject: Electrical Installation Training System

No. DESCRIPTION

33 Wire distribution pcs 3


34 box type socket
Screw 86 type E27 pcs 4
35 Terminals Dragon brand FJ1-2.5 pcs 40
36 Double colors Dragon brand FJ1-2.5 pcs 3
Dragon brand matching use with the pcs
37 Back plate 3
above terminals
Dragon brand matching use with the pcs
38 White bar 8
above terminals
39 Terminals Dragon brand FJ1-6 pcs 4
40 Double colors Dragon brand FJ1-6 pcs 1
Dragon brand matching use with the pcs
41 Back plate 1
above terminals
42 White bar Dragon brand matching use with the pcs 1
43 End cap pcs 8
44 Rail 35mm aluminum 1 meter/pcs pcs 2
45 4050 2meters/pcs pcs 2
Wiring slot
46 3030 2meters/pcs pcs 1
47 PVC wire slot 60×40,2meters/pcs thickening pcs 3
48 PVC wire slot 60×40,to be used with the above wireslots pcs 3
49 plugging
Multi strand soft 1×1.5mm2,black m 50
50 cables strand soft
Multi 1×0.75mm2,blue、red,each 100 meters m 50
51 cables strand soft
Multi 1×2.5mm2,blue、black,each 10 meters m 20
52 cables strand soft
Multi 1×1.5mm2,double colors m 10
53 cables
Cables 3×1mm2,grounding,Black grey m 20
54 Cables 4×1mm2,Black grey m 20
55 Cables 5×1mm2,Black grey m 20
56 Cables 6×1mm2,Black grey m 20
62 Self locking nylon Black 4*300 bag 1
65 tape
Water proof PG13 pcs 110
connector STM-1 Middle fixing hole:3mm,black is pcs
66 Cable fixer 25
better
3 phase JW6324-180W AC380V rated current pcs
67 1
asynchronous motor 0.65A
68 3 phase dual speed YSB71-24 120/180W rated current pcs 1
asynchronous motor 0.52/0.63A
70 Motor terminal Bending pcs 1
71 2 profile
way connector WAGO,222-412 pcs 30
79 Socket set 1
80 Three cores cables 3×2.5mm2,grounding, black grey m 5
81 Three outlet socket GTB standard pcs 1
82 Button label 22mm pcs 12
Table 2 The configuration list of devices and consumable materials
No. Item Specifications Unit Qty
1 LOGO power SIEMENS,6 pcs 1
2 PLC LOGO SIEMENS pcs 1
3 Communication line LOG pcs 1
4 Distribution box 500mm×600 pcs 1
5 Galvanized distribution 450×525×1.5 pcs 1
6 Three phase AC ETM6314,AC pcs 1
7 Connector CJX1-9/22Z( pcs 2
8 DC relay JQX-13F pcs 4
9 Thermal relay JRSD-25 pcs 1
10 Leakage circuit breaker DZ47LE- pcs 1
11 Leakage circuit breaker DZ47LE- pcs 1
12 Breaker 3P DZ47-63/D10 pcs 1
13 Breaker 3P DZ47-63/D16 pcs 1
8/20

