Documente Academic
Documente Profesional
Documente Cultură
DM STAMP:
Extract Air Air From Space Space Fresh Air Supply Air Space Extract Air Air From Space Space PHASE 2 PHASE 1
3 4
EXISTING
APPROVED
GENERAL NOTES:
NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF PNC ARCHITECTS AND MUST
NOT BE RETAINED,COPIED OR USED WITHOUT THE CONSULTANTS
CONSENT.
KEY/ADDITIONAL NOTES:
1.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
SPECIFICATIONS, SYSTEM ARCHITECTURE, DATA POINT SCHEDULES AND
OTHER RELEVANT MEP DRAWINGS.
2.THIS SCHEMATIC IS A DIAGRAMMATIC REPRESENTATION ONLY. DDC
LOCATION AND QUANTITY ARE INDICATIVE. EXACT QUANTITY AND LOCATION
TO BE CONFIRMED BY BMS VENDOR.
3.ALL QUANTITIES AND LOCATIONS OF EQUIPMENT CONNECTED TO BMS
ARE INDICATIVE ONLY. BMS VENDOR SHALL COORDINATE, CONSOLIDATE
AND VERIFY WITH SPECIFICATIONS, SYSTEM ARCHITECTURE AND OTHER
RELEVANT MEP DRAWINGS AND SPECIFICATIONS.
DPS
DPS DPS
Fresh Air Supply Air Space Extract Air Air From Space Space
H2
CONTROL PANEL
REVISIONS:
RESP.
NO. DATE BY DESCRIPTION CONSULT
0 23/02/17 T.C ISSUED FOR CONSTRUCTION PNCA
CLIENT:
Cooling coil
CONSULTANT:
CHEMICAL
Return Air CHILLERS PRESSURIZATION DOSING
Inlet Supply Air
Space
CHILLER UNIT SYSTEM SOBHA SAPPHIRE BUILDING,
8TH FLOOR , AL KHAIL ROAD,
PLANT architects
BUSINESS BAY, DUBAI
UNITED ARAB EMIRATES
P.O. BOX 122960 T: +971 4 4238054
MANAGER
PRIMARY PUMP SET CONTROL PANEL CONTROL PANEL
PROJECT:
CV FCU CONTROL BOX
T
SOBHA HARTLAND
CAT6 CABLE
GREENS - PHASE II
PLOT NO. 347-3283
AL MERKADH,
DUBAI,
TCP/IP
DRAWING TITLE:
BMS
PHASE 01
BMS CONTROL SCHEMATIC
SHEET 1 OF 3
15010-EE-APT0-3-BMS302
DM number: REV: 0