Issued

SPOT WORK SPECIFICATION-REPORT Date: …./…./……...


Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

A. Work Preview:

1. Title: Coke Oven Storage High Availability Repair and Virtualization Documentation

2. Period/Work schedule: (1week/2016 Oct 4 – Oct 11)

3. Background/Work purpose: To repair the storage automatic failover (tested fail on Aug 9) and
repair vcenter inaccesibility problem

4. Phenomena/Current Status:

a. Vcenter weblogin inaccessible


b. Storage failover failed , one storage fail whole system failed
c. VMware error post hardware cold booting

B. Work Target:

1. Work object :

Coke Oven Plant Process Computer Server. Vcenter server appliance web login and storage
cluster

2. Picture (left vcenter problem, right Storage automatic failover problem error log)
Error message
The quorum communication status for manager
"storage02.supracok.priv' in management group is down
manager storage02.supracok.priv cannot communicate with
storage01.supracok.priv

C. Work Scope:

1. Work scope:

a. Troubleshooting

Find problem cause of mentioned problems on work content (see page 2), repair and report

|Page 1
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

b. Test and Documentation

Test mentioned items, document the sequences , failure finding and providing solution
within the documentation

c. Documentation

Create documentation based on required information on work content , the content must be
current configuration and procedure to create the same configuration

d. Training and Document verification

Training based on troubleshooting, test and documentation result

Discussion to verify the document acceptance

2. Work Content/Description:

a. Troubleshooting :

 Reparation of Vcenter Server Appliance Weblogin (inaccessible problem) and verify


the result.

 Reparation of Storage automatic failover failure (proposed method : relocate FOM


from cluster storage to new designated location) and verify the result

b. Test & Documentation:

 Onsite Test Host Failover (Host #1 to Host #2 vice versa) : test method & result,
bug/error report and long term and short term solution

 Onsite Test Host and storage cold booting vice versa: sequences documentation,
error/bug report and short term & long term solution.

c. Documentation :

Hardware

 General hardware and software integration drawing and functional description

|Page 2
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

 General Hardware integration network cabling drawing with functional description


 Hardware multipathing and minimum connection based on drawing on no. 2
 Full backup /restore method and procedure for capturing each hardware data, virtual
machine & configuration (servers and storages) to same specification or different
devices (storage/server)
 Host / Server with Esxi:
1) Host server Raid configuration, logical disk space and maximum hard disk fault
tolerance
2) Host network configuration : IP, current NIC connection , fault tolerance and
functional description
3) Integration configuration method and procedure between host 1 & host 2
4) Integration configuration method and procedure between hosts and storages
 Storage :
1) Storage harddisk raid configuration & maximum harddrive fault tolerance
2) Storage network raid, mirroring configuration & maximum failed storage fault
tolerance
3) Cluster configuration with procedure & current cluster logical disks space
4) Storage network configuration : IP address and NIC connection
5) Data availability protection method if one storage failure based on current
configuration analysis
 Hardware replacement requirement (Hardware replacement rule):
1) Possibility to replace existing server and storage if one of the server/ storage
broken with different type of server/ storage sets.
2) The restriction of purchasing new hardware to be interoperability with current
system specification (processor, ram, device generations)
3) Adding new storage to storage cluster procedure in case one storage broken
4) Adding new server to host cluster procedure in case one server broken
Software

|Page 3
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

 ESXI :
1) Manual Installation/deployment on new servers
2) Network component (IP, DNS, Hostname, VMNIC) and functional description
related to virtualization
 Storage Lefthand OS :
1) Component configuration (TCP/IP setting, Network TCP status, Configuration
management) and functional description related to cluster and management group

 Vcenter Server Appliance:


1) Installation manual until vcenter running as management VM
2) Network configuration
 Vsphere Client :
1) Hosts clustering configuration procedure
2) Virtual storage implementation & deployment procedure, storage adapter
configuration
3) Vsphere Host Network Configuration: V-IP, VM-NIC, V-Switch
4) Vsphere host DNS & routing configuration
5) Vsphere HA Current Configuration and configuration Procedure
6) Vsphere Virtual Machine Backup and Restore Method and Procedure For Windows
or Non Windows based VM

 HP Store Virtual Centralized Management Console :


1) Creating Storage Management Group
2) Add/remove regular manager from management group
3) Add/remove specialized manager from management group (FOM)
4) Volume creation , provisioning , consumed space, logical space, data protection
functional description and current configuration
 Planning and Budgeting of Non Virtual Server of Krakatau Posco Data
|Page 4
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

Center:
1) Provide calculation of budget required to virtualize PTKP Data Center
2) Provide minimum Specs of hardware (server, storage, network) and software
(VMware, Esxi) to provide a full virtualization and automatic fault tolerance
3) Provide procedure to do virtualization of non-virtual server
4) Provide requirements and system restriction to do virtualization of non-virtual
server
d. Training and Document Verification:

1. Verify the documentation and training for 3 days duration (08.00 – 17.00)

2. Training content based on procedure, test result, troubleshooting and problem


solving method given on documentation

D. Required Resources:

1. Tools : Computer with software that able to do data gathering from vmware appliances /
camera and usb

2. Manpower: Prepared by vendor by considering time schedule.

|Page 5
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

E. Required Cost:

1. Estimated Cost :

Description Price
No. Unit Q'ty
(all items refer to work content page 2) Unit Total

1 Troubleshooting Lot

2 Testing Lot

3 Documentation Lot

4 Training In Class Day

General Condition TOTAL AMOUNT

■ Warranty : 1 Year (only for Vcenter web login and storage) PPN 10%

GRAND TOTAL

2. Budget source :

3. Relevant Price Quotation No.:

F. Contract Method:

1. Eligible Company : Must have legal partnership with vmware Indonesia with minimum
professional partnership level .

2. Limited bidding to company with minimum professional partnership level with VMware:

 aaaa

|Page 6
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

G. Work Requirements:

1. Work Management:

All working step and progress should be documented in English and final documentation and
troubleshooting result must be reported to EIC Technology and approved by EIC Technology.

2. Inspection/Testing method : (discuss with EIC Technology)

3. Quality requirement: Vmware weblogin must be accessible, storage failover feature must be
activated with dorcumentation approved by EIC technology after discussion with vendor with
related documents

4. Performance Guarantee: For 1 year after the repair of this vcenter weblogin and storage
failover. the performing company is responsible for functional and performance of vcenter
weblogin and storage failover feature

5. Safety & Environment Management: TBM before works, all workers must use any safety
equipment necessary for the work (full responsibility by the vendor).

6. General condition, etc.:

a. Works acceptance and test should be submitted in the end of works using english.

b. Works complete date is approved documentation.

c. Any matter needed for the perfection of the works but not mention here should be included
with the discussion with PT KP (EIC Technology).

Collaborative in checked and reviewed by:

Scheduler Tech. Engineer

|Page 7
Issued
SPOT WORK SPECIFICATION-REPORT Date: …./…./……...
Maintenance Planning Team, Facility Technology Department
No. : MP.SR/2016/SCH-…/00…..

Department/Team Requestor/User: Relevant WO No.:

Facility Technology/EIC Technology/Nathanael Leon Gozali


(nathanael@krakatauposco.co.id) Condition Type: Emergency

Sugeng S Nathanael Leon G

|Page 8