Sunteți pe pagina 1din 10

MUNICIPALIDAD PROVINCIAL VALORIZACION MENSUAL DE OBRA Nº 01

CHUCUITO - JULI 30 de abril 2019


OBRA: CONSTRUCCION DE PUESTO DE SALUD CENTRO POBLADO DE SICUYANI
DISTRITO: Zepita FECHA INICIO DE OBRA: 20 DE ABRIL 2019

PROVINCIA: Chucuito
MODALIDAD: Administracion Directa
COSTO DIRECTO: S/. 144,919.19 AVANCE FISICO ACUMULADO 0.00%

PRESUPUESTO AVANCES ó VALORIZACION


SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION DEL PRESUPUESTO DE OBRA P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
PUESTO DE SALUD
01.00.00 OBRAS PROVISIONALES
01.01.01. CARTEL DE IDENTIFICACION DEL PROYECTO UND. 1.00 1,500.000 1,500.00 0.00 0.00 0.00 0.00 0.00 0% 1.00 1,500.00 100%
01.01.02 ALMACEN PARA MATERIALES GLB 1.00 1,000.000 1,000.00 0.00 0.00 0.00 0.00 0.00 0% 1.00 1,000.00 100%
01.02.00 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01 LIMPIEZA DE TERRENO MANUAL M2 202.86 0.400 81.14 0.00 0.00 0.00 0.00 0.00 0% 202.86 81.14 100%
01.02.02 TRAZO Y REPLANTEO M2 202.86 0.910 184.60 0.00 0.00 0.00 0.00 0.00 0% 202.86 184.60 100%
01.03.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.01 EXCAVACION D ZANJAS Y ZAPATAS M3 84.47 7.850 663.09 0.00 0.00 0.00 0.00 0.00 0% 84.47 663.09 100%
01.03.02 RELLENO CON MATERIALES PROPIO M3 14.86 22.860 339.70 0.00 0.00 0.00 0.00 0.00 0% 14.86 339.70 100%
01.03.03 REFINE NIVELACION Y COMPACTACION M2 202.82 0.200 40.56 0.00 0.00 0.00 0.00 0.00 0% 202.82 40.56 100%
01.03.04 ACARREO DE MATERIAL EXEDENTE HASTA PROM 30M M3 86.89 3.330 289.34 0.00 0.00 0.00 0.00 0.00 0% 86.89 289.34 100%
01.04.00. OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.01 CONCRETO CIMIENTO CORRIDO 1:10 + 30,0% PG M3 41.85 92.620 3,876.15 0.00 0.00 0.00 0.00 0.00 0% 41.85 3,876.15 100%
01.04.02 SOBRECIMIENTO DE CONCRETO 1:8 + 25% PM M3 41.85 124.110 5,194.00 0.00 0.00 0.00 0.00 0.00 0% 41.85 5,194.00 100%
01.04.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 8.88 51.910 460.96 0.00 0.00 0.00 0.00 0.00 0% 8.88 460.96 100%
01.06.00 ESTRUCTURA DE MADERA Y COBERTURAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.01 VIGUETAS DE MADERA DE 3"X6"X3.1M M 321.60 57.580 ### 0.00 0.00 0.00 0.00 0.00 0% 321.60 18,517.73 100%
01.06.02 FRISO DE MADERA DE 1"X4" M 41.40 69.770 2,888.48 0.00 0.00 0.00 0.00 0.00 0% 41.40 2,888.48 100%
01.07.00 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
01.07.01 MURO DE LADRILLO SOLAQUEADO KING-KONG ARCILLA DE M2 97.76 65.570 6,410.12 0.00 0.00 0.00 0.00 0.00 0% 97.76 6,410.12 100%
01.07.02. MURO DE SOGA LADRILLO KING-KONG CON CEMENTO AREN M2 129.57 63.690 8,252.31 0.00 0.00 0.00 0.00 0.00 0% 129.57 8,252.31 100%
01.08.00 REBOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.08.01 TARRAJEO PRIMARIO RAYADO CON CAL CEMENTO ARENA M2 51.47 6.920 356.17 0.00 0.00 0.00 0.00 0.00 0% 51.47 356.17 100%
01.08.02 TARRAJEO EN INTERIORES MORTERO 1:5 CEMENTO -ARENA M2 220.09 8.260 1,817.94 0.00 0.00 0.00 0.00 0.00 0% 220.09 1,817.94 100%
01.08.03 TARRAJEO EN COLUMNAS MORTERO 1:5 CEMENTO -ARENA M2 74.30 7.570 562.45 0.00 0.00 0.00 0.00 0.00 0% 74.30 562.45 100%
PRESUPUESTO AVANCES ó VALORIZACION
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION DEL PRESUPUESTO DE OBRA P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.08.04 TARRAJEO EN VIGAS MORTERO 1:5 CEMENTO -ARENA M2 94.82 8.260 783.21 0.00 0.00 0.00 0.00 0.00 0% 94.82 783.21 100%
01.08.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS M 71.70 6.380 457.45 0.00 0.00 0.00 0.00 0.00 0% 71.70 457.45 100%
01.08.06 BRUÑAS DE 1.00CM M 61.85 3.250 201.01 0.00 0.00 0.00 0.00 0.00 0% 61.85 201.01 100%
01.09.00 CIELORRASOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.09.01 CIELO RASO CON YESO SIN CINTAS L=1.00CM M2 203.61 12.920 2,630.64 0.00 0.00 0.00 0.00 0.00 0% 203.61 2,630.64 100%
01.10.00 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.10.01 FALSO PISODE 4" DE CONCRETO 1:10 M2 144.08 16.350 2,355.71 0.00 0.00 0.00 0.00 0.00 0% 144.08 2,355.71 100%
01.10.02 PISO DE LOSETA VENECIANA DE COLOR CLARO 30X30CM M2 132.83 31.980 4,247.90 0.00 0.00 0.00 0.00 0.00 0% 132.83 4,247.90 100%
