CALCULATION SUMMARY

Project Name : MOTOR PLAZA Project Location: ÁREA DE VENTAS

Drawing No. : MPT-ET1-PCI-PL-400-2 City: Lima, Peru

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft²) (gpm) (psi) (gpm/ft²) (psi) (gpm) # (gpm) (psi)

Required
AREA DE VENTAS Demand (HW) 1405.8 534.6 0.181 12 38.8 7 250 25.1
114.3

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR


Date 14/08/2019 PLAZA\MPT-ET1-PCI-CH-4100.tyc3
Page 1
Copyright © 2002-2012 Tyco Fire Protection Products
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : MOTOR PLAZA

Contract No. : MPT-ET1-PCI-PL-400-2 City: Lima, Peru

Project Location: ÁREA DE VENTAS Date: 12/07/2019

Contractor Information
Name of Contractor: P&R Arquitectos Consultores

Address: Salzillo 163 San Borja City: Lima, Perú

Phone Number: 225-0212 E-mail: contacto@pyrarquitectos.pe

Name of Designer: O. Ramón

Authority Having Jurisdiction: CGBVP

Design
Remote Area Name AREA DE VENTAS

Remote Area Location

Occupancy Classification

Density (gpm/ft²) 0.181

Area of Application (ft²) 1405.8

Coverage per Sprinkler (ft²) 214.3

Number of Calculated Sprinklers 7

In-Rack Demand (gpm) 0

Special Heads

Hose Streams (gpm) 250

Total Water Required (incl. Hose Streams) (gpm) 534.6

Required Pressure at Source (psi) 114.3

Type of System Wet

Volume - Entire System (gal) 3648.9 gal

Water Supply Information


Date DD/MM/YYYY

Location

Source W1

Notes

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR


PLAZA\MPT-ET1-PCI-CH-4100.tyc3
Date 14/08/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : MOTOR PLAZA Node Labels: Node Reference
Pipe Labels: Off

Diagram for Design Area : AREA DE VENTAS

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR PLAZA\MPT-ET1-PCI-CH-4100.tyc3


Date 14/08/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : MOTOR PLAZA

Hydraulic Analysis for : AREA DE VENTAS


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lb·s/ft²) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (gpm) Pressure (psi)


0 140.7
2000 125
3000 106

Supply Analysis
Residual Available
Static Pressure Flow Total Demand Required Pressure
Node at Source Pressure Pressure
(psi) (gpm) (gpm) (psi)
(psi) (psi)
W1 140.7 125 2000 139.3 534.6 114.3

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 250

Outside Hose Flow (gpm) 0

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm) 0

Total Hose Flow (gpm) 250

Sprinklers
Ovehead Sprinkler Flow (gpm) 284.6

InRack Sprinkler Flow (gpm) 0

Other (custom defined) Sprinkler Flow (gpm) 0

Total Sprinkler Flow (gpm) 284.6

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 114.3

W1 - Flow (gpm) 534.6

Demand w/o System Pump(s) N/A

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR


PLAZA\MPT-ET1-PCI-CH-4100.tyc3
Date 14/08/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : MOTOR PLAZA

Hydraulic Analysis for : AREA DE VENTAS

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR


Date 14/08/2019 PLAZA\MPT-ET1-PCI-CH-4100.tyc3 Page 5
Copyright © 2002-2012 Tyco Fire Protection Products
Job : MOTOR PLAZA

Hydraulic Analysis for : AREA DE VENTAS

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 140.7
S2 Supply point #2 2000 125
S3 Supply point #3 3000 106
D1 Elevation Pressure 0 15.1
D2 System Demand 534.6 114.3

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 139 603 25.1 534.6

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft²) (gpm/psi½) (gpm/ft²) (gpm) (psi) (gpm/ft²) (gpm) (psi)

