Sunteți pe pagina 1din 14

Name of the ASCI Consultant : B Amarnath

Month of Inspection: October 2019.


S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
1 Rajendranagar Shadnagar Kothur Kothur OPRN 09.10.19 A-0472- 1847 1) E/S to 3 Nos 1)The Open wire
70-02- .Agl.connections set has not been
12-01- with 1 No. 3-ph earthed
25KVA DTR to
050 ________X
Sri.M.Narsimulu
at Chegur (V) in
Kothur Section
under SPA-PE
Scheme.
A-0472-
70-02- 2) E/S to 4 Nos 1) The open wire
.Agl.connections
12-01- set has to be
with 1 No. 3-ph
022 25KVA DTR to earthed.-------------
Sri.J.Rajiah and ---X.
others at
Pittalaguda (V) in
Kothu Section
under SPA-PE
Scheme.
2 Rajendranagar Shadnagar Shadnagar Rural SDNR OPRN 10.10.19 E-2018- 1848 1) E/S to 2 1)The L.A.set is not
70-01- Nos.Commercial connected to the
11-02- connections with DTR………….X
1 No.S-ph25 KVA
037
DTR to
M/s.Skandhanshi 2)The Distribution
Infra Projects at Box has tobe
Raikal(V) in Earthed
Shadnagar Rural Properly...………….X
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
Section under
SC-Extension of
Supply
(LT)Scheme.
E-2019-
70-02- 2) E/S to 1 No. 1) The
11-02- Commercial L.T.Distribution
006 connections with box has to be
1 No. 3-ph 25 earthed properly.-
KVA DTR to -----------------------
M/s.Reliance Jio X.
Infocom Ltd. at
Bheemaram (V)
in Shadnagar
Rural Section
under SC-
Extension of
Supply (LT)
Scheme.
3 Rajendranagar Shadnagar Shadnagar Kondurg OPRN 11.10.19 P-1811- 1849 1) Rectification 1)The moving and
70-02- and fixed contacts of
11-03- Maintenance of damaged 33KV
027 33KV and 11KV and 11KV AB
800A, 400A. Switches and also
A.B.Switches of servicing of all the
33/11KV AB Switches done
Uttaraspally S.S. at 33/11KV
in Kondurg Uttaraspally S.S
Section, under by taking 33kv L.C.
Improvement on 27-02-2019 .
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
Works. The quality of the
work done is
found to be Ok.

T-1603- 1) The AB Switch


03-03- shall be earthed at
22-02- 2) Erection of 1 the handle with
015 No. 3-ph 25KVA coiled GI Wire
Addl.DTR under No.8.------X.
existing 2) The DTR neutral
63KVA/SS-12 is connected with
DTR at G.I.wire instead of
Thangallapally G.I.flat.-------X.
(V) in Kondurg 3) The Open wire
Section under set has to be
Improvement provided and
Works. earthed properly.-
----X.
4) All earth
electrodes shall be
interconnected.----
X
4 Rajendranagar Shadnagar Shadnagar Kondhurg OPRN 14.10.19 T-1711- 1850 1) Erection of 12 1) The work
70-02- Nos. 11KV A.B involved is
11-03- Switches and erection of 11KV
014 11KV H.G.fuse A.B.Switches and
sets at varios 11KV HG fuse sets
distributions in to 12 Nos.Old
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
Kondurg Section DTRs at various
under distributions
Improvement which were
Works. without A.B
Switches .
2) The AB Switch
shall be earthed at
the handle with
T-1603- coiled GI Wire
03-03- 2) No.8.-----X.
22-02- Erection of 1
016 No.3-ph 25KVA 1) The AB Switch
Addl.DTR under shall be earthed at
existing the handle with
100KVA/SS-51 coiled GI Wire
DTR at Raviryal No.8.------X.
(V) in Kondurg 2) The DTR neutral
Section under is connected with
Improvement G.I.wire instead of
Works. G.I.flat.-------- -X.
3) The Open wire
set has to be
provided and
earthed properly.-
X.
5 Rajendranagar Kandukur Mamidipally Maheshwaram OPRN 17.10.19 S-0363- 1851 1) Erection of 1 1) The L .T.
06-04- No. 15KVA S-ph Distribution Box
13-03- DTR at has to be earthed
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
001 Thukkuguda (V) ________X
in 2) Out of 11 poles
Maheshwaram drawn only 2 poles
Section, under are found on the
SC Sub Plan. site.---------- X