01.10.03 VEREDAS RIGIDA DE CONCRETO F'c=140KG/CM2 E=10CM, PASM2 67.56 13.180 890.44 0.00 0.00 0.00 0.00 0.00 0% 67.56 890.44 100%
01.10.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 17.22 20.070 345.61 0.00 0.00 0.00 0.00 0.00 0% 17.22 345.61 100%
01.11.00 CONTRAZOCALO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.11.01 CONTRAZOCALO CEMENTO COLOREADO H=20CM M 54.80 2.450 134.26 0.00 0.00 0.00 0.00 0.00 0% 54.80 134.26 100%
01.11.02 CONTRAZOCALO CEMENTO COLOREADO H=30CM M 96.53 3.120 301.17 0.00 0.00 0.00 0.00 0.00 0% 96.53 301.17 100%
01.12.00 ZOCALO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.12.01 ZOCALO DE MAYOLICA DE 15 X15 CM COLOR DE 1RA M2 45.29 40.420 1,830.62 0.00 0.00 0.00 0.00 0.00 0% 45.29 1,830.62 100%
01.12.02 GUARDILLATO M 30.93 60.350 1,866.63 0.00 0.00 0.00 0.00 0.00 0% 30.93 1,866.63 100%
01.13.00 CUBIERTAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.13.01 COBERTURA CON PLANCHA GALVANIZADA M2 248.40 7.260 1,803.38 0.00 0.00 0.00 0.00 0.00 0% 248.40 1,803.38 100%
01.13.02 CUMBRERA DE PLANCHA DE ACERO GALVANIZADO M 20.70 6.550 135.59 0.00 0.00 0.00 0.00 0.00 0% 20.70 135.59 100%
01.14.00 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.14.01 PUERTA APANELADO DE 1 1/4" + MARCO CEDRO 2X3" M2 25.20 120.190 3,028.79 0.00 0.00 0.00 0.00 0.00 0% 25.20 3,028.79 100%
01.14.02 PUERTA APANELADO DE MADERA TORNILLO E0= 1/4" M2 5.48 113.210 620.39 0.00 0.00 0.00 0.00 0.00 0% 5.48 620.39 100%
01.14.03 MANPARA DE MADRA CEDRO DE PUCALLPA M2 3.78 94.930 358.84 0.00 0.00 0.00 0.00 0.00 0% 3.78 358.84 100%
01.14.04 MUEBLE DE ADMISION ARCHIVO UND. 1.00 120.190 120.19 0.00 0.00 0.00 0.00 0.00 0% 1.00 120.19 100%
01.15.00 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.15.01 VENTANA METALICA (INC. VENTANA M2) M2 24.23 93.610 2,268.17 0.00 0.00 0.00 0.00 0.00 0% 24.23 2,268.17 100%
01.16.00 CERRAJERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.16.01 BISAGRA CAPUCHINA DE 3 1/2" x 3 1/2" PZA. 49.00 10.330 506.17 0.00 0.00 0.00 0.00 0.00 0% 49.00 506.17 100%
01.16.02 CERRADURA ALPA PARA PUERTA EXTERIOR PZA. 2.00 21.980 43.96 0.00 0.00 0.00 0.00 0.00 0% 2.00 43.96 100%
01.16.03 CERRADURA PTA. INTERIOR PESTILLO MANIJA LLAVE GOAL 5 PZA. 8.00 26.980 215.84 0.00 0.00 0.00 0.00 0.00 0% 8.00 215.84 100%
01.16.04 CERRADURA PUERTA BAÑO SEG INT. PERMANIJA LLAVE GOALPZA. 5.00 26.980 134.90 0.00 0.00 0.00 0.00 0.00 0% 5.00 134.90 100%
01.16.05 MANIJA DE BRONCE PARA PUERTAS DE FIERRO UND. 2.00 8.000 16.00 0.00 0.00 0.00 0.00 0.00 0% 2.00 16.00 100%
01.16.06 MANIJA DE BRONCE PARA VENTANA DE FIERRO UND. 23.00 8.000 184.00 0.00 0.00 0.00 0.00 0.00 0% 23.00 184.00 100%
01.16.07 CERROJO DE FIERRO UND. 2.00 8.730 17.46 0.00 0.00 0.00 0.00 0.00 0% 2.00 17.46 100%
COSTO DIRECTO DEL PROYECTO S/ ### 0.00 0.00 0.00 0.00 77,933.09 100.00
GASTOS GENERALES 10% 7,793.31 0.00 0.00 0.00 7,793.31
PRESUPUESTO AVANCES ó VALORIZACION
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION DEL PRESUPUESTO DE OBRA P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
SUPERVISION 5% 3,896.65 0.00 0.00 0.00 3,896.65
COSTO TOTAL DEL PROYECTO S/ ### 0.00 0.00 0.00 89,623.05
###
MUNICIPALIDAD PROVINCIAL VALORIZACION MENSUAL DE OBRA Nº 02
CHUCUITO - JULI Al 31 de Agosto DEL 2018
OBRA: CONSTRUCCION DE PUESTO DE SALUD CENTRO POBLADO DE SICUYANI
DISTRITO: Zepita
PROVINCIA: Chucuito RESIDENTE: MILTHON
MODALIDAD: Administracion Directa FECHA: DE 01 DE AGOSTO A 31 DE AGOSTO 2018
COSTO DIRECTO: S/. 144,919.19 AVANCE FISICO ACUMULADO 0.40%

PRESUPUESTO AVANCES ó VALORIZACION


SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION DEL PRESUPUESTO DE OBRA P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
PUESTO DE SALUD
01.00.00 OBRAS PROVISIONALES
01.01.01. CARTEL DE IDENTIFICACION DEL PROYECTO UND. 1.00 1,500.000 1,500.00 0.50 750.00 0.50 750.00 1.00 1,500.00 100% 0.00 0.00 0%
01.01.02 ALMACEN PARA MATERIALES GLB 1.00 1,000.000 1,000.00 0.50 500.00 0.50 500.00 1.00 1,000.00 100% 0.00 0.00 0%
01.02.00 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01 LIMPIEZA DE TERRENO MANUAL M2 202.86 0.400 81.14 101.43 40.57 101.43 40.57 202.86 81.14 100% 0.00 0.00 0%
01.02.02 TRAZO Y REPLANTEO M2 202.86 0.910 184.60 101.43 92.30 101.43 92.30 202.86 184.60 100% 0.00 0.00 0%