Overhead
P1 214.3 11.2 0.181 64.3 12 0.222 47.6 18
Sprinkler

Overhead
P2 214.3 11.2 0.181 64.3 12 0.191 40.9 13.4
Sprinkler

Overhead
P3 214.3 11.2 0.181 64.3 12 0.234 50.2 20.1
Sprinkler

Overhead
P4 214.3 11.2 0.181 64.3 12 0.181 38.8 12
Sprinkler

Overhead
P5 120 5.6 0.15 18 10.3 0.159 19.1 11.6
Sprinkler

Overhead
P6 214.3 11.2 0.181 64.3 12 0.211 45.2 16.3
Sprinkler

Overhead
P7 214.3 11.2 0.181 64.3 12 0.2 42.9 14.7
Sprinkler

File: D:\PROYECTOS ORAMON\CÁLCULOS\MALL TRUJILLO - 228\MOTOR


PLAZA\MPT-ET1-PCI-CH-4100.tyc3
Date 14/08/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Job name: MOTOR PLAZA Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
P4 24.98 11.2 38.8 25 1x(us.90)=1.43 0.66 100 12
32 24.33 38.8 1.049 1.43 0.6201 0.3
2.08 1.3
32 24.33 0 32 1x(us.Tee-Br)=4.28 2.23 100 13.6
31 24.33 38.8 1.38 4.28 0.1631 0
6.51 1.1
31 24.33 19.1 32 1x(us.Tee-Br)=4.28 6.97 100 14.6
29 24.33 57.9 1.38 4.28 0.342 0
11.25 3.8
29 24.33 40.9 40 12.88 100 18.5
28 24.33 98.8 1.61 0 0.4347 0
12.88 5.6
28 24.33 88.1 50 1x(us.90)=3.56 4.17 100 24.1
27 24.33 186.9 2.067 3.56 0.4193 0
7.74 3.2
27 24.33 0 50 11.67 100 27.3
04 24.33 186.9 2.067 0 0.4193 0
11.67 4.9
04 24.33 97.7 65 1x(us.90)=4.28 147.85 100 32.2
05 24.33 284.6 2.469 4.28 0.3845 0
152.13 58.5
05 24.33 0 80 1x(us.90)=4.99 3.79 100 90.7
06 24.33 284.6 3.068 4.99 0.1335 0
8.78 1.2
06 24.33 0 80 1x(us.90)=4.99 0.39 100 91.9
07 24.33 284.6 3.068 4.99 0.1335 0
5.38 0.7
07 24.33 0 80 2 100 92.6
08 24.33 284.6 3.068 0 0.1335 0
2 0.3
08 24.33 250 100 1x(us.90)=7.13 28.59 100 92.9
10 -4.27 534.6 4.026 7.13 0.1142 12.4
35.72 4.1
10 -4.27 0 100 3.99 150 109.3
11 -4.27 534.6 4.5 0 0.0314 0
3.99 0.1
11 -4.27 0 100 20.55 150 109.5
12 -4.27 534.6 4.5 0 0.0314 0
20.55 0.6
12 -4.27 0 100 0.33 150 110.1
13 -3.94 534.6 4.5 0 0.0314 -0.1
0.33 0.0
13 -3.94 0 150 112.34 150 110
14 -3.94 534.6 6.625 0 0.0048 0
112.34 0.5
14 -3.94 0 150 83.12 150 110.5
15 -3.94 534.6 6.625 0 0.0048 0
83.12 0.4
15 -3.94 0 150 15.36 150 110.9
16 -3.94 534.6 6.625 0 0.0048 0
15.36 0.1
16 -3.94 0 250 76.48 150 111
17 -3.94 534.6 10.75 0 0.0005 0
76.48 0.0
17 -3.94 0 250 265.23 150 111
18 -3.94 534.6 10.75 0 0.0005 0
265.23 0.1

