Documente Academic
Documente Profesional
Documente Cultură
3TT/CC EM
2500 AF
B 2500AT B
CONTINUED IN SHEET # 2
MCP MCP MCP MCP MCP
100 AF 400 AF 30 AF 30 AF 150 AF 150 AF 150 AF 150 AF 150 AF 600 AF 100 AF 100 AF 30 AF 150 AF 150 AF
80AT 300AT 15 AT 15 AT 150AT 150AT 150AT 150AT 125 AT 450AT 90 AT 80 AT 15AT 150AT 150AT
4 1 4 4 1
C C
MM 200 MM 200 MM 200 MM 200 MM 200
3TC 3TC 3TC 3TC 3TC
50G 50G 50G 50G TO DCS TO DCS TO DCS TO DCS 50G 50G 50G 50G TO DCS 50G 50G
T.P.
1x1c # 2/0 AWG PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP
1 × (3c # 8 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
2610DX101-F01\1 [...]
2831CH252SW-F01
2831CH250SW-F01
2610UP250-F01
2610DX551-F01
2610UP251-F01
2610JX501-F01
2610BC501-F01
2610LX561-F01
D D
2831-CH-252-SW
2831-CH-250-SW
2610-BC-501
2610-UP-250 300 kVA 50 kVA 45 kVA 75 kVA 2610-UP-251
40 kVA 15 kVA
2 x (3 x 1/c 350 kcmil) + G - 1000 V
1 × (4c # 4 AWG + G) - 1 kV
1 × (3c # 8 AWG + G) - 1 kV
1 × (3c # 8 AWG + G) - 1 kV
1 × (3c # 8 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
1 × (3c # 2 AWG + G) - 1 kV
2610TM00401A-F01\1 [...]
2610TM00501A-F01\1 [...]
2610DP101-F01\1 [...]
2831ZM022-F01\1\2
E E
2831PP187A-F01
2831PP186A-F01
2610FA251A-F01
2831CH252-F01
2831CH250-F01
2610JP250-F01
2610JP251-F01
2610DP581-F01
2610DP551-F01
2610JP401-F01
2610BA501-F01
2610LP561-F01
50 Ah
M M M M M
ELECTRICAL MOTOR
2610-TM-004-01A
2610-TM-005-01A
2831-PP-187A
2831-PP-186A
2610-FA-251A
2831-ZM-022
2831-CH-252
VALVES HOIST
VALVES HOIST
2831-CH-250
2610-JP-250
2610-DP-581
2610-JP-251
2610-DP-551
2610-JP-401
2610-BA-501
2610-LP-561
2610-DP-101
1) THE SIZES OF MCP, MCCB AND CONTROL TRANSFORMERS WILL BE DEFINED BY THE MCC PROVIDER (GENERAL ELECTRIC.)
2) L.V STARTER FOR SIZE NEMA 5 AND ABOVE SHOULD BE OF THE VACUUM TYPE.
3) CABLES DESIGN (SIZE AND FORMATION), SUPPLIED, CONNECTED AND TESTED BY THE SUPPLIER OF THE ELECTRICAL
ROOM (GENERAL ELECTRIC)
.4) THIS DRAWING CONSIDERED ELECTRICAL LOADS FROM THE MECHANICAL EQUIPMENT LIST REV.1 (20-05-19). MINERA SPENCE S.A.
.5) PROFIBUS-DP NETWORK O SEGMENT WITH DAISY CHAIN CONNECTION.
6) THE INFORMATION CONTAINED IN THIS DRAWING IS RELATED TO NOVATED PAR P N^6-0007-WP02-RP -
SCALE DATE SCALE DATE SGO PROJECT
"ELECTRICALS ROOMS"
7) ALL VARIABLE SPEED DRIVES (AF) HAVE PROFIBUS DP COMMUNICATION TO DCS (SCOPE G.E.) DESIGNED DRAWN
ENGINEERING
BY: H. GUZMAN BY: H. GUZMAN
8) THIS DRAWING CONTAINS THE INFORMATION REQUIRED FOR THE SUPPLIER OF THE ELECTRICAL ROOMS (GENERAL MOTOR CONTROL CENTER
1 8/29/2019 ISSUED APPROVED FOR CONSTRCTION A.D. J.R. R.O. REVISED DISCIPLINE
E. FREDES
ELECTRIC) TO EXECUTE THE SUPPLIES AND ON SITES, INDICATED IN SCOPE OF WORK 4-V2-2000-EL-SOW-000003. BY: R. ORTEGA LEAD:
2610-MC-501
0 10/5/2018 ISSUED APPROVED FOR CONSTRCTION J.V. H.G. R.O.