01.03.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.01 EXCAVACION D ZANJAS Y ZAPATAS M3 84.47 7.850 663.09 42.24 331.54 42.24 331.58 84.48 663.13 100% 0.00 -0.04 0%
01.03.02 RELLENO CON MATERIALES PROPIO M3 14.86 22.860 339.70 2.97 67.94 11.89 271.76 14.86 339.70 100% 0.00 0.00 0%
01.03.03 REFINE NIVELACION Y COMPACTACION M2 202.82 0.200 40.56 40.56 8.11 162.26 32.45 202.82 40.56 100% 0.00 0.00 0%
01.03.04 ACARREO DE MATERIAL EXEDENTE HASTA PROM 30M M3 86.89 3.330 289.34 17.38 57.87 69.51 231.47 86.89 289.34 100% 0.00 0.00 0%
01.04.00. OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.01 CONCRETO CIMIENTO CORRIDO 1:10 + 30,0% PG M3 41.85 92.620 3,876.15 8.37 775.23 33.48 3,100.92 41.85 3,876.15 100% 0.00 0.00 0%
01.04.02 SOBRECIMIENTO DE CONCRETO 1:8 + 25% PM M3 41.85 124.110 5,194.00 8.37 1,038.80 33.48 4,155.20 41.85 5,194.00 100% 0.00 0.00 0%
01.04.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 8.88 51.910 460.96 0.89 46.10 3.55 184.38 4.44 230.48 50% 4.44 230.48 50%
01.06.00 ESTRUCTURA DE MADERA Y COBERTURAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.01 VIGUETAS DE MADERA DE 3"X6"X3.1M M 321.60 57.580 ### 0.00 160.80 9,258.86 160.80 9,258.86 50% 160.80 9,258.86 50%
01.06.02 FRISO DE MADERA DE 1"X4" M 41.40 69.770 2,888.48 0.00 20.70 1,444.24 20.70 1,444.24 50% 20.70 1,444.24 50%
01.07.00 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.07.01 MURO DE LADRILLO SOLAQUEADO KING-KONG ARCILLA DE M2 97.76 65.570 6,410.12 0.00 48.88 3,205.06 48.88 3,205.06 50% 48.88 3,205.06 50%
01.07.02. MURO DE SOGA LADRILLO KING-KONG CON CEMENTO AREN M2 129.57 63.690 8,252.31 0.00 64.79 4,126.16 64.79 4,126.16 50% 64.79 4,126.16 50%
01.08.00 REBOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.08.01 TARRAJEO PRIMARIO RAYADO CON CAL CEMENTO ARENA M2 51.47 6.920 356.17 0.00 25.74 178.09 25.74 178.09 50% 25.74 178.09 50%
01.08.02 TARRAJEO EN INTERIORES MORTERO 1:5 CEMENTO -ARENA M2 220.09 8.260 1,817.94 0.00 110.05 908.97 110.05 908.97 50% 110.05 908.97 50%
01.08.03 TARRAJEO EN COLUMNAS MORTERO 1:5 CEMENTO -ARENA M2 74.30 7.570 562.45 0.00 37.15 281.23 37.15 281.23 50% 37.15 281.23 50%
PRESUPUESTO AVANCES ó VALORIZACION
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION DEL PRESUPUESTO DE OBRA P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.08.04 TARRAJEO EN VIGAS MORTERO 1:5 CEMENTO -ARENA M2 94.82 8.260 783.21 0.00 47.41 391.61 47.41 391.61 50% 47.41 391.61 50%
01.08.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS M 71.70 6.380 457.45 0.00 35.85 228.72 35.85 228.72 50% 35.85 228.72 50%
01.08.06 BRUÑAS DE 1.00CM M 61.85 3.250 201.01 0.00 24.74 80.41 24.74 80.41 40% 37.11 120.61 60%
01.09.00 CIELORRASOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.09.01 CIELO RASO CON YESO SIN CINTAS L=1.00CM M2 203.61 12.920 2,630.64 0.00 81.44 1,052.26 81.44 1,052.26 40% 122.17 1,578.38 60%
01.10.00 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.10.01 FALSO PISODE 4" DE CONCRETO 1:10 M2 144.08 16.350 2,355.71 0.00 57.63 942.28 57.63 942.28 40% 86.45 1,413.42 60%
01.10.02 PISO DE LOSETA VENECIANA DE COLOR CLARO 30X30CM M2 132.83 31.980 4,247.90 0.00 53.13 1,699.16 53.13 1,699.16 40% 79.70 2,548.74 60%
01.10.03 VEREDAS RIGIDA DE CONCRETO F'c=140KG/CM2 E=10CM, PASM2 67.56 13.180 890.44 0.00 27.02 356.18 27.02 356.18 40% 40.54 534.26 60%
01.10.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 17.22 20.070 345.61 0.00 6.89 138.24 6.89 138.24 40% 10.33 207.36 60%
01.11.00 CONTRAZOCALO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.11.01 CONTRAZOCALO CEMENTO COLOREADO H=20CM M 54.80 2.450 134.26 0.00 21.92 53.70 21.92 53.70 40% 32.88 80.56 60%
01.11.02 CONTRAZOCALO CEMENTO COLOREADO H=30CM M 96.53 3.120 301.17 0.00 38.61 120.47 38.61 120.47 40% 57.92 180.70 60%
01.12.00 ZOCALO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.12.01 ZOCALO DE MAYOLICA DE 15 X15 CM COLOR DE 1RA M2 45.29 40.420 1,830.62 0.00 18.12 732.25 18.12 732.25 40% 27.17 1,098.37 60%
01.12.02 GUARDILLATO M 30.93 60.350 1,866.63 0.00 12.37 746.65 12.37 746.65 40% 18.56 1,119.98 60%