© 2006 National Fire Protection Association Page 7


Job name: MOTOR PLAZA Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
18 -3.94 0 250 175.88 150 111.1
19 -3.94 534.6 10.75 0 0.0005 0
175.88 0.1
19 -3.94 0 250 58.65 150 111.2
20 -3.94 534.6 10.75 0 0.0005 0
58.65 0.0
20 -3.94 0 250 52.04 150 111.2
21 -3.94 534.6 10.75 0 0.0005 0
52.04 0.0
21 -3.94 0 250 1x(us.90)=44.15 12.4 150 111.3
22 -3.94 534.6 10.75 44.15 0.0005 0
56.55 0.0
22 -3.94 0 200 1x(us.90)=12.83 2.3 100 111.3
23 -1.64 534.6 8.071 12.83 0.0039 -1
15.13 0.1
23 -1.64 0 200 1x(us.90)=12.83 28.13 100 110.4
24 -1.64 534.6 8.071 12.83 0.0039 0
40.97 0.2
24 -1.64 0 200 1x(us.90)=12.83 8.2 100 110.5
25 -9.84 534.6 8.071 12.83 0.0039 3.6
21.04 0.1
25 -9.84 0 200 1x(us.90)=12.83 4.94 100 114.2
26 -9.84 534.6 8.071 12.83 0.0039 0
17.77 0.1
26 -9.84 0 200 15.83 100 114.2
W1 -9.84 534.6 8.071 0 0.0039 0
15.83 0.1
P5 24.98 5.6 19.1 25 1x(us.90)=1.43 0.66 100 11.6
34 24.33 19.1 1.049 1.43 0.1665 0.3
2.08 0.3
34 24.33 0 25 1x(us.90)=1.43 1.76 100 12.2
33 24.33 19.1 1.049 1.43 0.1665 0
3.19 0.5
33 24.33 0 25 11.25 100 12.8
31 24.33 19.1 1.049 0 0.1665 0
11.25 1.9
P2 24.98 11.2 40.9 25 1x(us.90)=1.43 0.66 100 13.4
30 24.33 40.9 1.049 1.43 0.6844 0.3
2.08 1.4
30 24.33 0 32 19.01 100 15.1
29 24.33 40.9 1.38 0 0.18 0
19.01 3.4
P7 24.98 11.2 42.9 25 1x(us.90)=1.43 0.66 100 14.7
38 24.33 42.9 1.049 1.43 0.7468 0.3
2.08 1.6
38 24.33 0 32 1x(us.90)=2.14 1.87 100 16.5
37 24.33 42.9 1.38 2.14 0.1964 0
4 0.8
37 24.33 0 32 11.92 100 17.3
35 24.33 42.9 1.38 0 0.1964 0
11.92 2.3
35 24.33 45.2 40 1x(us.Tee-Br)=5.7 6.93 100 19.6
28 24.33 88.1 1.61 5.7 0.3517 0
12.63 4.4
P6 24.98 11.2 45.2 25 1x(us.90)=1.43 0.66 100 16.3
36 24.33 45.2 1.049 1.43 0.8237 0.3
2.08 1.7

© 2006 National Fire Protection Association Page 8


Job name: MOTOR PLAZA Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
36 24.33 0 32 1x(us.Tee-Br)=4.28 1.87 100 18.3
35 24.33 45.2 1.38 4.28 0.2166 0
6.14 1.3
P1 24.98 11.2 47.6 25 1x(us.90)=1.43 0.66 100 18
01 24.33 47.6 1.049 1.43 0.9044 0.3
2.08 1.9
01 24.33 0 32 18.29 100 20.2
02 24.33 47.6 1.38 0 0.2379 0
18.29 4.4
02 24.33 50.2 40 14.24 100 24.5
03 24.33 97.7 1.61 0 0.426 0
14.24 6.1
03 24.33 0 50 1x(us.Tee-Br)=7.13 5.55 100 30.6
04 24.33 97.7 2.067 7.13 0.1262 0
12.68 1.6
P3 24.98 11.2 50.2 25 1x(us.Tee-Br)=3.56 0.66 100 20.1
02 24.33 50.2 1.049 3.56 0.9976 0.3
4.22 4.2
his1 24.33 250 100 1x(us.Tee-Br)=14.26 1.88 100 92.4
08 24.33 250 4.026 14.26 0.028 0
16.14 0.5

* Discharge shown for flowing nodes only

© 2006 National Fire Protection Association Page 9

S-ar putea să vă placă și