General Overview Concerning

Local Content for the Turbine


Island of Olkiluoto 3

04.02.2005 Power Generation 1


W751
Project Organization Turbine Island
General Project Manager
Quality Management H & S, Environmental
U. Kaufmann
H. Lederer S. Graf

Proj. Commercial Manager Proj. Engineering Manager Senior Site Manager Local Proj. Office Manager
C. Henkel E. Veith R. Schroedter
H.-D. Reisinger

Purchasing Steam Turbine, Condenser C. Construction Manager Local Commerc Manager


G. Scheller Rademacher (N. Schindler)

Contract Manager Generator Commercial Site Manager Licensing


B. Crossley Todt (Benecke) J. Rautiainen

Time Scheduling Mechanical Engineering Contract Administrator Local Engineering Manager


T. Bolzmann H. Kraus

Administration Electrical Engineering Commissioning Manager Mechanical


H. Ortwig J. Schwierz

Team Assistant(s) Process Engineering Civil


Fr. E. Beck, Fr. H. Marongiu R. Reindel

Registrator Plant Layout/Civil Engineering Electrical


Fr. S. Riedel H.Liebich/R.Menrath/M.Trossen

Logistics, Shipping Erection / Commissioning Secretary


M. Rogge H-D Reisinger

Spare parts
L. Kiessling Power Generation
PG W751 / Slide 2
Process Systems
water / steam cycle turbine island

Moisture
Moisture
Pre
Pre
Separator
Separator
22-stage
-stage
Reheater
Reheater

Reheater
Reheater
Stage
Stage 22
Drains
Drains
Cooler 44-stage
-stage
Cooler
LP-
LP- Preheating
LP- Preheating

22-- stage
stage
HP-
HP--
HP 4x33%
4x33% E-E--
E
Preheating
Preheating driven fixed
driven fixed
speed
speed
Feedpumps
Feedpumps

Power Generation
PG W751 / Slide 3
Model View of Mechanical Components in
Turbine Building of Olkiluoto 3

Power Generation
PG W751 / Slide 4
Important time frame for piping of turbine
island

z Enquiry since End of July 2004

z Awarding of contract(s) planned for middle of February 2005

z Prefabrication from December 2005 to August 2006

z Erection July 2006 – January 2008

z First synchronising May 30th, 2008

Power Generation
PG W751 / Slide 5
Activities performed by Main Subcontractor for
piping (Software)

z Detail design of piping


z Stress analysis in cases required by applicable Standards (DIN EN 13480-3)
z Detail design of supports and hangers
z Coordination with base Material suppliers and other possible Contractors
(or inhouse) of all procedures for special processes required (WPS, WPAR, NDT,
heat treatment, other processes, etc.
z Pre-Inspection documents (for Notified Body, Siemens, TVO, STUK or IO/STUK)
z Purchase of Materials and components
z Prefabrication of spools including testing, including coordination of NOBO, Customer
and STUK inspections (inspection points).
z Erection at site /all required (NDT-) testing up to hydrotesting.
z Compilation of Documentation, Final Data Package

Power Generation
PG W751 / Slide 6
Activities performed by Main Subcontractor for
piping (Hardware)

z Purchase of Materials and components

z Gathering and preparing of preinspection documents from base Material suppliers


and other possible Contractors (or inhouse) of all procedures for special processes
required (WPS, WPAR, NDT, heat treatment, other processes, etc.)

z Preinspection documents (approval by Notified Body, TVO, STUK)

z Prefabrication of spools and transport to OL3 - Power plant erection site

z Erection at site /all required (NDT-) testing up to hydrotesting.

Power Generation
PG W751 / Slide 7
Other Scope which may be provided locally

Erection and Commissioning within turbine island

Order Date

z General scope for


electrical 10/2005
mechanical 04/2006
and process engineering 10/2005

z Heating, venting and air conditioning 05/2005

z Fire fighting systems 06/2005

z Fabrication and Erection of


2 Demineralized Water Tanks (Austenitic steel)

Power Generation
PG W751 / Slide 8
Civil Contractors

Parma Oy
Contractor for Precast Elements
Markku Rotko, Marketing Manager, 03101 Numela, Phone 0205 77 5533
Marko Levola, Project Engineer, 03101 Numela, Phone 0205 77 5509

Lapin Teollisuuurakennus Oy (LTR)


