Documente Academic
Documente Profesional
Documente Cultură
Enero 22 1,000
Febrero 18 1,100
Marzo 22 1,200
Abril 21 1,300
Mayo 22 1,350
Junio 21 1,350
Julio 21 1,300
Agosto 22 1,200
Septiembre 21 1,100
Octubre 22 1,100
Noviembre 20 1,050
Diciembre 20 900
TOTAL 252 13,950
DEMANDA PRONOSTICADADIARIA
70
60
50
40
Col u
prod
30
20
10
-
- 2 4 6 8 10 12 14
MES
Col umn L
producci ón dia ri a (para cada mes )
10 12 14
GRAFICAR
P. DEMANDA (DIARIO)
45
45
45
61
61
61
61
55
55
55
55
62
62
62
62
61
61
61
61
64
64
64
64
62
62
62
62
55
55
55
55
52
52
52
52
50
50
50
50
53
53
53
53
45
45
45
MES DEMANDA ESPERADA DIAS DE PRODUCCION DEMANDA POR DIA MES
Enero 900 22 41 Enero
Febrero 700 18 39 Febrero
Marzo 800 21 38 Marzo
Abril 1,200 21 57 Abril
Mayo 1,500 22 68 Mayo
Junio 1,100 20 55 Junio
TOTALES 6,200 124 298 TOTALES
MES
Enero
Febrero
número de trabajadores 8 Marzo
productos por día 40 Abril
se usan tiempos extra Mayo
inv inicial - Junio
inv final - TOTALES
Costo de mano de ob
Costo de mano de ob
sin horas extra, en el primer mes tenemos los operarios necesarios
para producir costo por disminuir produ
costo subcontratació
estableciendo la capacidad de producción en la del mes mas bajo costo laboral
subcontratamos lo que falte Costo total
a). R// la mejor opción es el plan 2, por que las demás generan más costos.
Costo de mano de ob
Costo de subcontrata
Costo total
b). R// el plan 6 termina siendo el segundo mejor plan. El mejor sigue siendo el plan 2.
DEMANDA ESPERADA DIAS DE PRODUCCION PRODUCCION SUBCONTRATAR
900 22 660 240
700 18 540 160
800 21 630 170
1,200 21 630 570
1,500 22 660 840
1,100 20 600 500
6,200 124 3,720 2,480
plan 4
costo horas extra 13,888
costo mant inv 400
Costo total 53,968
más costos.
e siendo el plan 2.
PRODUCCIÓN PARA HORAS EXTRA
20
-
-
300
620
300
1,240
MES DEMANDA PRODUCCION INV. INIC. INV. FINAL FALTANTE CONTRATAR DESPEDIR
ENERO 1,400 1,600 200 400 - - -
FEBRERO 1,600 1,400 400 200 - - -
MARZO 1,800 1,600 200 - - - -
ABRIL 1,800 1,800 - - - - -
MAYO 2,200 1,800 - - 400 - -
JUNIO 2,200 2,200 - - - - -
JULIO 1,800 2,200 - 400 - - -
AGOSTO 1,400 1,000 400 - - - 8
COSTOS Prod/Mes 40
Costo de mantener inventario/mes 8
Costo de subcontratar/und 80 COSTOS TOTALES
Mano de obra en tiempo regular/hora 12 Costo de mantener inv 1,024
Mano de obra en tiempo extra/hora 18 Costo de mano de obr 168,960
Costo de contratacion/trabajador 40 Costo contratar 520
Costo de despidos/trabajador 80 Costo despedir 240
COSTO TOTAL 170,744
CONDICIONES
Fuerza de trabajo actual (junio) 8
Horas-trabajo/DVD 4
Dias habiles/mes 20
Inventario inicial 150
Inventario final -
INV. FINAL SUB CONT CONTRATOS DESPIDOS
30 - - 1
15 - 5 -
27 - 2 -
10 - 3 -
13 - 3 -
33 - - 2
MES DEMANDA TRABAJADORES PRODUCCION
JULIO 400 8 320
AGOSTO 500 8 440
SEPTIEMBRE 550 8 560
OCTUBRE 700 8 680
NOVIEMBRE 800 8 800
DICIEMBRE 700 8 720
CONDICIONES
Fuerza de trabajo actual (junio) 8
Horas-trabajo/DVD 4
Dias habiles/mes 20
Inventario inicial 150
Inventario final -
SUBCONTRATAR INV. INIC. INV. FINAL HORAS EXTRAS CONTRATOS DESPIDOS
- 150 70 - - -
- 70 10 3 - -
- 10 20 6 - -
- 20 - 9 - -
- - - 12 - -
- - 20 10 - -
TOS TOTALES
960
92,160
14,400
-
-
-
107,520
MES DEMANDA TRABAJADORES PRODUCCION SUBCONTRATAR
JULIO 400 7 250 -
AGOSTO 500 7 501 -
SEPTIEMBRE 550 7 550 -
OCTUBRE 700 7 700 -
NOVIEMBRE 800 7 802 -
DICIEMBRE 700 7 700 -
OTROS DATOS
Fuerza de trabajo actual (junio) 8
Horas-trabajo/DVD 4
Dias habiles/mes 20
Inventario inicial 150
Inventario final -
INV. INIC. INV. FINAL HORAS EXTRAS CONTRATOS DESPIDOS
150 - - - 1
- 1 6 - -
1 0 8 - -
0 0 12 - -
0 1 15 - -
1 1 12 - -
MES DEMANDA PRODUCCION INV. INI INV. FINAL SUBCONT.