1) It is reported by
A-0093- the field staff that
06-04- 2) E/S to 3 Nos. the work has not
13-03- Agl. Connections been taken up for
020 with 1 No. 3- execution.------Z.
phase 25 KVA
DTR to
Sri.B.Satya
Narayana and
others at
Almasguda,
Mankal (V) in
Maheshwaram
Section,under
SPA-PE Scheme.
6 Rajendranagar Kandukur Mamidipally Maheshwaram OPN 17.10.19 A-0261- 1852 1) E/S to 1 No. 1) 360mts of AAA
06-04- Agl.Connection Conductor 55
13-03- from the existing sq.mm was drawn,
345 underloaded 25 however On field
KVA DTR to Sri. inspection it was
Adirala Srinu at found that instead
Gangaram (V) in of AAA Conductor
Maheshwaram AB Cable 3C was
Section, under used for stringing
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
SPA- PE Scheme. of L.T.line for 4
spans of av.50mts
each totaling to
200mts was
strung. -----------X.
2) In the billing
stringing of
L.T.lines 3-ph 3-
conductor 450mts
was claimed.
Instead of claiming
200 mts AB Cable
stringing. --------X.
A-0261- 2) E/S to 1 No. 1) 360mts of AAA
06-04- Agl.Connection Conductor 55
13-03- from the existing sq.mm was drawn,
344 underloaded 25 however On field
KVA DTR to Sri. inspection it was
A.Venkat Reddy found that instead
at Thummalur of AAA Conductor
(V) in AB Cable 3C was
Maheshwaram used for stringing
Section, under of L.T.line for 4
SPA-PE Scheme. spans of av.50mts
each totaling to
200mts was
strung. --------X.
2) In the billing
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
stringing of
L.T.lines 3-ph 3-
conductor 450mts
was
claimed.Instead of
claiming 200 mts
AB Cable stringing.
-----------------------
X.
7 Rajendranagar Kandukur Mamidipally Kandukur OPN 18.10.19 T-1303- 1853 1) Erection of 1 1) The earth
06-4-13- No. S-ph 15 KVA electrode ie, one
02-013 DTR at No. C.I.pipe is
Gummadivelli buried 1ft above
(V) in Kandukur ground level. -----
Section under X.
T&D 2) The HG fuse
Improvement control is not
Works. provided to the
DTR.--------------X.
A-0106- 2) E/S to 5 Nos.
06-04- Agl. Connections 1) There is no
13-02- with 1 No. 3-ph trace of the above
019 25 KVA DTR to work only an
Smt.Mudavath empty plinth is
Tharya and now available at
others at the site,the
Dawoodguda present AE
Thanda in informed that
Kandukur HVDS work was
Section under done in that area,
SPA-PE Scheme. so the DTR might
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
have been shifted
to some other
place.----X.
2) However there
are no 9.1m poles
and 8m poles 4
Nos. each as
shown in the
estimate. -----X.
8 Rajendranagar Rajendranagar Gaganpahad Gaganpahad OPN 19.10.19 T-1010- 1854 1) Erection of 20 1) Stiffner pieces
06-02- Nos. 8mts and shall be used for
21-01- 10 Nos. 9.1 mts binding at all
001 PSCC 11KV pin
Intermediate insulators.------X.
Poles at various
distributions of
Gaganpahad
Section , under
Improvement
Works.