Contractor for Civil Works of Switchgear Building
Pekka Reunanan, General Manager, 94 100 Kemi, Phone 016 256 642
Kari Mustaparta, Project Manager, 90 100 Oulu, Phone 08 554 3025

Heitkamp, 44652 Herne, Germany


Contractor for Civil Works of Turbine Hall
Kurt-Dieter Jünger, Commercial Director, Phone +49 (0) 2325 57 4342

(Civil Finishing Works will be contracted later)

Power Generation
PG W751 / Slide 9
Section View Switchgear Building

Power Generation
PG W751 / Slide 10
Procurement Electrical

Order

• 400/110kV- HV transformers 7 units

• 400kV HV switchgear 4 diameters 1/2006

• Isolated phase busduct 27kV/45kA 240 m 8/2006

• 10kV- MV switchgears 70 cubicles 6/2005

• 690/400V- LV switchgears 110 cubicles 1/2005

• LV-transformers 11 units 8/2005

• Emergency Diesel Gen. , DC + UPS various 11/2005

Power Generation
PG W751 / Slide 11
Procurement Electrical

Order

• Cables 150 km 01/2006

• Cable Trays 12 km 10/2005

• Lighting and small power TI-buildings 05/2005

• Earthing material TI-buildings 07/2005

• Above listed components are intended to be procured in Finnland

Power Generation
PG W751 / Slide 12
(To be revised) Contacts

Purchasing
Main Components Dept. Tel. Fax e-mail
Manager

Local Siemens Office Espoo Rautiainen +358 10 5115334 +358 10 5115330 juhani.rautiainen@siemens.com
Team Leader Purchasing Scheller WSM1 Erl (09131) 18-2335 (09131) 18-5617 Gerhard.Scheller@siemens.com
Pumps Kühn WSM1 Erl (09131) 18-7197 (09131) 18-5617 Edmund.Kuehn@siemens.com
Site infrastructure (Office buildings
and furniture, power supply, water, Ms. Passarge WSM 2 Erl (09131) 18-2820 (09131) 18-2329 Nadia.Passarge@siemens.com
waste water, communication)
Heaters Ms. Fischer S. WSM 2 Erl (09131) 18-4896 (09131) 18-5617 Susy.Fischer@siemens.com
Civil works Ms. Jerkewitz WSM 2 Erl (09131) 18-7086 (09131) 18-2329 Baerbel.Jerkewitz@siemens.com
Piping Lischick WSM 2 Erl (09131) 18-89416 (09131) 18-5617 Guenther.Lischick@siemens.com
HVAC Ms. Passarge WSM 2 Erl (09131) 18-2820 (09131) 18-2329 Nadia.passarge @siemens.com
Mechanical erection Frank WSM2 Erl (09131) 18-2603 (09131) 18-2329 Karl-Heinz.Frank@siemens.com
Electrical erection Frank WSM 2 Erl (09131) 18-2603 (09131) 18-2329 Karl-Heinz.Frank@siemens.com
Fire fighting and detection Ms. Passarge WSM 2 Erl (09131) 18-2820 (09131) 18-2329 Nadia.Passarge @siemens.com
Cable racks Kretschmer WSM 2 Erl (09131) 18-89624 (09131) 18-2198 Michael.Kretschmer@siemens.com
Cables Kretschmer WSM 2 Erl (09131) 18-89624 (09131) 18-2198 Michael.Kretschmer@siemens.com
Valves Lischick WSM 2 Erl (09131) 18-89416 (09131) 18-5617 Guenther.Lischick @siemens.com
Cranes, elevators, hoisting devices Passarge WSM 2 Erl (09131) 18-2820 (09131) 18-2329 Nadia.Passarge @siemens.com
Tanks Ms. Fischer S. WSM1 Erl (09131) 18-4896 (09131) 18-5617 Susy.Fischer@siemens.com
Communication, power supply,
Höhl WSM 2 Off (069) 807-2361 (069) 807-4555 Hansjoerg.Hoehl@siemens.com
lighting and small power, earthingl

LV Switchgear Kretschmer WSM 2 Erl (09131) 18-89624 (09131) 18-2198 Michael.Kretschmer@siemens.com


MV Switchgear Kretschmer WSM 2 Erl (09131) 18-89624 (09131) 18-2198 Michael.Kretschmer@siemens.com

Power Generation
PG W751 / Slide 13