Subject: Electrical Installation Training System

No. DESCRIPTION

14 Breaker 2P DZ47-60/C5 pcs 2


15 Leakage circuit breaker DZ47LE- pcs 2
16 Leakage circuit breaker DZ47LE- pcs 2
17 Leakage circuit breaker DZ47LE- pcs 2
18 Leakage circuit breaker DZ47LE- pcs 2
19 Breaker,1P DZ47-63/C6 pcs 2
20 Breaker,1P DZ47-63/C10 pcs 2
21 AC contactor CDCH8S-25 4PAC220V(Delixi) 4NO pcs 1
22 Time relay CDJS18AAC220V(Delixi 480S pcs 1
23 Time relay CDJS18AAC220V(Delixi) 10S pcs 1
24 E27 screw type bulb 40W pcs 6
25 Travel switch LXJM1-8104 pcs 2
26 DIN rail HR-5600A pcs 1
27 Wiring slot 25×50mm pcs 1
28 Three- hole indicating JL-BX3 pcs 5
29 Rotary switch 22mm pcs 1
30 Button Green,22m pcs 3
31 Button Red,22mm pcs 3
32 Emergency stop button Red,22mm pcs 2
33 White indicating lamp DC24V,22m pcs 2
34 Yellow indicating lamp DC24V,22m pcs 3
35 Green indicating lamp DC24V,22m pcs 3
36 Red indicating lamp DC24V,22m pcs 3
37 Bumper sticker Deli,14x25m pcs 2
38 Industrial socket , 5 AJ- pcs 1
39 Industrial socket , AJ- pcs 1
40 Double layer bright PZ30-30 pcs 1
41 Lighting box 86type,86×8 pcs 18
42 Switch box 100×100×50 pcs 1
43 E27 screw type socket 86type,86×8 pcs 6
44 Dual joint switch 86type , one pcs 4
45 Dual joint switch 86type,two pcs 1
46 Midway switch 86type,one pcs 1
47 Single phase air 86type,16A pcs 2
48 Single phase 5 outlet 86type,10A pcs 2
49 Digital segment switch 3 segments, pcs 1
50 DIN rail end fixer Leipold,E/U pcs 14
51 Spring connection Leipold,bac pcs 6
52 Spring connection Leipold,ST2 pcs 45
53 Spring connection Leipold,ST2 pcs 15
54 Spring connection Leipold,ST2 pcs 15
55 Terminal connection bus Leipold,FBS pcs 3
56 Marking strip for Leipold,ZB5 pcs 8
57 PVC wire slot 60×40mm,A pcs 2
58 PVC wire slot 40×20mm,A pcs 1
59 PVC wire slot terminal 60×40mm pcs 2
60 Hard PVC line pipe Φ20mm,wall pcs 3
61 Hard PVC line pipe Φ16mm, pcs 2
62 PVC flexible tube Φ20mm 米 2
63 PVC line pipe clip Φ20mm pcs 35
64 PVC line pipe clip Φ16mm pcs 20
65 Cable, PVC hose clamp KSS,HC-4 pcs 30
66 PVC tube adapter (cup Φ20mm pcs 16
comb)
67 PVC tube adapter (cup Φ16mm pcs 12
comb)
68 PVC hose adapter Φ20mm pcs 14
69 Metal tube Φ20mm m 1.5
9/20

Subject: Electrical Installation Training System

No. DESCRIPTION

70 Metal tube90°Preformed Φ20mm pcs 2


bend
71 Metal pipe clamp Φ20mm pcs 6
72 Cable connector PG11 pcs 12
73 Cable connector PG16 pcs 8
74 Grid cable tray CM50-100- m 3
75 CSN - hanging bracket for LWB100-300 pcs 6
76 Cable tray butterfly SPB pcs 2
77 Cable connection buckle KK28 pcs 6
78 Cable tray grounding EHB-A/B pcs 6
79 Cable tie L×W:100×3 pcs 100
80 Cable tie L×W:200×3 pcs 100
81 Cable tie L×W:200×5 pcs 100
82 Needle type terminal E1008,1 pcs 150
83 Needle type terminal E1508,1.5m pcs 150
84 Needle type terminal E2508,2.5m pcs 150
85 Double cable needle type TE1008,1 mm² pcs 30
86 Double cable needle type TE1508,1.5mm² pcs 30
87 Double cable needle type TE2510,2.5mm² pcs 30
88 2 way connector WAGO,222- pcs 10
89 3 way connector WAGO,222- pcs 10
90 5 way connector WAGO,222- pcs 10
91 Multi cores cables RVV 3×2.5mm² ,
grounding wire with m 7
92 Multi cores cables RVV 4×2.5mm² ,
grounding wire with m 4
93 Multi cores cables RVV 5×2.5mm² ,
grounding wire with m 5
94 Multi cores cables RVV 4×1mm² m 12
95 Multi cores cables RVV 5×1mm² m 12
96 Multi strand soft cables Red,2.5 m 25
97 Multi strand soft cables Yellow,2.5 m 25
98 Multi strand soft cables Green,2.5 m 25
99 Multi strand soft cables Blue,2.5 m 20
100 Multi strand soft cables Yellow m 20
101 Multi strand soft cables Red ,1.5 m 32
102 Multi strand soft cables Blue,1.5 m 17
103 Multi strand soft cables Yellow m 2
104 Multi strand soft cables Black,1.0 m 20
105 Multi strand soft cables Red,1.0 m 20
106 Banana head and lap Z4 line pcs 3
107 Flat multi strand copper Length 15cm pcs 1
108 Self drilling tapping screws Mushroom pcs 30
109 flat screw Mushroom pcs 100
110 flat screw Mushroom pcs 20
111 flat screw Mushroom pcs 10
112 Screw M4×20mm,h pcs 20
113 Metal flat washers M5×30×1.2 pcs 30
114 PVC line pipe bending Φ20mm pcs 1
spring
115 PVC line pipe bending Φ16mm pcs 1
spring
116 Three phase 5 outlet ( with set 1