01.13.00 CUBIERTAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.13.01 COBERTURA CON PLANCHA GALVANIZADA M2 248.40 7.260 1,803.38 0.00 99.36 721.35 99.36 721.35 40% 149.04 1,082.03 60%
01.13.02 CUMBRERA DE PLANCHA DE ACERO GALVANIZADO M 20.70 6.550 135.59 0.00 8.28 54.23 8.28 54.23 40% 12.42 81.35 60%
01.14.00 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.14.01 PUERTA APANELADO DE 1 1/4" + MARCO CEDRO 2X3" M2 25.20 120.190 3,028.79 0.00 10.08 1,211.52 10.08 1,211.52 40% 15.12 1,817.27 60%
01.14.02 PUERTA APANELADO DE MADERA TORNILLO E0= 1/4" M2 5.48 113.210 620.39 0.00 2.19 248.16 2.19 248.16 40% 3.29 372.23 60%
01.14.03 MANPARA DE MADRA CEDRO DE PUCALLPA M2 3.78 94.930 358.84 0.00 1.51 143.53 1.51 143.53 40% 2.27 215.30 60%
01.14.04 MUEBLE DE ADMISION ARCHIVO UND. 1.00 120.190 120.19 0.00 0.40 48.08 0.40 48.08 40% 0.60 72.11 60%
01.15.00 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.15.01 VENTANA METALICA (INC. VENTANA M2) M2 24.23 93.610 2,268.17 0.00 9.69 907.27 9.69 907.27 40% 14.54 1,360.90 60%
01.16.00 CERRAJERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.16.01 BISAGRA CAPUCHINA DE 3 1/2" x 3 1/2" PZA. 49.00 10.330 506.17 0.00 19.60 202.47 19.60 202.47 40% 29.40 303.70 60%
01.16.02 CERRADURA ALPA PARA PUERTA EXTERIOR PZA. 2.00 21.980 43.96 0.00 0.80 17.58 0.80 17.58 40% 1.20 26.38 60%
01.16.03 CERRADURA PTA. INTERIOR PESTILLO MANIJA LLAVE GOAL 5 PZA. 8.00 26.980 215.84 0.00 3.20 86.34 3.20 86.34 40% 4.80 129.50 60%
01.16.04 CERRADURA PUERTA BAÑO SEG INT. PERMANIJA LLAVE GOALPZA. 5.00 26.980 134.90 0.00 2.00 53.96 2.00 53.96 40% 3.00 80.94 60%
01.16.05 MANIJA DE BRONCE PARA PUERTAS DE FIERRO UND. 2.00 8.000 16.00 0.00 0.80 6.40 0.80 6.40 40% 1.20 9.60 60%
MUNICIPALIDAD PROVINCIAL VALORIZACION MENSUAL DE OBRA Nº 02
CHUCUITO - JULI Al 30de NOVIEMBRE DEL 2009
OBRA: CONSTRUCCION DE PUESTO DE SALUD CENTRO POBLADO DE SICUYANI
DISTRITO: Zepita
PROVINCIA: Chucuito RESIDENTE: MILTHON
MODALIDAD: Administracion Directa FECHA: DE 01 A 30 DE OCTUBRE 2009
COSTO DIRECTO: S/. 144,919.19 AVANCE FISICO ACUMULADO 17.97%

PRESUPUESTO AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
PUESTO DE SALUD
01.00.00 OBRAS PROVISIONALES 2,500.00
01.01.01. CARTEL DE IDENTIFICACION DEL PROYECTO UND. 1.00 1,500.000 1,500.00 1.00 1,500.00 0.00 1.00 1,500.00 100% 0.00 0.00 0%
01.01.02 ALMACEN PARA MATERIALES GLB 1.00 1,000.000 1,000.00 1.00 1,000.00 0.00 1.00 1,000.00 100% 0.00 0.00 0%
01.02.00 TRABAJOS PRELIMINARES 265.74 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.02.01 LIMPIEZA DE TERRENO MANUAL M2 202.86 0.400 81.14 202.86 81.14 0.00 202.86 81.14 100% 0.00 0.00 0%
01.02.02 TRAZO Y REPLANTEO M2 202.86 0.910 184.60 202.86 184.60 0.00 202.86 184.60 100% 0.00 0.00 0%
01.03.00 MOVIMIENTO DE TIERRAS 1,332.69 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.03.01 EXCAVACION D ZANJAS Y ZAPATAS M3 84.47 7.850 663.09 0.00 0.00 0.00 0.00 0% 84.47 663.09 100%
01.03.02 RELLENO CON MATERIALES PROPIO M3 14.86 22.860 339.70 0.00 0.00 0.00 0.00 0% 14.86 339.70 100%
01.03.03 REFINE NIVELACION Y COMPACTACION M2 202.82 0.200 40.56 0.00 0.00 0.00 0.00 0% 202.82 40.56 100%
01.03.04 ACARREO DE MATERIAL EXEDENTE HASTA PROM 30M M3 86.89 3.330 289.34 0.00 0.00 0.00 0.00 0% 86.89 289.34 100%
01.04.00. OBRAS DE CONCRETO SIMPLE 9,531.11 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.04.01 CONCRETO CIMIENTO CORRIDO 1:10 + 30,0% PG M3 41.85 92.620 3,876.15 41.85 3,876.15 0.00 41.85 3,876.15 100% 0.00 0.00 0%
01.04.02 SOBRECIMIENTO DE CONCRETO 1:8 + 25% PM M3 41.85 124.110 5,194.00 41.85 5,194.00 0.00 41.85 5,194.00 100% 0.00 0.00 0%
01.04.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 8.88 51.910 460.96 8.88 460.96 0.00 8.88 460.96 100% 0.00 0.00 0%
01.05.00 OBRAS DE CONCRETO ARMADO 26,872.48 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.05.01 ZAPATAS, CONCRETO Fc= 175 KG/CM2 M3 9.00 292.350 2,631.15 9.00 2,631.15 0.00 9.00 2,631.15 100% 0.00 0.00 0%
01.05.02 ZAPATAS, DE ACERO FY= 4200 KG/CM2 KG 146.88 0.850 124.85 146.88 124.85 0.00 146.88 124.85 100% 0.00 0.00 0%
01.05.03. CONCRETO EN COLUMNAS FC= 210KG/CM2 M3 5.74 331.570 1,903.21 5.74 1,903.21 0.00 5.74 1,903.21 100% 0.00 0.00 0%
