DETAILED ESTIMATES
ARCHITECTURAL/CIVIL/STRUCTURAL/PLUMBING/ELECTRICAL WORKS
(Based on DPWH DO No.22, Series of 2015)
TOTAL
MAT. LABOR ESTIMATED CONTRACTOR'S TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT MATERIAL VAT OCM TOTAL COST
COST COST DIRECT COST PROFIT COST
COST
(1) (2) (3) (4) (5) (6) (7) (9) (10) (14) (15) (16)
A.General Requirements
Sub Total
B. EARTHWORKS
C. CONCRETE WORKS
D. MASONRY WORKS
E. STEEL WORKS
A. FLOOR FINISHES
A.2 300mm X 300mm Non Skid Ceramic Floor Tiles 381.00 pc.
B. WALL FINISHES
C. CEILING FINISHES
Page 1
TOTAL
MAT. LABOR ESTIMATED CONTRACTOR'S TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT MATERIAL VAT OCM TOTAL COST
COST COST DIRECT COST PROFIT COST
COST
D. PAINTING WORKS
E. ROOFING WORKS
D-2 0.80 X 2.10 Swing Panel Door w/ Glass Panel 2.00 set
D-4 1.20 X 2.10 Double Swing Panel Door w/ Glass Panel 2.00 set
H. RAILING WORK
A. Lighting Fixtures
B. Wiring Devices
C. Roughing-In
F. Miscellaneous
Page 2
TOTAL
MAT. LABOR ESTIMATED CONTRACTOR'S TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT MATERIAL VAT OCM TOTAL COST
COST COST DIRECT COST PROFIT COST
COST
A. PLUMBING FIXTURES
B. SEWERLINE SYSTEM
C. VENT SYSTEM
E. SEPTIC VAULT
GRAND TOTAL
Page 3