EASTERN POWER DISTRIBUTION COMPANY OF A.P.

LIMITED
Operation DIVISION :: ANAKAPALLI

Newly charged Substations/Augmentation of Sub Stations for the month of August - 2019

Voltage Level
Name of the
S.No Section (220/132 or 132/33 PTR Capacity
Substation
or 33/11KV)

- NIL -
COMPANY OF A.P. LIMITED
ANAKAPALLI

of August - 2019

Load on the PTR in Date of


Incoming feeder
MW Charging
EASTERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED
Operation DIVISION :: ANAKAPALLI

Newly charged feeders/Bifurcated Feeders for the month of August - 2019

Voltage Level
Name of the Feeder Emanating
S.No Section (220KV/132KV/33
feeder code Substation
KV/11KV)

- NIL -
COMPANY OF A.P. LIMITED
ANAKAPALLI

Type of the feeder Load in MW Date of charging

- NIL -
EASTERN POWER DISTRIBUTION COMPANY OF A.P. LIMIT
Operation DIVISION :: ANAKAPALLI

Details of Enhancement of Transformers for the month of A

S. Capacity in DTR Serial Type


Section Make Location
No KVA No (CON/CSP)

1 koruprolu NIL
ON COMPANY OF A.P. LIMITED
N :: ANAKAPALLI

mers for the month of August - 2019

Date of Structure Name of the Old DTR


Urban/Rural
Charging Code 11KV Feeder Capacity
EASTERN POWER DISTRIBUTION COMPANY OF
Operation DIVISION :: ANAKAPALL

Sl. No
Name
Sl. No of the Length of line in KM
section
LT 3 Ph LT 3 Ph LT S Ph LT S Ph
33KV 11KV 6.3KV
5W 4W 3W 2W

1 Koruprolu 34 134.7 763.75 4.8 55 15.6 0


STRIBUTION COMPANY OF A.P. LIMITED
n DIVISION :: ANAKAPALLI

Charged during August - 2019

Length of line in KM

LT AB LT 3 Ph LT 3 Ph LT S Ph LT S Ph LT AB
33KV 11KV 6.3KV
Cable 5W 4W 3W 2W Cable

31.2 0 0 0 0 0 0 0 0
Existing as on end of the August - 2019

Length of line in KM

LT 3 Ph LT 3 Ph LT S Ph LT S Ph LT AB
33KV 11KV 6.3KV
5W 4W 3W 2W Cable

34 134.7 763.75 4.8 55 15.6 0 31.2


EASTERN POWER DISTRIBUTION COMPANY OF A.
Operation DIVISION :: ANAKAPALLI
Stuck-up Meters for the Month Aug - 2019
Meters Stuck-up at the beginning of the Meters found stuckup during the month
Sl.No Section month as on Aug - 2019 Aug - 2019
S ph 3 ph S ph
1 Koruprolu 89 1 89
TOTAL :- 89 1 89
Burnt Meters for the Month Aug - 2019
Meters Burnt at the beginning of the Meters found Burnt during the month
Sl.No Section month as on Aug - 2019 Aug - 2019
S ph 3 ph S ph
1 Koruprolu 15 0 15
TOTAL :- 15 0 15
N POWER DISTRIBUTION COMPANY OF A.P.LIMITED
Operation DIVISION :: ANAKAPALLI

ound stuckup during the month Meters replaced during the month Aug- Balance meters to be replaced at the
Aug - 2019 2018 end of the month as on 25.08.2019
3 ph S ph 3 ph S ph 3 ph
1 89 1 0 0
1 89 1 0 0

found Burnt during the month Meters replaced during the month Aug Balance meters to be replaced at the
Aug - 2019 - 2019 end of the month as on 25.08.2019
3 ph S ph 3 ph S ph 3 ph
0 15 0 0 0
0 15 0 0 0
EASTERN POWER DISTRIBUTION COMPANY OF A
Operation DIVISION :: ANAKAPALLI
33/11 KV Substations' Loads for the month of Au

Aggregat
No of PTRs Date of 33 KV
Sl. e 11KV Bus
Name of the Sub-station PTRs Existing Commissioning Bus
No. Capacity Voltage
Existing (No.xMVA) of Sub-station Voltage
(MVA)