Table 3 Configuration of distribution box


No. Item Specifications Qty Unit
1 Power box panel 1 pcs
2 Fuse DZ47LE-16A 1 pcs
3 3P 10A 1 pcs
Air switch
4 2P 6A 1 pcs
10/20

Subject: Electrical Installation Training System

No. DESCRIPTION

5 Rail Aluminum 1 pcs


6 Fuse RTX-18 3 pcs
7 Emergency stop button One close self-locking∮22 1 pcs
8 Key switch ∮22 self-reset 1 pcs
Yellow 1pcs, Green 1pcs, Red pcs
9 3
Indicating lamp 1pcs, ∮16 220V
10 Red ∮16 220V 1 pcs
11 AC connector CJX2-1210 220V 1 pcs
12 Wall switch 86type Single control 1 pcs
13 4 outlet socket 380V 1 pcs
14 6 outlet socket 118type 1 pcs
15 K4 terminal 1 for each Yellow, green, red,and blue 5 pcs
16 Mounting screw ∮4.2*60mm 4 pcs
17 Fluorescent tube Colang 21W LED 1 set
18 5 cores x1.5mm² 10 m
Cables
19 5 cores x1.5mm² 1 m
20 BVR-1.5mm² 40 m
21 Copper cables BVR-1.0mm² 5 m
22 BVR-0.75mm² 20 m
23 Pre insulated cold pressed UT1.25-4 furcation 100 pcs
24 terminal VE0508 aciculiform 50 pcs
Table 4 KNX part of list
No. Item Specifications Qty Unit
1 KNX bus power 9704032 1 pcs
2 4 way AC curtain 1860116 1 pcs
3 Siemens EM528 N528/31 1 pcs
4 Siemens EM528 N528/41 1 pcs
5 Schneider temperature MTN6212-4146 1 pcs
6 Triton temperature 6320/38-83-500 1 pcs
7 Mobile probing 6131/10-24-500 1 pcs
8 On-off controller SA/S 4.16.1 1 pcs
9 Input module HDL-M/S04.1 1 pcs
10 USB bus interface HDL-M/USB.1 1 pcs
11 4 way switch actuator KA/R0416.1 1 pcs
12 Programming software ETS4 Lite 4.1 1 pcs
Table 5 Power tools list
No. Item Specification Qty Unit
1 Drilling bit M4 1 pcs
2 PVC pipe cutter 20-25PPR plastic quick scissor 1 pcs
3 Flat scale Stabila 30cm 1 pcs
4 AC scale 1 meter 1 pcs
5 Laser level and frame Three wires, frame height to be upto 1.5m 1 pcs
6 Measuring tape 3m 1 pcs
7 Reamer 22,used for PVC line slot,red 1 pcs
8 Slitting saw Imported 1 pcs
9 Steel scissor 24 inch 1 pcs
10 Needle crimping pilers To crimp 1/1.5/2 terminal 1 pcs
11 Bundle line gun 1 pcs
12 Tower drill 4mm-32mm 1 pcs
13 Monkey wrench 6寸 pcs
14 Slotted screwdriver M3*75 1 pcs
15 Cross screwdriver M3*75 1 pcs
16 Drawing sucker Strong magnetic hook 2 pcs
17 Ramp 1 pcs
18 Scissor 1 pcs
ProsKit CP-367A gun type pcs
19 Wire stripper 1
automatic wire stripper
11/20