9) THE QUANTITIES AND TYPES OF SPARES AND SPACES AVAILABLE IN THE MOTOR CONTROL CENTER WILL BE INDICATED ENGINEERING MGR: C. LEGGETT PROJECT MGR: A. KING
B 12/19/2017 ISSUED FOR INTERNAL APROVAL H.G. R.O. E.F. IN THE AS-BUILT DRAWINGS OF THE SUPPLIER OF THE ELECTRICAL ROOMS (GE), ACCORDING TO THE SCOPE OF WORK BHPB ENGINEERING MGR: PROJECT MGR: SINGLE LINE DIAGRAM
A 12/4/2017 ISSUED FOR INTERNAL REVIEW H.G. R.O. E.F. 4-V2-2000-EL-SOW-000003.
VENDOR DRAWING N° : CONTRACT N°: BHP DRAWING N° REV.
No. DATE REVISION DIS. REV. L.D BHPB REFERENCE DOCUMENT N° BHPB NOTES 4-V2-2610-EL-ESS-0011301 4-V2-2610-EL-ESS-001301 1
Sheet Of
1 3
1 2 3 4 5 6 7 8 9 10
A A
ELECTRICAL ROOM
2610-ER-001
Motor Control Center
2610-MC-501
CONTINUED IN SHEET # 3
MCP MCP MCP MCP MCP MCP MCP MCP MCP MCP MCP MCP MCP
FROM SHEET # 1
3 3 1 1 2 2 1 1 1 1 1 5 5
MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200 MM 200
3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC 3TC
TO DCS TO DCS TO DCS 50G 50G TO DCS TO DCS TO DCS TO DCS TO DCS TO DCS TO DCS TO DCS TO DCS TO DCS
C PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP PROFIBUS DP C
1 × (3c # 4 AWG + G) - 1 kV
2610SA046JB-F01
2831PP252A-F01
2831PP253A-F01
D D
2831-PP-252A-JB
2831-PP-253A-JB
2610-SA-046-JB
1 × (3c # 4/0 AWG + G) -1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 12 AWG + G) - 1 kV
1 × (3c # 10 AWG + G) - 1 kV
1 × (3c # 8 AWG + G) - 1 kV
1 × (3c # 6 AWG + G) - 1 kV
1 × (3c # 4 AWG + G) - 1 kV
2610PP03201HU01PP1-F01
2610PP03201HU01FA1-F01
2610PP03101HU01PP1-F01
2610PP03101HU01FA1-F01
2610TM00401HE1-F01
2610TM00501HE1-F01
2610TH00401A-F01
2610TH00501A-F01
2610SA04605-F01
2831PP252A-F02
2831PP253A-F02
2610FA252A-F01
2210PP350A-F01
2210PP351A-F01
2831ZM025-F01
2610SA046-F01
E E
M M M M M M M M M M M
F F
TAILINGS THICKENER N°2 TUNNEL VENTILATION
TAILINGS THICKENER N°2 FORCED DILUTION
TAILINGS THICKENER N°1 FORCED DILUTION
2610-PP-032-01HU01PP1A
2610-PP-032-01HU01FA1A
2610-PP-031-01HU01PP1A
2610-PP-031-01HU01FA1A
HYDRAULIC UNIT HEATER
CLEANING SYSTEM 1
ELECTRICAL MOTOR
ELECTRICAL MOTOR
2610-TH-004-01A
2610-TH-005-01A
2610-SA-046-05
PROBE ANALYZER
2610-FA-252A
2831-PP-252A
2210-PP-350A
2831-PP-253A
2210-PP-351A
2831-ZM-025
2610-SA-046
1) THE SIZES OF MCP, MCCB AND CONTROL TRANSFORMERS WILL BE DEFINED BY THE MCC PROVIDER (GENERAL ELECTRIC.)
2) L.V STARTER FOR SIZE NEMA 5 AND ABOVE SHOULD BE OF THE VACUUM TYPE.
3) CABLES DESIGN (SIZE AND FORMATION), SUPPLIED, CONNECTED AND TESTED BY THE SUPPLIER OF THE ELECTRICAL MINERA SPENCE S.A.
ROOM (GENERAL ELECTRIC)
.4) THIS DRAWING CONSIDERED ELECTRICAL LOADS FROM THE MECHANICAL EQUIPMENT LIST REV.1 (20-05-19).
.5) PROFIBUS-DP NETWORK O SEGMENT WITH DAISY CHAIN CONNECTION.
SCALE DATE SCALE DATE SGO PROJECT
6) THE INFORMATION CONTAINED IN THIS DRAWING IS RELATED TO NOVATED PAR P N^6-0007-WP02-RP -
DESIGNED DRAWN
ENGINEERING
BY: H. GUZMAN BY: H. GUZMAN
"ELECTRICALS ROOMS" MOTOR CONTROL CENTER
1 8/29/2019 ISSUED APPROVED FOR CONSTRCTION A.D. J.R. R.O. REVISED DISCIPLINE
E. FREDES
7) ALL VARIABLE SPEED DRIVES (AF) HAVE PROFIBUS DP COMMUNICATION TO DCS (SCOPE G.E.) BY: R. ORTEGA LEAD:
2610-MC-501
10/5/2018 ISSUED APPROVED FOR CONSTRCTION J.V. H.G. R.O.