1 33/11 KV Darlapudi SS 1 1x5 MVA 5 08-03-1995 33kv 11kv

2 33/11KV S.Rayavaram 2 2x5 MVA 10 20-12-2003 33kv 11kv

3 33/11 KV Koruprolu SS 2 2x5 MVA 10 29-11-1963 33kv 11kv


33/11KV Penugollu
4 1 1x5 MVA 5 24.04.2009 33kv 11kv
Dharmavaram SS
33/11KV Pedagumuluru
4 1 1x5 MVA 5 09.01.18 33kv 11kv
SS
TRIBUTION COMPANY OF A.P.LIMITED
DIVISION :: ANAKAPALLI
Loads for the month of August - 2019
SS LV-1 LV-2

Avg. Load MD Avg. Load MD Avg. Load MD


Date of Date of Date of
of SS for Reached of LV-1 for Reached of LV-2 for Reached
Occurren Occurren Occurren
Current so far Current so far Current so far
ce of Max ce of Max ce of Max
Month during FY Month during FY Month during FY
Demand Demand Demand
(MW) (MW) (MW) (MW) (MW) (MW)

1.90 2.53 9.03.09 1.90 2.53 9.03.09

1.86 4.62 25.04.09 1.86 3.67 13.09.08 0.88 19 11.08.10

1.95 4.23 09.06.10 1.95 2.53 15.05.09 1.00 2.07 9.06.10

1.35 1.3 31.07.09 1.35 1.3 31.07.09


EASTERN POWER DISTRIBUTION COMPANY OF A.P.LIMITED
OPERATION DIVISION : ANAKAPALLI
33KV Feeders' Loads for the month of August - 2019
MD
Avg. Load
Sl.N Reached so
Name of the Division Name of the EHT SS Feeder No Name of the 33 KV feeder for Current
o. far during
Month (MW)
FY (MW)
1 Anakapalle 132/33 KV KORUPROLU 1 Koruprolu 2.2 10
2 Anakapalle 132/33 KV KORUPROLU 2 P.R.Peta 9.0 9
3 Anakapalle 132/33 KV KORUPROLU 3 Hetero Drugs 5.0 5
D

Date of
Occurrence of
Max Demand

03.1.11
12.02.11
20.04.2011
EASTERN POWER DISTRIBUTION COMPANY
OPERATION DIVISION : ANAKAP
11KV Feeders' Loads for the month of A

S. Name of Name of the


Divisio Name of the
N Section Sub division the132/33KV 33 KV
n 33/11 KV SS
o SS feeder

132/33 KV 52) 33/11 KV


1 Koruprolu Yelamanchili AKP
KORUPROLU Narsipatnam Darlapudi

132/33 KV
2 Koruprolu Yelamanchili AKP
KORUPROLU

132/33 KV
3 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV 33/11 KV
4 Koruprolu Yelamanchili AKP
KORUPROLU S.Rayavaram
132/33 KV
5 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
6 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
7 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
8 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV 33/11 KV
9 Koruprolu Yelamanchili AKP
KORUPROLU
54)Koruprolu
Koruprolu
132/33 KV
10 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
11 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
12 Koruprolu Yelamanchili AKP
KORUPROLU
132/33 KV
13 Koruprolu Yelamanchili AKP
KORUPROLU
Stand by to
132/33 KV
14 Koruprolu Yelamanchili AKP
P.R.PETA
59)Koruprolu 33/11KV
Koruprolu
59) 33/11KV
132/33 KV
15 Koruprolu Yelamanchili AKP
Koruprolu
P.Dharmavara P.Dharmavara
m m
132/33 KV
16 Koruprolu Yelamanchili AKP
Koruprolu
132/33 KV
17 Koruprolu Yelamanchili AKP
Koruprolu
132/33 KV
18 Koruprolu Yelamanchili AKP
Koruprolu
132/33 KV 33/11KV
Koruprolu Yelamanchili AKP Narsipatnam
Koruprolu Pedagumuluru
132/33 KV
Koruprolu Yelamanchili AKP
Koruprolu
132/33 KV
Koruprolu Yelamanchili AKP
Koruprolu
TION COMPANY OF A.P.LIMITED
SION : ANAKAPALLI
r the month of August - 2019
Avg. MD
Date of
Load Reache
Type of Occurre
Feeder for d so far
11KV Feeder Name the nce of
Code Current during
feeder Max
Month FY
Demand
(MW) (MW)