Subject: Electrical Installation Training System

No. DESCRIPTION

20 Screwdriver 63708 1 pcs


21 Screwdriver 63601 1 pcs
22 Electric hand drill GSB10.8-li 1 set
23 Waistcoat According to the students' situation 1 set
24 Earplug 1 pair
25 Insulant shoes According to the students' situation 1 pcs
26 Threader 1 pcs
27 Hammer 1 pcs
28 Hole opener Two for each Φ16 and Φ20 1 pcs
29 Insulating gloves 1 pair
30 Slitting saw SATA 93414 1 pcs
31 Saw blade SATA 32 teeth 12 inches 93418 1 pcs
Comfortable anti-slide wear pair
32 Working gloves 2
resistant
33 Multimeter Fluke 1587 1 pcs
34 Sharp-nose pliers 1 pcs
35 Tool car 1 pcs
36 Angle scissor 1 pcs
37 Ceramic scraper 1 pcs
38 Working suit According to the students' situation 1 set
39 Baseball cap type safety 1 pcs

Ⅴ. Comprehensive training content


According to the project teaching, it mainly completes the training contents as follows::
1.Skill training of basic electrical installation
1)The practical training of installation tools
2)The practical training of measuring instruments
3)The practical training of processing PVC bending pipe by hand bending machine
4)PVC pipe laying fixing and its' accessories technology requirements training
5) PVC wire slot installation fixing and its accessories technology requirements training
6)Fixed training of sheath wire
7)Cutting pipe training of PVC pipe and metal pipe
8)Connection training of plastic wire tube and plastic junction box
9)Fixed clamp training
10)Ming pipe into the box Training
11)Bending and shaping training of ming tipe
12)Concealed fixed training of line pipe
13)Pre- embedded iron or expansion bolt training
14)Bridge, crane, and bracket installation training
15)Operation training of pipe threading
16)Single (multi) core copper and aluminum wire connection training
2.Indoor lighting and power distribution
1)One switch to control one lamp and socket
2)Two dual joint switches to control one lamp
3)Three switches to control one lamp
4)Air conditioning socket to control circuit
5)Digital segment switch to control lamp
3.Electrical control
1)Jog control circuit by asynchronous motor
2)Asynchronous motor self-locking control circuit
3)Asynchronous motor control circuit at two places
4)Sequence start of three phase asynchronous motor by hand
5)Asynchronous motor button Y-Δ control circuit
6)Asynchronous motor time relay Y-Δ control circuit
7)Rotating and counter-rotating control circuit of three phase asynchronous motor with button
interlocking
12/20

Subject: Electrical Installation Training System

No. DESCRIPTION

8)Rotating and counter-rotating control circuit of three phase asynchronous motor with
connector interlocking
9)Rotating and counter-rotating control circuit of three phase asynchronous motor with double
interlocking
10)Automatic back and forth control circuit
11)Rotating and counter-rotating point move and start control circuit
12)Automatic round trip control circuit with point motion
13)One way point move and start control circuit of asynchronous moto
14) KNX overall installation and wiring training
15) KNX Smart Panel Installation and wiring training
16) KNX binary output module installation and wiring training
17) KNX smart curtain controller and wiring installation training
18) KNX logic controllers and wiring installation training
19) KNX twelve into one sensor wiring installation training
20) KNX dimming module and wiring installation training
21) KNX communication connections training
22) KNX software training
23) KNX programming and programming methods training
24) KNX cognition and wiring of various components
13/20

Subject: Electrical Installation Training System

No. DESCRIPTION

Residential and Building Intelligent Control (KNX Technology)

I Overview
The company designed the intelligent building control training system that uses DL-KNX full digital distributed control
system within the region all types of lighting, air conditioning, curtains and other electrical equipment for automation
and centralized control management, energy monitoring, not only can effectively manage electrical equipment buildings,
provide flexible functions and effects, can also maintain and extend the life of the lamp and electrical equipment, to
achieve safety, energy conservation, humane, intelligent effects, and can easily use and be expanded according to the
needs of users. The training building intelligent control system, is a comprehensive training system for higher education
and vocational and technical education and development, applicable to all types of vocational schools (college) of
mechatronics, automation, and other professional teaching and engaged in related professional training technical
personnel. The system not only can be used as building automation and network of teaching and training systems, and
subsystems may also cooperate to form a network of residential and intelligent building classrooms.