01.05.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 74.30 15.660 1,163.54 0.00 40.00 626.40 40.00 626.40 54% 34.30 537.14 46%
01.05.05 ACERO GRADO 60 EN COLUMNAS FY= 4200 KG/CM2 KG 1,116.14 5.400 6,027.16 0.00 500.00 2,700.00 500.00 2,700.00 45% 616.14 3,327.16 55%
01.05.06 CONCRETO EN VIGAS Fc= 210KG/CM2 M3 11.85 309.720 3,670.18 0.00 6.00 1,858.32 6.00 1,858.32 51% 5.85 1,811.86 49%
01.05.07 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 94.82 16.360 1,551.26 0.00 48.00 785.28 48.00 785.28 51% 46.82 765.98 49%
01.05.08 ACERO GRADO 60 EN VIGAS FY= 4200 KG/CM2 KG 1,339.08 5.450 7,297.99 0.00 700.00 3,815.00 700.00 3,815.00 52% 639.08 3,482.99 48%
01.05.08 VIGAS ACERO GRADO 60 EN VIGAS FY= 4200 KG/CM2 + DINT KG 433.82 5.770 2,503.14 0.00 233.00 1,344.41 233.00 1,344.41 54% 200.82 1,158.73 46%
PRESUPUESTO AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.06.00 ESTRUCTURA DE MADERA Y COBERTURAS 21,406.21 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.06.01 VIGUETAS DE MADERA DE 3"X6"X3.1M M 321.60 57.580 18,517.73 0.00 160.00 9,212.80 160.00 9,212.80 50% 161.60 9,304.93 50%
01.06.02 FRISO DE MADERA DE 1"X4" M 41.40 69.770 2,888.48 0.00 21.00 1,465.17 21.00 1,465.17 51% 20.40 1,423.31 49%
01.07.00 MUROS Y TABIQUES DE ALBAÑILERIA 14,662.43 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.07.01 MURO DE LADRILLO SOLAQUEADO KING-KONG ARCILLA DE M2 97.76 65.570 6,410.12 0.00 47.00 3,081.79 47.00 3,081.79 48% 50.76 3,328.33 52%
01.07.02. MURO DE SOGA LADRILLO KING-KONG CON CEMENTO AREN M2 129.57 63.690 8,252.31 0.00 69.00 4,394.61 69.00 4,394.61 53% 60.57 3,857.70 47%
01.08.00 REBOQUES ENLUCIDOS Y MOLDURAS 4,178.23 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.08.01 TARRAJEO PRIMARIO RAYADO CON CAL CEMENTO ARENA M2 51.47 6.920 356.17 0.00 0.00 0.00 0.00 0% 51.47 356.17 100%
01.08.02 TARRAJEO EN INTERIORES MORTERO 1:5 CEMENTO -ARENA M2 220.09 8.260 1,817.94 0.00 0.00 0.00 0.00 0% 220.09 1,817.94 100%
01.08.03 TARRAJEO EN COLUMNAS MORTERO 1:5 CEMENTO -ARENA M2 74.30 7.570 562.45 0.00 0.00 0.00 0.00 0% 74.30 562.45 100%
01.08.04 TARRAJEO EN VIGAS MORTERO 1:5 CEMENTO -ARENA M2 94.82 8.260 783.21 0.00 0.00 0.00 0.00 0% 94.82 783.21 100%
01.08.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS M 71.70 6.380 457.45 0.00 0.00 0.00 0.00 0% 71.70 457.45 100%
01.08.06 BRUÑAS DE 1.00CM M 61.85 3.250 201.01 0.00 0.00 0.00 0.00 0% 61.85 201.01 100%
01.09.00 CIELORRASOS 2,630.64 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.09.01 CIELO RASO CON YESO SIN CINTAS L=1.00CM M2 203.61 12.920 2,630.64 0.00 0.00 0.00 0.00 0% 203.61 2,630.64 100%
01.10.00 PISOS Y PAVIMENTOS 7,839.66 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.10.01 FALSO PISODE 4" DE CONCRETO 1:10 M2 144.08 16.350 2,355.71 0.00 0.00 0.00 0.00 0% 144.08 2,355.71 100%
01.10.02 PISO DE LOSETA VENECIANA DE COLOR CLARO 30X30CM M2 132.83 31.980 4,247.90 0.00 0.00 0.00 0.00 0% 132.83 4,247.90 100%
01.10.03 VEREDAS RIGIDA DE CONCRETO F'c=140KG/CM2 E=10CM, PASM2 67.56 13.180 890.44 0.00 0.00 0.00 0.00 0% 67.56 890.44 100%
01.10.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 17.22 20.070 345.61 0.00 0.00 0.00 0.00 0% 17.22 345.61 100%
01.11.00 CONTRAZOCALO 435.43 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.11.01 CONTRAZOCALO CEMENTO COLOREADO H=20CM M 54.80 2.450 134.26 0.00 0.00 0.00 0.00 0% 54.80 134.26 100%
01.11.02 CONTRAZOCALO CEMENTO COLOREADO H=30CM M 96.53 3.120 301.17 0.00 0.00 0.00 0.00 0% 96.53 301.17 100%
01.12.00 ZOCALO 3,697.25 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.12.01 ZOCALO DE MAYOLICA DE 15 X15 CM COLOR DE 1RA M2 45.29 40.420 1,830.62 0.00 0.00 0.00 0.00 0% 45.29 1,830.62 100%
01.12.02 GUARDILLATO M 30.93 60.350 1,866.63 0.00 0.00 0.00 0.00 0% 30.93 1,866.63 100%
01.13.00 CUBIERTAS 1,938.97 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.13.01 COBERTURA CON PLANCHA GALVANIZADA M2 248.40 7.260 1,803.38 0.00 0.00 0.00 0.00 0% 248.40 1,803.38 100%
01.13.02 CUMBRERA DE PLANCHA DE ACERO GALVANIZADO M 20.70 6.550 135.59 0.00 0.00 0.00 0.00 0% 20.70 135.59 100%