JULIO 1,000 1,000 - - -
AGOSTO 1,200 1,000 - - 200
SEPTIEMBRE 1,400 1,000 - - 400
COSTOS
Costo por ventas perdidas 100
Costo de mantener inventario 25
Costo de subcontratar 60
COSTOS TOTALES
Costo por ventas perdidas -
COSTOS
Costo por ventas perdidas 100
Costo de mantener inventario 25
Costo de contratar/Und 30
Costo de despedir/Und 60
DESPEDIR
-
- COSTOS TOTALES
- Costo por ventas perdidas -
- Costo de mantener inventario 25,000
- Costo de despedir 12,000
200 Costo de contratar 15,000
COSTO TOTAL 52,000
MES DEMANDA PRODUCCIONINV. INI INV. FINAL SUBCONT.
JULIO 1,000 1,300 300 600 -
AGOSTO 1,200 1,300 600 700 -
SEPTIEMBRE 1,400 1,300 700 600 -
OCTUBRE 1,800 1,300 600 100 -
NOVIEMBRE 1,800 1,300 100 - 400
DICIEMBRE 1,600 1,300 - - 300
COSTOS
Costo por ventas perdidas 100
Costo de mantener inventario 25
Costo de subcontratar 60
COSTOS TOTALES
Costo por ventas perdidas -
Costo de mantener inventario 50,000
Costo de subcontratar 42,000
COSTO TOTAL 92,000
MES DEMANDA PRODUCCION PROD.EXTRA INV. INI INV. FINAL
JULIO 1,000 1,300 - 300 180
AGOSTO 1,200 1,300 - 180 180
SEPTIEMBRE 1,400 1,300 - 180 80
OCTUBRE 1,800 1,300 260 80 -
NOVIEMBRE 1,800 1,300 260 - -
DICIEMBRE 1,600 1,300 260 - -
COSTOS
Costo por ventas perdidas 100
Costo de mantener inventario 25
Costo de tiempo ocioso por unidad 60
Costo de subcontratar 60
Costo de tiempo extra 40
COSTOS
Contratacion de trabajadores/und 40
Despido de trabajadores/und 80
Costo unitario/und 30
Tiempo extra/und 15
Subcontratacion x
DESPIDOS
100
200 COSTOS TOTALES
- Costo unitario 162,000
200 Contrato de trabajadores 12,000
Despido de trabajadores 40,000
COSTO TOTAL 214,000
TRIMESTRE DEMANDA PRODUCCIONINV. INIC. INV. FINAL HORAS EXTRA
1 1,400 1,350 - - 50
2 1,200 1,350 - - -
3 1,500 1,350 - - 150
4 1,300 1,350 - - -
COSTOS
Produccion del trimestre
anterior 1,500
Inventario inicial -
Costo por faltantes o por
ordenes atr. 50
Costo de mantener
inventario/und 10
Contratacion de
trabajadores/und 40
Despido de
trabajadores/und 80
EL PLAN B ES EL MEJOR
Costo unitario/und 30
Tiempo extra/und 15
Subcontratacion x
COSTOS TOTALES
Costo unitario 162,000
Tiempo extra 3,000
COSTO TOTAL 165,000
TRIMESTRE DEMANDA PRODUCCIONINV. INIC. INV. FINAL
1 1,800 1,800 - -
2 1,100 1,100 - -
3 1,600 1,600 - -
4 900 900 - -
Brahian Giraldo
11/4/19
13 QM
Data
COSTS Period 1 Period 2 Period 3 Excess CapCapacity
Beginning inventory 0 4 8 0 20
Period 1 reg time 100 104 108 0 30
Period 1 overtime 150 154 158 0 10
Period 1 subcontracting 200 204 208 0 5
Period 2 reg time 999999 100 104 0 35
Period 2 overtime 999999 150 154 0 12
Period 2 subcontracting 999999 200 204 0 5
Period 3 reg time 999999 999999 100 0 30
Period 3 overtime 999999 999999 150 0 10
Period 3 subcontracting 999999 999999 200 0 5
Demand 40 50 40 32 130 \ 162
Production Quantities
Period 1 USUARIO:
Period 2 Period 3 Excess CapRow Total
priorizamos pasar a
Beginning inventory 20 0 exceso0de capacidad 0 20
Period 1 reg time 20 10 primero0 lo que cuesta0 30
más, subcontratar y horas
Period 1 overtime 0 extra,después,
0 10
si sigue
10