II Technical parameter
1. Input power: single-phase three-wire AC220V ± 10% 50HZ
2. Working environment: Temperature -10 ? - + 40 ? Relative humidity <85% (25 ?) Altitude <4000m
3. Power control: automatic air switch off power supply, overcurrent protection, leakage protection devices
4. Output Power:
DC power supply: 24V / 3A, with a current-limiting short-circuit soft protection and self-recovery function.

III. Module Introduction

1. M/P03.2-4810 multifunctional smart panel


1) You can use the manual switch to control all of the
230V switch output terminal.
2) Operating voltage: 21-30V DC
3) Bus communication: KNX / EIB
4) Dynamic current: <10mA
5) Quiescent current; <6mA
14/20

Subject: Electrical Installation Training System

No. DESCRIPTION

2. M/R4.10.1-331 switch value output module


1) Operating voltage: 21-30VDC
2) Bus communication: KNX / EIB
3) Dynamic current: <15mA
4) Quiescent Current: <5mA
5) Dynamic power: <450mW
6) Static power consumption: <150mW
7) Output Current: 10A
8) Rated voltage: 250V AC

3. M/W02.10.1-231 Smart curtain controller


1) The output of all the blinds can be operated manually
using the keys with built-bus coupler
2) Operating voltage: 21-30V DC
3) Bus communication: KNX / EIB
4) Dynamic current: <12mA
5) Static current: <5mA
6) Dynamic power: <450mW
7) Static power consumption: <150mW
8) Output Current: 10A
9) Rated voltage: 250V AC output channels: 4 Relay / 2 channel

4. M/TM04.1-432 Logic Controller


1) Timer with 4 independent channels, embedded real-time clock
can run its own standard time, as the main clock or sub clock.
Master clock cycles to KNX / EIB bus transmit clock
information to achieve control of the agenda, and the child
receives the master clock in the clock information to achieve
synchronization, to achieve the same schedule control.
2) Operating voltage: DC21-30V
3) Communication: KNX / EIB
4) Bus power consumption: <10mA
5) Week schedule
6) Calendar days
7) Special Days
8) Switch control
9) Alarm Control
10) Scene control
11) Sequence control
12) Percentage control
13) Threshold control
14) Power-down recovery function

5. M / IS05.1 intelligent motion detection sensor


1) Logic input conditions: movement sensor, light sensor,
external condition input
2) With two logic: AND, OR
3) Five logic function modules, each module can be set to
10 logical target output
4) Master-slave mode single-loop control of the lamp
5) having a constant illumination function
6) Operating voltage: 21 ~ 30VDC
7) Communication: KNX / EIB
8) Dynamic power consumption: <6mA
9) Static power consumption: <5m
10) Sensing range: 8m (installation height 3m)
15/20

Subject: Electrical Installation Training System

No. DESCRIPTION

6. Power module M/P960.1


1) Input voltage: AC230V 50 / 60HZ
2) Bus output: DC30V
3) Bus communication: KNX / EIB
4) Providing current: 960mA
5) Loss: <2W
6) On power-up time: <1s

7. M/DL02.1-432 Dimming module


1) Rated voltage: AC 220 - 230V, 50 / 60Hz
2) Bus communication: KNX / EIB
3) Static current: <15mA
4) Cut off: pulse with a latching relay off
5) Analog dimming: 0-10V
6) Output Current: 10A / 1CH
7) Output channels: Channel 6