01.14.00 CARPINTERIA DE MADERA 4,128.21 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.14.01 PUERTA APANELADO DE 1 1/4" + MARCO CEDRO 2X3" M2 25.20 120.190 3,028.79 0.00 0.00 0.00 0.00 0% 25.20 3,028.79 100%
01.14.02 PUERTA APANELADO DE MADERA TORNILLO E0= 1/4" M2 5.48 113.210 620.39 0.00 0.00 0.00 0.00 0% 5.48 620.39 100%
01.14.03 MANPARA DE MADRA CEDRO DE PUCALLPA M2 3.78 94.930 358.84 0.00 0.00 0.00 0.00 0% 3.78 358.84 100%
01.14.04 MUEBLE DE ADMISION ARCHIVO UND. 1.00 120.190 120.19 0.00 0.00 0.00 0.00 0% 1.00 120.19 100%
01.15.00 CARPINTERIA METALICA 2,268.17 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.15.01 VENTANA METALICA (INC. VENTANA M2) M2 24.23 93.610 2,268.17 0.00 0.00 0.00 0.00 0% 24.23 2,268.17 100%
PRESUPUESTO AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.16.00 CERRAJERIA 1,118.33 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.16.01 BISAGRA CAPUCHINA DE 3 1/2" x 3 1/2" PZA. 49.00 10.330 506.17 0.00 0.00 0.00 0.00 0% 49.00 506.17 100%
01.16.02 CERRADURA ALPA PARA PUERTA EXTERIOR PZA. 2.00 21.980 43.96 0.00 0.00 0.00 0.00 0% 2.00 43.96 100%
01.16.03 CERRADURA PTA. INTERIOR PESTILLO MANIJA LLAVE GOAL 5 PZA. 8.00 26.980 215.84 0.00 0.00 0.00 0.00 0% 8.00 215.84 100%
01.16.04 CERRADURA PUERTA BAÑO SEG INT. PERMANIJA LLAVE GOALPZA. 5.00 26.980 134.90 0.00 0.00 0.00 0.00 0% 5.00 134.90 100%
01.16.05 MANIJA DE BRONCE PARA PUERTAS DE FIERRO UND. 2.00 8.000 16.00 0.00 0.00 0.00 0.00 0% 2.00 16.00 100%
01.16.06 MANIJA DE BRONCE PARA VENTANA DE FIERRO UND. 23.00 8.000 184.00 0.00 0.00 0.00 0.00 0% 23.00 184.00 100%
01.16.07 CERROJO DE FIERRO UND. 2.00 8.730 17.46 0.00 0.00 0.00 0.00 0% 2.00 17.46 100%
01.17.00 VIDRIOS CRISTALES Y SIMILARES 2,261.43 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.17.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO P2 260.50 5.800 1,510.90 0.00 0.00 0.00 0.00 0% 260.50 1,510.90 100%
01.17.02 VIDRIOS DOBLES NACIONALES P2 33.45 4.500 150.53 0.00 0.00 0.00 0.00 0% 33.45 150.53 100%
01.17.03 ESPEJO DE SOBREPONER P2 120.00 5.000 600.00 0.00 0.00 0.00 0.00 0% 120.00 600.00 100%
01.18.00 PINTURAS 3,727.07 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.18.01 PINTADO DE MURO INTERIOR +EXT. M2 456.59 3.660 1,671.12 0.00 0.00 0.00 0.00 0% 456.59 1,671.12 100%
01.18.02 PINTURA EN CIELO RASO + VIGA M2 203.61 3.660 745.21 0.00 0.00 0.00 0.00 0% 203.61 745.21 100%
01.18.03 PINTURA ESMALTE EN CARPINTERIA DE MADERA DE LETRINA M2 83.72 3.800 318.14 0.00 0.00 0.00 0.00 0% 83.72 318.14 100%
01.18.04 PINTURA ESMALTE EN CARPINTERIA METALICA M2 24.23 3.800 92.07 0.00 0.00 0.00 0.00 0% 24.23 92.07 100%
01.18.05 PINTURA ESMALTE EN CONTRAZOCALO M2 125.96 1.940 244.36 0.00 0.00 0.00 0.00 0% 125.96 244.36 100%
01.18.06 PINTURA BARNIZ EN MEZA DE ADMISION DE MADERA M2 16.50 4.870 80.36 0.00 0.00 0.00 0.00 0% 16.50 80.36 100%
01.18.07 PINTURA EN ZOCALO DE CEMENTO PULIDO M2 151.53 3.800 575.81 0.00 0.00 0.00 0.00 0% 151.53 575.81 100%
01.19.00 VARIOS 3,402.87 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.19.01 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 32.680 32.68 0.00 0.00 0.00 0.00 0% 1.00 32.68 100%
01.19.02 LOSA REPOSTERO DE CEMENTO Y MAYOLICA M2 2.60 879.350 2,286.31 0.00 0.00 0.00 0.00 0% 2.60 2,286.31 100%
01.19.03 BOTADERO DE CONCRETO Y MAYOLICA M 1.10 285.090 313.60 0.00 0.00 0.00 0.00 0% 1.10 313.60 100%
01.19.04 MUEBLE BAJO EN REPOSTERO DE MADERA M 5.20 148.130 770.28 0.00 0.00 0.00 0.00 0% 5.20 770.28 100%
01.20.00 APARATOS Y ACCESORIOS SANITARIOS 2,464.61 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.20.01 LAVADERO DE ACERO INOXIDABLE PZA. 3.00 120.000 360.00 0.00 0.00 0.00 0.00 0% 3.00 360.00 100%
01.20.02 INODORO TANQUE BAJO BLANCO PZA. 4.00 120.000 480.00 0.00 0.00 0.00 0.00 0% 4.00 480.00 100%
01.20.03 LAVATORIO DE LOZA BLANCO 1 LLAVE PZA. 5.00 100.000 500.00 0.00 0.00 0.00 0.00 0% 5.00 500.00 100%
01.20.04 DUCHA INCLUIDA 1 LLAVE INC. ACCESORIOS UND. 1.00 45.000 45.00 0.00 0.00 0.00 0.00 0% 1.00 45.00 100%
01.20.05 LLAVE BOTADERO UND. 1.00 36.890 36.89 0.00 0.00 0.00 0.00 0% 1.00 36.89 100%
01.20.06 PAPELERA DE LOSA BLANCA DE 13X15 PZA. 4.00 28.000 112.00 0.00 0.00 0.00 0.00 0% 4.00 112.00 100%
01.20.07 TOALLERA DE PLASTICO DE 24" DE COLOR PZA. 1.00 30.000 30.00 0.00 0.00 0.00 0.00 0% 1.00 30.00 100%