1)Darlapudi 3332213 Rural 26 1.417 9/3/2008

2)Darlapudi-Sugar Industrial
3332214 14 0.778 9/21/2008
Factory Dedicated

3)Chinagumulooru Water Water


3332216 20 0.650 9/1/2008
works Works
4)Yetikoppaka 3332215 AGL 75 0.650 9/1/2008

5)Peravanipalem 3332217 AGL 20 0.650 9/1/2008

1)S.Rayavaram MHQ 3332317 MHQ 29 0.850 9/29/2008

2)S.Rayavaram Rural 3332318 AGL 58 1.583 9/27/2008

3)Dharmavaram 3332320 AGL 31 1.133 18.05.09

4) Regupalem 3332321 Rural 41 1.083 9/12/2008

5)Pulaparthi 3332319 AGL 50 1.250 9/15/2008

1)Vommavaram 3332112 AGL 53 1.600 17.06.09

2)TA Road 3332108 Rural 28 0.700 18.06.09

3)Gudivada 3332110 Rural 99 1.450 19.06.09


4)Somudevapalli Water Water
3332111 32 0.283 9/12/2008
Works Works
5)Pedagumulooru 3332109 Rural 27 1.167 15.06.09

1) Dharmavaram Rural Rural 63 0.817 31.07.09

Water
2) Dharmavaram RWS 2 0.083 31.07.09
Works
3) Geddapalem Rural 29 0.450 31.07.09

3) Dedicated Rural 25 0.450 31.07.09

1) pedagumuluru Town

2) Chinagumulruru Rural

3) Gokulpadu Agl
DTRs existing at the beginning of the month
Name of the
S.No. 15 KVA 15 KVA
Section 16 KVA 25 KVA 40 KVA 50 KVA 63 KVA 75 KVA
(1PH) (3PH)

288 0 212 261 23 2 57 1


1 Koruprolu
Details of DTRs Existing and Newly charged during the month Aug - 2019

month DTRs charged during the month

15 KVA 15 KVA
100 KVA 160 KVA 315 KVA 16 KVA 25 KVA 40 KVA 50KVA 63 KVA
(1PH) (3PH)

105 3 0 0 0 0 0 0 0 0
g the month DTRs existing at the end of the Month

15 KVA 15 KVA
75KVA 100 KVA 160 KVA 315 KVA 16 KVA 25 KVA 40 KVA 50KVA
(1PH) (3PH)

0 0 0 0 288 0 212 261 23 2


g at the end of the Month

63 KVA 75KVA 100 KVA 160 KVA 315 KVA


Total

57 1 105 3 0 952
Details of Failed

DTRs failed at the beginning of the month Aug-2019


Name of the
S.No. section
15 KVA 16 KVA 25 KVA 40 KVA 50 KVA 63 KVA 100 KVA

1 Koruprolu 2 0 0 0 0 0 0
Details of Failed DTRs during the month of Aug- 2019

h Aug-2019 DTRs failed during the month Aug -2019

160 KVA 315 KVA 15 KVA 16 KVA 25 KVA 40 KVA 50 KVA 63 KVA 100 KVA

0 0 2 0 0 0 0 0 0
nth Aug -2019 DTRs failed at the end of th

160 KVA 315 KVA 15 KVA 16 KVA 25 KVA

0 0 0 0 0

Details o

SNO

2
DTRs failed at the end of the Month Aug -2019

40 KVA 50 KVA 63 KVA 100 KVA 160 KVA 315 KVA

0 0 0 0 0 0

Details of CSC Complaints

Registration
SECTION Complaint No Capacity Date and time

15KVA
KORUPROLU 1908135701 CONVENTIONAL 8/13/2019 16:27

15KVA
KORUPROLU 1908195322 CONVENTIONAL 8/19/2019 11:39