8. KNX / EIB M / PART.1 IP network


1) IP router is similar to TP coupling, except that the IP routers use Ethernet as the
main line of communication, can be used as KNX Ip interface to download data.
M / IPRT.1 is a routing device can be used as main lines and line coupler for
upstream KNXnet / IP line (trunk or main) and TP KNX bus (sub-line) downstream to
provide data exchange via ETS software data downloading and data monitoring.
M / IPIF.1 is an interface between devices, data monitoring and implement database
download via ETS software.
2) KNX Operating voltage: 21-30V DC
3) KNX operating power: 5mA
4) External power supply: DC 24V (DC 12-30V)
5) Power consumption: 520mW, max 800mW.
6) External Current: 190mA
7) Size: 70x36x90mm (L x W x H)
8) Protection grade: Ip20
9) Up to four connections, debug, and monitor data for the ETS or monitoring equipment
10) Through the LAN area and region to achieve rapid exchange of data packets
between lines, and the line area,
11) High-speed data cache, reliable data transmission and confirmation
This feature automatically exit
12) function key lets you temporarily cancel data filtering and screening, the set time is reached
13) Six two-color LED indicates the status of all communication

9. M / HSIU05.1.480 infrared ultrasonic sensors


1) Operating voltage: 21-30V DC
2) Dynamic Current: <15mA
3) Static Current: <6mA
4) Switch control
5) Absolute dimming control
6) Curtain control
7) Alarm Control
8) Percentage control
9) Control sequence
10) Scene control
16/20

Subject: Electrical Installation Training System

No. DESCRIPTION

10. RVV0.75 * 4 control cables


1) HDL Buspro / KNX / EIB quad shield cable is equipment dedicated
cable, use aluminum foil shielded twisted pair, as HDL Buspro Bus
and KNX / EIB bus, etc., wiring is simple and convenient.
2) the ability to transmit signals strong
3) Good resistance to interference
4) Cable Description: aluminum foil shielding, grounding
5) Impedance: 120 & Omega;
6) Copper Diameter: 0.75 ~ 0.85mm
7) Cable diameter: 7.0 ~ 8.0mm
8) Lead resistance (20 ): ℃ less than 35Ω / km
9) Insulation resistance (70 ℃): more than 5MΩ / km
10)Finished Withstand Voltage: AC 300V
11) Twisted shares: 40 / m
12) Twisted pair: 2 x dual-core conductors (twisted red and black,
white and yellow twisted pair)
13) Environmental conditions
14) Working temperature: -20 ℃ ~ 85 ℃ 16) Storage temperature: -40 ℃ ~ + 100 ℃
15) Operating Relative Humidity: 10% to 98% 17) Storage Relative Humidity: 10% to 98%

11. ETS software


ETS - Description
ETS (Engineering Tool Software) is the unique manufacturer independent Tool Software to design and configure
intelligent home and building control installations made with the KNX system.

Features:
ETS is truly unique: everywhere in the world, you may simply use one and the same ETS tool for every KNX project
and for every KNX certified device.
This installation tool is a de facto part of the KNX standard.
All product databases with certified products from all KNX manufacturers can be imported in ETS!

The KNX system together with ETS offers an easy to handle manufacturer independent toolbox for all planners
and installers.
17/20

Subject: Electrical Installation Training System

No. DESCRIPTION

V System configuration

NO. Name Specs QTY Unit


1 Multifunctional Smart Panel M/P03.2-4810 1 Set
2 4-way switch output module 10A M/R4.10.1-331 1 Set
3 1 way dimming controller 6A M/DL02.1-432
4 2-way smart curtain controller M/W02.10.1-231 1 Set
5 BUS power supply module M/P960.1 3 Set
6 IP network KNX/EIB M/IPRT.1 1 Set
7 Mobile sensor M/IS05.1 1 Set
8 Light sensor M/HSIU05.1.480 1 Set
9 Logic controller M/TM04.1 1 Set
10 Control cable RVVP0.75*4 3 m
11 Curtain 1 pc
12 software 1 pc

VI Training content
1. KNX overall installation and wiring training
2. KNX Smart Panel Installation and wiring training
3. KNX switch value output module installation and wiring training
4. KNX smart curtain controller and wiring installation training
5. KNX logic controllers and wiring installation training
6. KNX twelve in one sensor wiring installation training
7. KNX dimming module and wiring installation training
8. KNX communication connections training
9. KNX software training
10. KNX programming and programming methods training
11. KNX cognitive and wiring of various components
18/20

