Revision No. 4
MUD PLUG INSTALLATION Next Revision Date: Feb 2019
Preparation: Safety Manager Authority: President Issuing Department: Safety Page 1 of 4
REFERENCES
Personal Protective Equipment Standards 1.13
Gas Testing 1.24
Monitoring Gaseous Areas 1.37
Lockouts and Forceful Removal of a Lock 1.2
Installation of Blanking Devices 1.45
ASSOCIATED DOCUMENTS
Gas Testing Log
PURPOSE
Mud (gel) plugs are installed at line-repair or tie-in locations to prevent residual water, crude oil
and hydrocarbon vapors from entering the work area through open-ended piping.
Three types of mud plugs, or a combination of them are used:
HAZARDS
• Gas vapors.
• Hydrocarbon fluids.
• Produced water.
• Sharp edges on pipe after cold cutting.
• H2S
• Pressure release
STANDARDS
Mud plugs must not be used as a replacement for isolation. The type of mud plug selected is
determined on a per site basis.
Revision No. 4
MUD PLUG INSTALLATION Next Revision Date: Feb 2019
Preparation: Safety Manager Authority: President Issuing Department: Safety Page 2 of 4
Responsibilities
The operations sponsor will complete decommissioning as specified in the written plan.
Operations will complete a lock out and blanking tour.
The Job Site supervisor and contractor will select the proper mud plug.
Operations will complete a decommissioning plan, which includes purging, lockout and blanking
procedures, before mud plugs are installed.
Special Equipment
Gas detection equipment.
GUIDELINES
Notes and Cautions
A typical mud plug consists of a mixture of Wyoming bentonite clay and water or windshield
washer fluid. These are combined to form a stiff plastic mixture.
The impact of mud plug type and retrieval should be discussed with operations. A solid mud
plug should always be used to supplement a mechanical seal plug.
To obtain maximum swelling capability, freshly prepared mud plug material should always be
used.
Pressure may build up when using non vented plugs. Provide relief through venting.
GENERAL PROCEDURE
Mud Plug Installation
1. Prepare the line for plug installation.
2. Hand file the sharp edges left by the cold-cutter wheels.
3. Clean the inside of the pipe before installing the plug.
4. Install the mud plug into the line.
Revision No. 4
MUD PLUG INSTALLATION Next Revision Date: Feb 2019
Preparation: Safety Manager Authority: President Issuing Department: Safety Page 3 of 4
Revision No. 4
MUD PLUG INSTALLATION Next Revision Date: Feb 2019
Preparation: Safety Manager Authority: President Issuing Department: Safety Page 4 of 4