0 8) THIS DRAWING CONTAINS THE INFORMATION REQUIRED FOR THE SUPPLIER OF THE ELECTRICAL ROOMS (GENERAL ENGINEERING MGR: C. LEGGETT PROJECT MGR: A. KING
B 12/19/2017 ISSUED FOR INTERNAL APROVAL H.G. R.O. E.F. ELECTRIC) TO EXECUTE THE SUPPLIES AND ON SITES, INDICATED IN SCOPE OF WORK 4-V2-2000-EL-SOW-000003.
9) THE QUANTITIES AND TYPES OF SPARES AND SPACES AVAILABLE IN THE MOTOR CONTROL CENTER WILL BE INDICATED
BHPB ENGINEERING MGR: PROJECT MGR: SINGLE LINE DIAGRAM
A 12/4/2017 ISSUED FOR INTERNAL REVIEW H.G. R.O. E.F.
IN THE AS-BUILT DRAWINGS OF THE SUPPLIER OF THE ELECTRICAL ROOMS (GE), ACCORDING TO THE SCOPE OF WORK VENDOR DRAWING N° : CONTRACT N°: BHP DRAWING N° REV.
No. DATE REVISION DIS. REV. L.D BHPB REFERENCE DOCUMENT N° BHPB
4-V2-2000-EL-SOW-000003. NOTES 4-V2-2610-EL-ESS-0011301 4-V2-2610-EL-ESS-001301 1
Sheet Of
2 3
1 2 3 4 5 6 7 8 9 10
A ELECTRICAL ROOM A
2610-ER-001
Motor Control Center
2610-MC-501
5 1 1 1
D D
3 x 1/c 500 kcmil + G - 1 kV
SPARE FEEDER
SPARE FEEDER
SPARE FEEDER
E E
93 kW
F F
FEED PUMP - ELECTRICAL MOTOR (STANDBY)
GMD COOLING SYSTEM HEAT EXCHANGER
2210-PP-352A
1) THE SIZES OF MCP, MCCB AND CONTROL TRANSFORMERS WILL BE DEFINED BY THE MCC PROVIDER (GENERAL ELECTRIC.)
2) L.V STARTER FOR SIZE NEMA 5 AND ABOVE SHOULD BE OF THE VACUUM TYPE.
3) CABLES DESIGN (SIZE AND FORMATION), SUPPLIED, CONNECTED AND TESTED BY THE SUPPLIER OF THE ELECTRICAL
ROOM (GENERAL ELECTRIC)
.4) THIS DRAWING CONSIDERED ELECTRICAL LOADS FROM THE MECHANICAL EQUIPMENT LIST REV.1 (20-05-19). MINERA SPENCE S.A.
.5) PROFIBUS-DP NETWORK O SEGMENT WITH DAISY CHAIN CONNECTION.
6) THE INFORMATION CONTAINED IN THIS DRAWING IS RELATED TO NOVATED PAR P N^6-0007-WP02-RP -
SCALE DATE SCALE DATE SGO PROJECT
"ELECTRICALS ROOMS"
7) ALL VARIABLE SPEED DRIVES (AF) HAVE PROFIBUS DP COMMUNICATION TO DCS (SCOPE G.E.) DESIGNED DRAWN
ENGINEERING
BY: H. GUZMAN BY: H. GUZMAN
8) THIS DRAWING CONTAINS THE INFORMATION REQUIRED FOR THE SUPPLIER OF THE ELECTRICAL ROOMS (GENERAL MOTOR CONTROL CENTER
1 8/29/2019 ISSUED APPROVED FOR CONSTRCTION A.D. J.R. R.O. REVISED DISCIPLINE
E. FREDES
ELECTRIC) TO EXECUTE THE SUPPLIES AND ON SITES, INDICATED IN SCOPE OF WORK 4-V2-2000-EL-SOW-000003. BY: R. ORTEGA LEAD:
2610-MC-501
0 10/5/2018 ISSUED APPROVED FOR CONSTRCTION J.V. H.G. R.O.
9) THE QUANTITIES AND TYPES OF SPARES AND SPACES AVAILABLE IN THE MOTOR CONTROL CENTER WILL BE INDICATED ENGINEERING MGR: C. LEGGETT PROJECT MGR: A. KING
B 12/19/2017 ISSUED FOR INTERNAL APROVAL H.G. R.O. E.F. IN THE AS-BUILT DRAWINGS OF THE SUPPLIER OF THE ELECTRICAL ROOMS (GE), ACCORDING TO THE SCOPE OF WORK BHPB ENGINEERING MGR: PROJECT MGR: SINGLE LINE DIAGRAM
A 12/4/2017 ISSUED FOR INTERNAL REVIEW H.G. R.O. E.F. 4-V2-2000-EL-SOW-000003.
VENDOR DRAWING N° : CONTRACT N°: BHP DRAWING N° REV.
No. DATE REVISION DIS. REV. L.D BHPB REFERENCE DOCUMENT N° BHPB NOTES 4-V2-2610-EL-ESS-0011301 4-V2-2610-EL-ESS-001301 1
Sheet Of
3 3