Subject: VRTEX® 360 SINGLE USER

Item Description

2 VIRTUAL REALITY WELDING TRAINING SIMULATOR

Features:
• Replicates proper machine set-up using a Welding Procedure
Specification. Students must select gas type, process, gas
flow, amperage/voltage and wire-feed speed in the system.
• Retractable SMAW stick stinger, GMAW/FCAW gun and GTAW
TIG torch, filler metal and adaptive foot pedal devices
realistically simulate the look, feel and action of actual
guns and torches
• Practice flat, horizontal, vertical and overhead 5G and
6G on mild steel, aluminum, stainless steel
• Extremely realistic weld puddle is visually and audibly
responsive to operator behavior, helping welders learn
when to adjust welding technique. Welding discontinuities
appear when improper technique is used.
• Simulates sparks, slag, grinding and weld cooling.
• Welding discontinuities appear when improper welding
technique is used
• Virtual bend test provides results instantly and reveals what causes a weld to pass or fail.
• Tracks and scores key weld parameters including work angle, travel angle, travel speed, distance and position
• Replay mode (in multiple views) helps instructors and welders identify what went wrong or well.
• SMAW and GMAW Welding Training Curriculum, Student Workbook, Instructor Guide

Processes:
• Simulated SMAW
• Simulated GTAW
• Simulated GMAW
• Simulated FCAW

Equipment Details:
Input Power: 230V/60Hz Single User
Input Current: 2A at 230
Net Weight: 950.00 (430.92 kg)
Dimensions:
Machine: 34.4H x 19.8W x 38.4D in. (874H x 503W x 975D mm)
Stand: 78.5H x 36W x 46.38D in. (1993.9H x 914.4W x 1178.1D mm)
19/20

Subject: Laboratory Training Equipment

No. Description

3 Advanced Process Welding Machine

Features:
• Automatically adjusts to input power from 200-600V, 50 or 60 Hz, single phase or three phase. Welding output
remains constant through the entire input voltage range.
• High power factor and efficiency
• Cloud based system to view or analyze welding data
• Compact and Durable Case
• Over 65 standard welding waveforms
• Standard Ethernet – Allows for effortless software upgrades

Equipment Details:
Input Power: 208/230/380/415/460/575/1/3/50/60
Rated Output: 350A/31.5V/40%
Input Current
3PH/40% - 39/35/19/17/14A
1PH/40% - 60/61/NA/NA/NA A
Output Range: 5-350A DC

Processes:
• Stick
•DC TIG
•Pulsed DC TIG
•MIG
•Pulsed MIG
•Flux-Cored

Includes:
• Advanced Process Welding Machine
•Wire Feeder
•.035 in. (0.9 mm) Drive Roll and Split Wire Guide Kit
•.040 - .045 in. (1.0 - 1.2 mm) Drive Roll and Split Wire Guide Kit
•Gun and Cable Package
•Work Lead and Wire Feeder Power Source Cables Package
•Inverter and Wire Feeder Cart
•Flowmeter and Regulator
•Arc Start Switch
•Advanced Module
□Provides multi-process reverse polarity (DC+), straight polarity (DC-), AC, high frequency TIG and STT
functionality.
□Integrated Control Cables
□Quick Lock Mounting System
□Ingress Protection Safety
□Power Source Output Pigtail Adapter Cable
□25 ft. (7.6 m) Remote Voltage Sense Lead
□ArcLink Output Receptacle
□Differential Input and Output
□Shielding Gas Input
•10 ft. (3.0 m) input power cord
•Portable Welding Fume Extractor
20/20

AFTER SALES SERVICE:


1 Free trainers' training at supplier's training center before the delivery of the equipment
upon delivery and installation
2 Free semi annual training with certification, on request
3 Free product inspection, on request
4 Free consultation / seminar, on request
5 Free product demonstration on selected item, on request

Terms and Condition:


Validity : 30 days
Payment : 50% Downpayment upon receipt of PO, 50% upon Delivery
Warranty : one year on parts; 2 years on service
Delivery : 150 days upon PO

We trust that we have given you our best offer. We look forward to receiving your valuable order soon.
Thank you very much.

S-ar putea să vă placă și