1) It is reported by
A-0093- the field staff that
06-04- 2) E/S to 3 Nos. the work has not
13-03- Agl. Connections been taken up for
020 with 1 No. 3- execution.------Z.
phase 25 KVA
DTR to
Sri.B.Satya
Narayana and
others at
Almasguda,
Mankal (V) in
Maheshwaram
Section,under
SPA-PE Scheme.
6 Rajendranagar Kandukur Mamidipally Maheshwaram OPN 17.10.19 A-0261- 1852 1) E/S to 1 No. 1) 360mts of AAA
06-04- Agl.Connection Conductor 55
13-03- from the existing sq.mm was drawn,
345 underloaded 25 however On field
KVA DTR to Sri. inspection it was
Adirala Srinu at found that instead
Gangaram (V) in of AAA Conductor
Maheshwaram AB Cable 3C was
Section, under used for stringing
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
SPA- PE Scheme. of L.T.line for 4
spans of av.50mts
each totaling to
200mts was
strung. -----------X.
2) In the billing
stringing of
L.T.lines 3-ph 3-
conductor 450mts
was claimed.
Instead of claiming
200 mts AB Cable
stringing. --------X.
A-0261- 2) E/S to 1 No. 1) 360mts of AAA
06-04- Agl.Connection Conductor 55
13-03- from the existing sq.mm was drawn,
344 underloaded 25 however On field
KVA DTR to Sri. inspection it was
A.Venkat Reddy found that instead
at Thummalur of AAA Conductor
(V) in AB Cable 3C was
Maheshwaram used for stringing
Section, under of L.T.line for 4
SPA-PE Scheme. spans of av.50mts
each totaling to
200mts was
strung. --------X.
2) In the billing
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
stringing of
L.T.lines 3-ph 3-
conductor 450mts
was
claimed.Instead of
claiming 200 mts
AB Cable stringing.
-----------------------
X.
7 Rajendranagar Kandukur Mamidipally Kandukur OPN 18.10.19 T-1303- 1853 1) Erection of 1 1) The earth
06-4-13- No. S-ph 15 KVA electrode ie, one
02-013 DTR at No. C.I.pipe is
Gummadivelli buried 1ft above
(V) in Kandukur ground level. -----
Section under X.
T&D 2) The HG fuse
Improvement control is not
Works. provided to the
DTR.--------------X.
A-0106- 2) E/S to 5 Nos.
06-04- Agl. Connections 1) There is no
13-02- with 1 No. 3-ph trace of the above
019 25 KVA DTR to work only an
Smt.Mudavath empty plinth is
Tharya and now available at
others at the site,the
Dawoodguda present AE
Thanda in informed that
Kandukur HVDS work was
Section under done in that area,
SPA-PE Scheme. so the DTR might
S.no Circle Division Subdivision Section Type Date of WBPS IR Name of the Work Remarks
Inspection Numbers NO
have been shifted
to some other
place.----X.
2) However there
are no 9.1m poles
and 8m poles 4
Nos. each as
shown in the
estimate. -----X.
8 Rajendranagar Rajendranagar Gaganpahad Gaganpahad OPN 19.10.19 T-1010- 1854 1) Erection of 20 1) Stiffner pieces
06-02- Nos. 8mts and shall be used for
21-01- 10 Nos. 9.1 mts binding at all
001 PSCC 11KV pin
Intermediate insulators.------X.
Poles at various
distributions of
Gaganpahad
Section , under
Improvement
Works.