Period 1 subcontracting 0 haciendo 0 falta, pasamos
5 5
Period 2 reg time 0 35 el tiempo
0 regular al
0 35
siguiente periodo si es
Period 2 overtime 0 5 necesario.
0 7 12
Period 2 subcontracting 0 0 5 5
Period 3 reg time 0 0 30 0 30
Period 3 overtime 0 0 10 10
Period 3 subcontracting 0 0 5 5
Page 45
EJERCICIO 13
Page 46
EJERCICIO 13
nn table
table will
will be
be automatically
automatically filled
filled in.
in.
o DATA
to DATATab
Tab onon the
the ribbon,
ribbon, click
click on
on
E.
E.
Page 47
EJERCICIO 13
Page 48
EJERCICIO 14
Brahian Giraldo
11/4/19
EJERCICIO 14
Data
COSTS Period 1 Period 2 Period 3 Period 4 Excess CapCapacity
Beginning inventory 0 100 200 300 0 0
Period 1 reg time 985 1085 1185 1285 0 235
Period 1 overtime 1310 1410 1510 1610 0 20
Period 1 subcontracting 1500 1600 1700 1800 0 12
Period 2 reg time 999999 985 1085 1185 0 255
Period 2 overtime 999999 1310 1410 1510 0 24
Period 2 subcontracting 999999 1500 1600 1700 0 15
Period 3 reg time 999999 999999 985 1085 0 290
Period 3 overtime 999999 999999 1310 1410 0 26
Period 3 subcontracting 999999 999999 1500 1600 0 15
Period 4 reg time 999999 999999 999999 985 0 300
Period 4 overtime 999999 999999 999999 1310 0 24
Period 4 subcontracting 999999 999999 999999 1500 0 17
Demand 255 294 321 301 62 1171 \ 1233
Production Quantities
Period 1 Period 2 Period 3 Period 4 Excess CapRow Total
Beginning inventory 0 0 0 0 0 0
Period 1 reg time 235 0 0 0 0 235
Period 1 overtime 20 0 0 0 0 20
Period 1 subcontracting 0 0 0 12 12
Period 2 reg time 0 255 0 0 0 255
Period 2 overtime 0 24 0 0 0 24
Period 2 subcontracting 0 15 0 0 0 15
Page 49
EJERCICIO 14
Page 50
EJERCICIO 14
nn table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
he
he ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
Page 51
EJERCICIO 14
Page 52
EJERCICIO 15
Brahian Giraldo
11/4/19
EJERCICIO 15
Data
COSTS M1 M2 M3 M4 Excess CapCapacity
Beginning inventory 0 4 8 12 0 500
Period 1 reg time 70 74 78 82 0 1500
Period 1 overtime 110 114 118 122 0 400
Period 1 subcontracting 120 124 128 132 0 600
Period 2 reg time 999999 70 74 78 0 1600
Period 2 overtime 999999 110 114 118 0 400
Period 2 subcontracting 999999 120 124 128 0 600
Period 3 reg time 999999 999999 70 74 0 750
Period 3 overtime 999999 999999 110 114 0 200
Period 3 subcontracting 999999 999999 120 124 0 600
Period 4 reg time 999999 999999 999999 70 0 1600
Period 4 overtime 999999 999999 999999 110 0 400
Period 4 subcontracting 999999 999999 999999 120 0 600
Demand 2000 2500 1500 2100 1650 8100 \ 9750
Production Quantities
M1 M2 M3 M4 Excess CapRow Total
Beginning inventory 500 0 0 0 0 500
Period 1 reg time 1500 0 0 0 0 1500
Period 1 overtime 400 0 0 400
Period 1 subcontracting 0 0 600 600
Period 2 reg time 0 1600 0 0 0 1600
Period 2 overtime 0 400 0 0 0 400
Period 2 subcontracting 0 100 0 0 500 600
Page 53
EJERCICIO 15
Page 54
EJERCICIO 15
nn table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
he
he ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
Page 55
EJERCICIO 15
Page 56
EJERCICIO 16
EJERCICIO 16
Enter
Enter production
production costs
costs at
at top.