01.20.08 GANCHO BLANCO SIMPLE UND. 3.00 12.000 36.00 0.00 0.00 0.00 0.00 0% 3.00 36.00 100%
01.20.09 COLOCACION DE APARATOS SANITARIOS PZA. 12.00 9.160 109.92 0.00 0.00 0.00 0.00 0% 12.00 109.92 100%
01.20.10 COLOCACION DE ACCESORIOS SANITARIOS UND. 10.00 75.480 754.80 0.00 0.00 0.00 0.00 0% 10.00 754.80 100%
PRESUPUESTO AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.21.00 INSTALACIONES SANITARIAS 1,875.83 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.21.01 SALIDA DE DESAGUE PVC PTO 14.00 39.630 554.82 0.00 0.00 0.00 0.00 0% 14.00 554.82 100%
01.21.02 SALIDA DE VENTILACION PTO 4.00 39.630 158.52 0.00 0.00 0.00 0.00 0% 4.00 158.52 100%
01.21.03 RED COLECTORA PVC SAP 4" M 20.20 22.900 462.58 0.00 0.00 0.00 0.00 0% 20.20 462.58 100%
01.21.04 REGISTRO DE BRONCE DE 4" PZA. 4.00 36.430 145.72 0.00 0.00 0.00 0.00 0% 4.00 145.72 100%
01.21.05 REGISTRO DE BRONCE DE 2" PROVISION Y COLOCACION UND. 4.00 20.390 81.56 0.00 0.00 0.00 0.00 0% 4.00 81.56 100%
01.21.06 CAJA DE REGISTRO DE ALB DE 10" X 20" TAPA DE FºFº PZA. 2.00 220.870 441.74 0.00 0.00 0.00 0.00 0% 2.00 441.74 100%
01.21.07 SUMIDERO DE BRONCE DE 2" PROVISION Y COLOCACION UND. 1.00 30.890 30.89 0.00 0.00 0.00 0.00 0% 1.00 30.89 100%
01.22.00 SISTEMA DE AGUA FRIA 768.48 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.22.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAV 1/2" PTO 15.00 36.030 540.45 0.00 0.00 0.00 0.00 0% 15.00 540.45 100%
01.22.02 VALBULA DE COMPUERTA DE BRONCE 1/2" UND. 6.00 19.490 116.94 0.00 0.00 0.00 0.00 0% 6.00 116.94 100%
01.22.03 TUBERIA PVC SAP d= 1/2" M 9.20 2.880 26.50 0.00 0.00 0.00 0.00 0% 9.20 26.50 100%
01.22.04 TUBERIA PVC SAP CLASE 10 d= 3/4" M 3.00 4.900 14.70 0.00 0.00 0.00 0.00 0% 3.00 14.70 100%
01.22.05 TUBERIA PVC SAP d= 1/2" M 12.00 2.880 34.56 0.00 0.00 0.00 0.00 0% 12.00 34.56 100%
01.22.06 VALBULA DE COMPUERTA DE BRONCE 1/2" UND. 1.00 19.490 19.49 0.00 0.00 0.00 0.00 0% 1.00 19.49 100%
01.22.07 VALBULA DE CHECK 1" UND. 1.00 15.840 15.84 0.00 0.00 0.00 0.00 0% 1.00 15.84 100%
01.23.00 INSTALACIONES ELECTRICAS 2,513.27 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.23.01 SALIDA PARA CENTROS DE LUZ C/INTERUPTOR DE CONMUTAPTO 20.00 47.860 957.20 0.00 0.00 0.00 0.00 0% 20.00 957.20 100%
01.23.02 SALIDA PARA ECTRICIDAD BRAQUETE CON PVC PTO 3.00 52.710 158.13 0.00 0.00 0.00 0.00 0% 3.00 158.13 100%
01.23.03 SALIDA PARA TOMACORRIENTES DOBLE PTO 23.00 60.780 1,397.94 0.00 0.00 0.00 0.00 0% 23.00 1,397.94 100%
01.24.00 CANALIZACION Y TUBERIAS 98.01 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.24.01 TUBERIA PVC SELL 2" M 10.00 7.670 76.70 0.00 0.00 0.00 0.00 0% 10.00 76.70 100%
01.24.02 TUBERIA PVC SELL D=20MM M 7.40 2.880 21.31 0.00 0.00 0.00 0.00 0% 7.40 21.31 100%
01.25.00 TABLERO DE DISTRIBUCION 167.59 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.25.01 TABLERO GENERAL 2X15A, 2X20A,2X30A UND. 1.00 45.000 45.00 0.00 0.00 0.00 0.00 0% 1.00 45.00 100%
01.25.02 INTERUPTOR TERMOMAGNETICO MONOFACICO 2X30A PZA. 2.00 35.370 70.74 0.00 0.00 0.00 0.00 0% 2.00 70.74 100%
01.25.03 INTERUPTOR TERMOMAGNETICO MONOFACICO 2X20A PZA. 5.00 10.370 51.85 0.00 0.00 0.00 0.00 0% 5.00 51.85 100%
01.26.00 ARTEFACTOS 647.22 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.26.01 ARTEFACTOS PARA 02 FLUORECENTES INC. LAMPARAS PZA. 15.00 28.140 422.10 0.00 0.00 0.00 0.00 0% 15.00 422.10 100%
01.26.02 ARTEFACTOS BRAQUETE DIRIGIBLE 01 LAMPARA PZA. 3.00 28.140 84.42 0.00 0.00 0.00 0.00 0% 3.00 84.42 100%
01.26.03 ARTEFACTO TIPO WALLSCKTE, 01 LAMPARA PZA. 5.00 28.140 140.70 0.00 0.00 0.00 0.00 0% 5.00 140.70 100%
01.27.00 EQUIPAMIENTO BASICO 103.05 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.27.01 ARMARIO DE INSTRUMENTAL PZA. 1.00 103.05 103.05 0.00 0.00 0.00 0.00 0% 1.00 103.05 100%
01.28.00 INSTRUMENTAL 2,001.32 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.28.01 BALANZA DE PIE PARA ADULTOS PZA. 2.00 400.330 800.66 0.00 0.00 0.00 0.00 0% 2.00 800.66 100%
01.28.02 BALANZA PEDIATRICA PZA. 2.00 600.330 1,200.66 0.00 0.00 0.00 0.00 0% 2.00 1,200.66 100%
PRESUPUESTO AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION P.UNIT.