E-2019- 2) E/S to 17 Nos. 1) The earth


70-01- S-ph 1KW strip/cable are to
12-01- Domestic be laid inside the
019 connectons with ground. --------------
a Panel Board to -----------X.
Sri .V.Saideep at
TNGOs Colony in
Gaganpahad
Section under
SC-Extension of
Supply (LT)
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
Scheme.
9 Rajendranagar Rajendranagar Gaganpahad Mylardevpally OPN 21.10.19 E-2019- 1855 1) E/S to 3 Nos. 1) Earth pits are to
70-01- S-ph 1KW be 1 feet above
12-03- Domestic ground level and
002 connections and earth electrode to
3 Nos. 1KW Non be 8 inches below
domestic ground level --------
connections --------------------X.
inaddition to
existing 4 Nos S-
ph 1 KW
connectios with
a Panel Board to
Sri.Syed Iqbal at
Jahangeerabad
in Gaganpahad
Section under
SC-Extension of
Supply (LT)
Scheme.
E-2019- 2) E/S to 7 Nos. 1) The earth
70-01- S-ph 1KW strip/cable are to
12-03- Domestic be laid inside the
010 connections in ground. --------------
addition to -----------X.
existing 1 No.
1KW domestic
connection with
a Panel Board to
Sri .A.Sriramulu
Yadav at
Mailardevpally
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
(V) in
Mailardevpally
Section under
SC-Extension of
Supply (LT)
Scheme.
10 Rajendranagar Rajendranagar Gaganpahad Kattedan OPN 22.10.19 E-2019- 1856 1) E/S to 4 Nos. 1) Earth pits are to
70-01- S-ph 1KW be 1 feet above
12-02- Domestic ground level and
004 connections and earth electrode to
1 No.3-ph 5KW be 8 inches below
in addition to ground level --------
existing 3 Nos.S- --------------------X.
ph 1KW
Domestic
connectios with
a Panel Board to
Smt.Akthari
Begum at
Shastripuram in
Kattedan Section
under SC-
Extension of
Supply (LT)
Scheme.

E-2018- 2) E/S to 8 Nos. 1)


70-01- S-ph 1KW The earth
12-02- Domestic strip/cable are to
066 connections and be laid inside the
1 No.3-ph 5KW ground. --------------
in addition to -----------X.
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
existing 1 No.S-
ph 1KW
Domestic
connection with
a Panel Board to
Sri.Abdul
Rahman and
others at
Subhan Colony
in Kattedan
Section under
SC-Extension of
Supply (LT)
Scheme.
11 Rajendranagar Rajendranagar Shamshabad Shapur OPN 23.10.19 E-2019- 1857 1) E/S to 1 No. 1) Double
70-01- 2KW Non jumpering with
13-02- domestic the same
020 connection from conductor shall be
the existing done at the cut-
under loaded S- points.--------------X
ph 15 KVA DTR
to Sri.Manzoor
Ali Khan at
Pedda Shapur
(V) in Shapur
Section under
SC-Extension of
Supply (LT)
Scheme.
A-0260- 2) E/S to 6 Nos. 1) The L.A.s shall
06-02- Agl.connections be connected to
22-02- with 1 No. 3-ph the DTR and
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
027 25 KVA DTR to earthed----------X.
Sri.K.Takya and 2)The AB Switch
others at handle shall be
Madanpally (V) earthed. ---------X.
in Shapur 3) Double
Section under jumpering with
SPA-PE Scheme. the same
conductor has to
be done at cut
points. ----------X.
4) For L.T.line
erection 7 Nos.8m
poles were drawn
from the store
,however as per
the field
inspection only 2
are found to have
been erected at
the site. Balance 5
Nos 8m poles and
corresponding
conductor,
matching
materials may
have to be
recovered from
who ever have
been handed over.
-----------Y.
12 Rajendranagar Rajendranagar Rajendranagar Himayathsagar OPN 24.10.19 E-2019- 1858 1) E/S to 4 Nos. 1) Earth pits are to
70-01- S-ph 2KW be 1 feet above
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
11-02- Domestic ground level and
033 connections in earth electrode to
addition to be 8 inches below
existing 1 No.3- ground level --------
ph 5KW and --------------------X.
1No.S-ph 1KW
Domestic
connectios with
a Panel Board to
Sri.S.Hari Krishna
Reddy at
Bandlaguda Jagir
(V) in
Himayathsagar
Section under-
Extension of
Supply (LT)
Scheme.

E-2019- 2) E/S to 8 Nos. 1) The earth


70-01- S-ph 2KW strip/cable are to
11-02- Domestic be laid inside the
038 connections in ground. --------------
addition to -----------X.
existing 1 No.3-
ph 5KW Non
Domestic
connection with
a Panel Board to
Sri.K.Jagan
Mohan Reddy at
Bandlaguda Jagir
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
(V) in
Himayathsagar
Section under
SC-Extension of
Supply (LT)
Scheme.