top.The
The transp
trans
and
and demands
demands inin the
the table.
table. Go
Go to
to DATA
DATATT
Aggregate Planning Transportation Method then
then click
click SOLVE.
SOLVE.
For
For problems,
problems, see
see Help,
Help, Solver.
Solver.
Cost per unit (until the end of april) Cost per unit (beginning may)
Regular time 12 Regular time 11
Overtime cost 16 Overtime cost 16 Transportation Method
Subcontract cost 18.5 Subcontract cost 18.5
Holding cost 1 Holding cost 1
Data
COSTS E F M A M J Excess Cap
Beginning inventory 0 1 2 3 4 5 0
Period 1 reg time 12 13 14 15 16 17 0
Period 1 overtime 16 17 18 19 20 21 0
Period 1 subcontracting 18.5 19.5 20.5 21.5 22.5 23.5 0
Period 2 reg time 999999 12 13 14 15 16 0
Period 2 overtime 999999 16 17 18 19 20 0
Period 2 subcontracting 999999 18.5 19.5 20.5 21.5 22.5 0
Period 3 reg time 999999 999999 12 13 14 15 0
Period 3 overtime 999999 999999 16 17 18 19 0
Period 3 subcontracting 999999 999999 18.5 19.5 20.5 21.5 0
Period 4 reg time 999999 999999 999999 12 13 14 0
Period 4 overtime 999999 999999 999999 16 17 18 0
Period 4 subcontracting 999999 999999 999999 18.5 19.5 20.5 0
Period 5 reg time 999999 999999 999999 999999 11 12 0
Period 5 overtime 999999 999999 999999 999999 16 17 0
Period 5 subcontracting 999999 999999 999999 999999 18.5 19.5 0
Period 6 reg time 999999 999999 999999 999999 999999 11 0
Period 6 overtime 999999 999999 999999 999999 999999 16 0
Period 6 subcontracting 999999 999999 999999 999999 999999 18.5 0
Demand 1000 1200 1250 1450 1400 1400 2700
Production Quantities
E F M A M J Excess Cap
Beginning inventory 0 0 0 0 0 0 0
Period 1 reg time 700 100 0 0 0 0 0
Period 1 overtime 300 0 0 0 0 0
Period 1 subcontracting 0 0 0 0 0 500
Page 57
EJERCICIO 16
Page 58
EJERCICIO 16
ction costs
uction costs at
at top.
top.The
The transportation
transportation table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
ds
ds in
in the
the table.
table. Go
Go to
to DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
OLVE.
OLVE.
ms,
ms, see
see Help,
Help, Solver.
Solver.