UND. METR. PRESUP. VALORIZ. VALORIZ. VALORIZ. VALORIZ.
METR. METR. METR. % METR. %
S/. S/. S/. S/. S/.
01.29.00 TANQUE SEPTICO 1,511.93 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.29.01 TRAZO Y REPLANTEO M2 3.00 0.910 2.73 0.00 0.00 0.00 0.00 0% 3.00 2.73 100%
01.29.02 EXCAVACION MANUAL M3 11.00 11.200 123.20 0.00 0.00 0.00 0.00 0% 11.00 123.20 100%
01.29.03 RELLENO CON MATERIALES PROPIO M3 6.05 3.660 22.14 0.00 0.00 0.00 0.00 0% 6.05 22.14 100%
01.29.04 ELIMINACION DE MATERIAL EXCEDENTE M3 3.91 1.540 6.02 0.00 0.00 0.00 0.00 0% 3.91 6.02 100%
01.29.05 CONCRETO Fc= 175 KG/CM2 M3 1.28 289.010 369.93 0.00 0.00 0.00 0.00 0% 1.28 369.93 100%
01.29.06 ACERO GRADO 60 EN COLUMNAS FY= 4200 KG/CM2 KG 88.10 5.450 480.15 0.00 0.00 0.00 0.00 0% 88.10 480.15 100%
01.29.07 ENCOFRADO Y DESENCOFRADO M2 15.06 20.070 302.25 0.00 0.00 0.00 0.00 0% 15.06 302.25 100%
01.29.08 RED DE COLECTOR TUBERIA PVC 4" M 25.00 5.680 142.00 0.00 0.00 0.00 0.00 0% 25.00 142.00 100%
01.29.09 CODO PVC SAL SP 4" UND. 2.00 12.370 24.74 0.00 0.00 0.00 0.00 0% 2.00 24.74 100%
01.29.10 RED P/COLUMNAS DE COLECTORA PVC SAL 2" M 1.00 4.770 4.77 0.00 0.00 0.00 0.00 0% 1.00 4.77 100%
01.29.11 UNION SIMPLE DE 2" (50MM) UND. 2.00 8.000 16.00 0.00 0.00 0.00 0.00 0% 2.00 16.00 100%
01.29.12 SOMBRERO PARA VENTILACION PVC DE 2" UND. 1.00 18.000 18.00 0.00 0.00 0.00 0.00 0% 1.00 18.00 100%
01.30.00 POZO PERCOLADOR 564.96 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.30.01 TRAZO Y REPLANTEO M2 1.45 0.910 1.32 0.00 0.00 0.00 0.00 0% 1.45 1.32 100%
01.30.02 EXCAVACION MANUAL M3 1.54 11.200 17.25 0.00 0.00 0.00 0.00 0% 1.54 17.25 100%
01.30.03 RELLENO CON MATERIALES PROPIO M3 4.40 3.660 16.10 0.00 0.00 0.00 0.00 0% 4.40 16.10 100%
01.30.04 ELIMINACION DE MATERIAL EXCEDENTE M3 3.58 1.540 5.51 0.00 0.00 0.00 0.00 0% 3.58 5.51 100%
01.30.05 LADRILLO KK DE ARCILLA UND. 4.40 0.060 0.26 0.00 0.00 0.00 0.00 0% 4.40 0.26 102%
01.30.06 FILTRO DE GRAVA M3 1.54 34.170 52.62 0.00 0.00 0.00 0.00 0% 1.54 52.62 100%
01.30.07 TAPA DE CONCRETO FC=175kg/cm2 M3 1.54 285.090 439.04 0.00 0.00 0.00 0.00 0% 1.54 439.04 100%
01.30.08 ACERO GRADO 60 EN COLUMNAS FY= 4200 KG/CM2 KG 6.03 5.450 32.86 0.00 0.00 0.00 0.00 0% 6.03 32.86 100%
01.31.00 PRUEBAS DE LABORATORIO 240.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.31.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPREUND. 10.00 15.000 150.00 0.00 0.00 0.00 0.00 0% 10.00 150.00 100%
01.31.02 DISEÑO DE MEZCLA DE CONCRETO UND. 1.00 90.000 90.00 0.00 0.00 0.00 0.00 0% 1.00 90.00 100%
01.32.00 FLETE TERRESTRE 1,500.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 0%
01.32.01 FLETE TERRESTRE GLB 1.00 1,500.00 1,500.00 0.00 0.00 0.00 0% 1.00 1,500.00 100%
COSTO DIRECTO DEL PROYECTO S/ 128,653.19 8,478.03 14,641.89 23,119.92 17.97 82,413.4 82.03
GASTOS GENERALES 13,266.00
SUPERVISION 3,000.00
COSTO TOTAL DEL PROYECTO S/ 144,919.19