Tools & Machineries Monthly Usage Statement
Sri Velayudha Samy SpinningMills (01.09.2019 to 30.09.2019)
TOOLS
Total Total
Starting Date No. of Consumed
S.No Particulars Unit Quantity A Closing Date C Rate/Month
B days E=D*A
D=C-B
1 Mixer M/c Hyd. Diesel Nos 1 1/9/2019 30/09/2019 30 30 10000.00
2 Mixer M/c Hyd Electrical Nos 1 1/9/2019 30/09/2019 30 30 10000.00
3 Above 2Hp Motor Nos 10 1/9/2019 30/09/2019 30 300 600.00
4 Below 2Hp Motor Nos 1 1/9/2019 30/09/2019 30 30 300.00
5 Hoist Lift Electrical Nos 2 1/9/2019 30/09/2019 30 60 10000.00
6 Vibrator (Electrical) Nos 6 1/9/2019 30/09/2019 30 180 1500.00
7 Welding M/c Nos 1 1/9/2019 30/09/2019 30 30 500.00
8 Water Tanker 6000 Lt Nos 1 1/9/2019 30/09/2019 30 30 1500.00
9 Levelling Instrument Nos 2 1/9/2019 30/09/2019 30 60 500.00
10 Dewatering Pump Nos 2 1/9/2019 30/09/2019 30 60 500.00
11 Cube Test M/c Nos 1 1/9/2019 30/09/2019 30 30 500.00
12 Earth Rammer (Diesel)(Mini Roller) Nos 1 1/9/2019 30/09/2019 30 30 2500.00
13 Total Station Nos 1 1/9/2019 30/09/2019 30 30 500.00
14 Genset 82.5 KVA Nos 1 1/9/2019 30/09/2019 30 30 30000.00
15 Vibrator Petrol Nos 1 1/9/2019 13/09/2019 13 13 1500.00
16 Wood Cutting M/c Nos 1 1/9/2019 30/09/2019 30 30 250.00
17 Floor Travel Machine Nos 1 1/9/2019 30/09/2019 30 30 500.00
Nos 1 1/9/2019 5/9/2019 5 5 500.00
Nos 1 19/09/2019 30/09/2019 12 12 500.00
18 Twin Air Blower Machine Nos 1 1/9/2019 30/09/2019 30 30 5000.00
19 Rod Cutting M/c Fixed Nos 1 1/9/2019 30/09/2019 30 30 5000.00
20 Water Tanker 20000 Lt Nos 1 1/9/2019 30/09/2019 30 30 2000.00
Total
Machinery
1 Ajax Self Loader Nos 1 1/9/2019 30/09/2019 30 30 200000.00
2 Volvo-140 BC Nos 1 1/9/2019 10/9/2019 10 10 90000.00
333.33 10000.00
333.33 10000.00
20.00 6000.00
10.00 300.00
333.33 20000.00
50.00 9000.00
16.67 500.00
50.00 1500.00
16.67 1000.00
16.67 1000.00
16.67 500.00
83.33 2500.00
16.67 500.00
1000.00 30000.00
50.00 650.00
8.33 250.00
16.67 500.00
16.67 83.33
16.67 200.00
166.67 5000.00
166.67 5000.00
66.67 2000.00
96483.33
Idel Days
5
6666.667 200000.00
3000.00 30000.00 4
3
400.00 12000.00
500.000 15000.00 4
3000.00 90000.00 25
2000.00 60000.00 18
1100.00 33000.00 1
1
3000.000 90000.00
1100.00 33000.00 15
563000.00
R.R. THULASI BUILDERS (I) PVT LTD.,
Tools & Machineries Monthly Usage Statement
ISRO Sri HariKotta (01.09.2019 to 30.09.2019)
TOOLS
Total No. Total
Starting Closing
S.No Particulars Unit Quantity A of days Consumed
Date B Date C
D=C-B E=D*A
Note: Signature
Machinery
Batching Plant -Ajax CRB-
1 30
Nos 1 1/9/2019 30/09/2019 30 30
2 Transit Mixer - TN33 AQ
9174 Nos 1 1/9/2019 30/09/2019 30 30
3 Transit Mixer - TN33 AL
1174 Nos 1 1/9/2019 30/09/2019 30 30
4 BOOM
PLACER/TN33BA2174 Nos 1 1/9/2019 30/09/2019 30 30
Note: Signature
Idel Days
2
33000.00 1100.00 33000.00
4
90000.00 3000.000 90000.00
4
90000.00 3000.000 90000.00
5
540000.00 18000.000 540000.00
6
100000.00 3333.33 100000.00
100000.00 3333.33 100000.00 7
120000.00 4000.00 108000.00 2
50000.00 1666.67 45000.00 5
1106000.00
R.R. Thulasi Builders (I) Pvt Ltd., E
Tools & Machinery Rent For the Month of
(01.09.2019 to 31.09.2019)
Total (01.09.19 to
S.No Site Name Tools Machinery
30.09.19)
1 Arthika Cotton 3000.00 0.00 3000.00
Construction of New
13 Hospital Building -punalur 119066.67 359400.00 478466.67
ISRO-Auditorium-
14 Nagarkovil 50300.00 0.00 50300.00