Transportation Method
Capacity
0
800
300
500
800
300
500
800
300
500
800
300
500
1100
400
500
1100
400
500
7700 \ 10400
Row Total
0
800
300
500
Page 59
EJERCICIO 16
800
300
500
800
300
500
800
300
500
1100
400
500
1100
400
500
10400
Page 60
EJERCICIO 17
EJERCICIO 17
Data
COSTS Period 1 Period 2 Period 3 Period 4 Excess CapCapacity
Beginning inventory 0 0.2 0.4 0.6 0 250
Period 1 reg time 1 1.2 1.4 1.6 0 400
Period 1 overtime 1.5 1.7 1.9 2.1 0 80
Period 1 subcontracting 2 2.2 2.4 2.6 0 100
Period 2 reg time 999999 1 1.2 1.4 0 400
Period 2 overtime 999999 1.5 1.7 1.9 0 80
Period 2 subcontracting 999999 2 2.2 2.4 0 100
Period 3 reg time 999999 999999 1 1.2 0 800
Period 3 overtime 999999 999999 1.5 1.7 0 160
Period 3 subcontracting 999999 999999 2 2.2 0 100
Period 4 reg time 999999 999999 999999 1 0 400
Period 4 overtime 999999 999999 999999 1.5 0 80
Period 4 subcontracting 999999 999999 999999 2 0 100
Demand 500 750 900 450 450 2600 \ 3050
Production Quantities
Period 1 Period 2 Period 3 Period 4 Excess CapRow Total
Beginning inventory 250 0 0 0 0 250
Period 1 reg time 170 230 0 0 0 400
Period 1 overtime 80 0 0 0 0 80
Period 1 subcontracting 0 0 0 0 100 100
Period 2 reg time 0 400 0 0 0 400
Period 2 overtime 0 80 0 0 0 80
Period 2 subcontracting 0 40 0 0 60 100
Period 3 reg time 0 0 800 0 0 800
Period 3 overtime 0 0 100 0 60 160
Period 3 subcontracting 0 0 0 0 100 100
Page 61
EJERCICIO 17
Page 62
EJERCICIO 17
nn table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
he
he ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
Page 63
EJERCICIO 17
Page 64
EJERCICIO 18.
EJERCICIO 18
Data
COSTS Period 1 Period 2 Period 3 Period 4 Period 5 Period 6 Excess Cap
Beginning inventory 0 3 6 9 12 15 0
Period 1 reg time 100 103 106 109 112 115 0
Period 1 overtime 125 128 131 134 137 140 0
Period 1 subcontracting 135 138 141 144 147 150 0
Period 2 reg time 999999 100 103 106 109 112 0
Period 2 overtime 999999 125 128 131 134 137 0
Period 2 subcontracting 999999 135 138 141 144 147 0
Period 3 reg time 999999 999999 100 103 106 109 0
Period 3 overtime 999999 999999 125 128 131 134 0
Period 3 subcontracting 999999 999999 135 138 141 144 0
Period 4 reg time 999999 999999 999999 100 103 106 0
Period 4 overtime 999999 999999 999999 125 128 131 0
Period 4 subcontracting 999999 999999 999999 135 138 141 0
Period 5 reg time 999999 999999 999999 999999 100 103 0
Period 5 overtime 999999 999999 999999 999999 125 128 0
Period 5 subcontracting 999999 999999 999999 999999 135 138 0
Period 6 reg time 999999 999999 999999 999999 999999 100 0
Period 6 overtime 999999 999999 999999 999999 999999 125 0
Period 6 subcontracting 999999 999999 999999 999999 999999 135 0
Demand 150 160 130 200 210 20 450
Production Quantities
Period 1 Period 2 Period 3 Period 4 Period 5 Period 6 Excess Cap
Beginning inventory 0 0 0 0 0 0 0
Period 1 reg time 150 0 0 0 0 0 0
Period 1 overtime 0 0 0 0 0 0
Period 1 subcontracting 0 0 0 0 0 0
Page 65
EJERCICIO 18.
Page 66
EJERCICIO 18.
nn table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
he
he ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
Transportation Method
Capacity
0
150
20
100
150
20
100
150
10
100
150
10
100
150
10
100
0
0
0
870 \ 1320
Row Total
0
150
0
0
Page 67
EJERCICIO 18.
150
20
0
150
10
100
150
10
100
150
10
100
0
0
0
1100
Page 68
EJERCICIO 19.
