Abhishek Kumar +917016783982

E-Mail: nitsabhi.07@gmail.com +918252146722

MECHANICAL IN CHARGE / ON/OFF-SITE PROJECT


Mechanical in charge with a ~ 04 year 5 months of success overseeing all phases of Construction, infrastructure,
superfund and Oil & Gas Sectors projects for government sector clients. Experience includes managing crews of up
to 50 in projects.

BRIEF SNAPSHOT

 An ardent learner with B.E. (Mechanical engineering)


 Good interpersonal skills with strong analytical & problem-solving abilities.

KEY SKILLS

— Project Coordination, Engineering — Planning — Primavera P6


&Management — MS Office — Project monitoring scheduling and
—Preparing Bill of Quantity (Civil, — Change Order Management execution
Mechanical electrical) — Subcontractor/Crew Supervision
— AutoCAD

EXPERIENCE

o Last associated with M/s Sopan projects (A div. Of sopan O&M Pvt. LTD) as Mechanical
Engineer. Working with overall responsibilities as planning, coordination and control of project
in IOCL Pumping Station Viramgam Gujarat.
Since – March 2015 to Till August 2017.

1) Project Details: - Client : IOCL


Project Name : SMPL-DBL Project, Viramgam

Project Venue:-
 Fabrication, Erection, Testing (with use of Dead Bed Tester) & Commissioning of storage tanks,
Pump and AG/UG piping, Structure Painting, Coating, dismantling of 40x20 meter Structure and 25
Ton Pump and its accessories, RCC road, Piled support Structure for Chimney Exhaust, Maximum
pipe size is 42” etc in Station.

Responsibilities:-
I took charge as Mechanical Engineer with a Construction company in Gujarat. I took the
responsibilities of review the design before development, preparing document for construction
process activities, management and monitoring the construction work, project costing, budget
analysis, quality checking of deliverables at each stage and final product. I also did budget analysis
and cost analysis of the projects given to me and scheduled all tasks and activities without
foregoing quality to keep the budget and cost under control which was well appreciated by the
management.

2) Project Details: - Client : HPCL


Project Name : Foam System HPCL
Consultant : Ms Triune

Project Venue:-
Fabrication, Erection, Testing & Commissioning of 8.5KL & 1 KL SS tanks and AG/UG piping,
Structure for Shed and Civil activities according to approved drawing DOL panel installation in Station.

Since, August 2014 to March 2016 Covered three Location Sala was, Palanpur and Jaipur.

3) Project Details: - Client : HPCL


Project : Civil & Mechanical Works@NWzon
Consultant : Ms Triune

Project Venue: - Preparing BOQ, Coordination with Client and Consultant for engineering details of civil
mechanical With Ajmer, Jaipur, Bharatpur, Palanpur, Nandesari,Hazira,Mundra and Kandala as per
requirement monitoring
On daily basis and taking care the Schedule delivery date strictly.

Project Details: Preparing MCC room, Extension of existence control room Preparing of DG shed.
Dismantle of MOV and HOV in existence tanks and replaced by MOV to ROSOV and HOV to MOV.
Preparation of Air Compressor Shed fabrication ,erection of air Line surrounded by all Tanks and giving
connection to inlet outlet and recirculation to operate ROSOV.

Since March 2014 till November 2014.

Previous working: - a) Control Plus Oil & Gas Solutions Pvt. Ltd as Mechanical In charge.
Working with overall responsibilities as planning, coordination and control of project with Gail
India Ltd., Hindustan Petroleum Corporation Ltd., Gujarat State Petro net Ltd., Oil India Limited.

Project Venues: -

1) GAIL AUTHORITY OF INDIA LIMITED & GUJARAT SATAE PETRONET LIMITED

 Role: - Preparing BOQ, Coordination with Client and Consultant as per requirement monitoring
strictly follow time schedule.

 Preparing Piping Plans, Piping Layouts, Equipment Layout, ISO Drawing Reviewing, P & ID,
And Equipment Drawing.
 Installation of Skid, Piping Systems and steel structure by using Plan, Isometric Drawing and P
& ID.
 Supervise all mechanical/Piping construction activities to ensure all the work are carried out as
per Project Specification and Schedule

 Project Details: - Condensate Hold Up Drum a Pressure Vessel of Length 7.5 meter and 2.5-meter
Width Steel Plates Fabrication, erection and testing with consultant Engineers India Limited.
 Metering Regulating and Filtering Skid Fabrication, erection and testing with Gail India Limited
and Gujarat State Petro net Limited Engineers India Limited.

2) HINDUSTAN PETROLEUM COOPORATION LIMITED & OIL INIDIA LIMITED.

 Role:-Preparing BOQ, Coordination with Client and Consultant as per requirement monitoring
strictly follow time schedule.

 Project Details: - Scrapper Traps Fabrication, erection and testing with consultant EIL & Mecon
India Limited

Extra Curriculum

• Basics drafting on Auto Cad

• Participated in Robotics in Collage

• Awarded prize for Quiz round performance in Collage

• Convince Client according our ways of working.

• Maintain Communication among Client, Contractor to our Senior and Colleague.

• Cost Cutting and time saving

PERSONAL DOSSIER

Father’s Name: - Abhishek Kumar


Date of Birth: - 12th January 1991
Gender: - Male.
Nationality: - Indian.
Marital Status: - Single.
Spoken Language: - English, Hindi
Passport No. – J1189176

Permanent Address
S/o Surendra Singh
M.P. Bagh Tari Jai Hind Colony
Ara Bhojpur -802301
Bihar, India

Declaration
I hereby declare that all information furnished by me is true to the best of
My knowledge.
Place:- Delhi
Date: -

Abhishek Kumar