EJERCICIO 19
Data
COSTS E F M A M J J
Beginning inventory 0 200 400 600 800 1000 1200
Period 1 reg time 1000 1200 1400 1600 1800 2000 2200
Period 1 overtime 1300 1500 1700 1900 2100 2300 2500
Period 1 subcontracting 1800 2000 2200 2400 2600 2800 3000
Period 2 reg time 999999 1000 1200 1400 1600 1800 2000
Period 2 overtime 999999 1300 1500 1700 1900 2100 2300
Period 2 subcontracting 999999 1800 2000 2200 2400 2600 2800
Period 3 reg time 999999 999999 1000 1200 1400 1600 1800
Period 3 overtime 999999 999999 1300 1500 1700 1900 2100
Period 3 subcontracting 999999 999999 1800 2000 2200 2400 2600
Period 4 reg time 999999 999999 999999 1000 1200 1400 1600
Period 4 overtime 999999 999999 999999 1300 1500 1700 1900
Period 4 subcontracting 999999 999999 999999 1800 2000 2200 2400
Period 5 reg time 999999 999999 999999 999999 1000 1200 1400
Period 5 overtime 999999 999999 999999 999999 1300 1500 1700
Period 5 subcontracting 999999 999999 999999 999999 1800 2000 2200
Period 6 reg time 999999 999999 999999 999999 999999 1000 1200
Period 6 overtime 999999 999999 999999 999999 999999 1300 1500
Period 6 subcontracting 999999 999999 999999 999999 999999 1800 2000
Period 7 reg time 999999 999999 999999 999999 999999 999999 1000
Period 7 overtime 999999 999999 999999 999999 999999 999999 1300
Period 7 subcontracting 999999 999999 999999 999999 999999 999999 1800
Period 8 reg time 999999 999999 999999 999999 999999 999999 999999
Period 8 overtime 999999 999999 999999 999999 999999 999999 999999
Period 8 subcontracting 999999 999999 999999 999999 999999 999999 999999
Demand 255 294 321 301 330 320 345
Page 69
EJERCICIO 19.
Production Quantities
E F M A M J J
Beginning inventory 0 0 0 0 0 0 0
Period 1 reg time 235 0 0 0 0 0 0
Period 1 overtime 20 0 0 0 0 0 0
Period 1 subcontracting 0 0 0 0 0 0
Period 2 reg time 0 255 0 0 0 0 0
Period 2 overtime 0 24 0 0 0 0 0
Period 2 subcontracting 0 15 0 0 0 0 0
Period 3 reg time 0 0 290 0 0 0 0
Period 3 overtime 0 0 26 0 0 0 0
Period 3 subcontracting 0 0 5 0 0 0 0
Period 4 reg time 0 0 0 300 0 0 0
Period 4 overtime 0 0 0 1 0 0 0
Period 4 subcontracting 0 0 0 0 0 0
Period 5 reg time 0 0 0 0 300 0 0
Period 5 overtime 0 0 0 0 30 0 0
Period 5 subcontracting 0 0 0 0 0 0
Period 6 reg time 0 0 0 0 0 290 0
Period 6 overtime 0 0 0 0 0 28 0
Period 6 subcontracting 0 0 0 0 0 2 0
Period 7 reg time 0 0 0 0 0 0 300
Period 7 overtime 0 0 0 0 0 0 30
Period 7 subcontracting 0 0 0 0 0 0 15
Period 8 reg time 0 0 0 0 0 0 0
Period 8 overtime 0 0 0 0 0 0 0
Period 8 subcontracting 0 0 0 0 0 0 0
Column Total 255 294 321 301 330 320 345
Page 70
EJERCICIO 19.
nn table
table will
will be
be automatically
automatically filled
filled in.
in. Enter
Enter capacities
capacities
he
he ribbon,
ribbon, click
click on
on Solver
Solver in
in Data
DataAnalysis
Analysis Group
Group
Transportation Method
A Excess CapCapacity
1400 0 0
2400 0 235
2700 0 20
3200 0 12
2200 0 255
2500 0 24
3000 0 16
2000 0 290
2300 0 26
2800 0 15
1800 0 300
2100 0 24
2600 0 17
1600 0 300
1900 0 30
2400 0 17
1400 0 290
1700 0 28
2200 0 19
1200 0 300
1500 0 30
2000 0 19
1000 0 290
1300 0 30
1800 0 20
340 101 2506 \ 2607
Page 71
EJERCICIO 19.
Page 72
MES HORAS POR FACTURAR PRODUCCION HORAS EXTRA
Enero 600 640 -
Febrero 500 640 -
Marzo 1,000 640 240
Abril 1,200 640 240
Mayo 650 640 10
Junio 590 640 -
TOS TOTALES
120,000
30,625
55,000
205,625
MES HORAS POR PRODUCCION HORAS EXTRA HORAS FORRESTER
Enero 660 800 - -
Febrero 550 800 - -
Marzo 1,100 800 240 60
Abril 1,320 800 240 280
Mayo 715 800 - -
Junio 649 800 - -
NUEVO MODELO
PASAJEROS PRECIO POR ASIENTO VENTAS
65 55 3,575
35 165 5,775
TOTAL 9350