Sunteți pe pagina 1din 1

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY

PORTION THEREOF IS RESERVED BY THE ARCHITECTS

DM STAMP:

DPS DPS DPS


SITE KEY PLAN:

Extract Air Air From Space Space Fresh Air Supply Air Space Extract Air Air From Space Space PHASE 2 PHASE 1

3 4

EXISTING
APPROVED

CONTROL PANEL CONTROL PANEL CONTROL PANEL 2 1

KEY PLAN : NTS

GENERAL NOTES:
NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF PNC ARCHITECTS AND MUST
NOT BE RETAINED,COPIED OR USED WITHOUT THE CONSULTANTS
CONSENT.

2. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE


REFERRED TO THE RELEVANT CONSULTANTS DRAWINGS,
SPECIFICATIONS AND DETAILS.

3. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE


REGULATIONS AND LOCAL AUTHORITY REQUIREMENTS.

4. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL


DIMENSIONS AND LEVELS ON THE BUILDING SITE BEFORE COMMENCING
WITH ANY WORK.

5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS &


SPECIFICATIONS TO BE BROUGHT TO THE ATTENTION OF THE
CONSULTANT AND ARCHITECTS PRIOR TO ANY WORK BEING STARTED

6. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS


OFF DRAWINGS WILL NOT BE PERMITTED.

7. CONTRACTOR TO SUBMIT COORDINATED SHOP DRAWINGS FOR


ENGINEER'S APPROVAL PRIOR TO COMMENCEMENT OF WORK AT SITE.

KEY/ADDITIONAL NOTES:
1.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
SPECIFICATIONS, SYSTEM ARCHITECTURE, DATA POINT SCHEDULES AND
OTHER RELEVANT MEP DRAWINGS.
2.THIS SCHEMATIC IS A DIAGRAMMATIC REPRESENTATION ONLY. DDC
LOCATION AND QUANTITY ARE INDICATIVE. EXACT QUANTITY AND LOCATION
TO BE CONFIRMED BY BMS VENDOR.
3.ALL QUANTITIES AND LOCATIONS OF EQUIPMENT CONNECTED TO BMS
ARE INDICATIVE ONLY. BMS VENDOR SHALL COORDINATE, CONSOLIDATE
AND VERIFY WITH SPECIFICATIONS, SYSTEM ARCHITECTURE AND OTHER
RELEVANT MEP DRAWINGS AND SPECIFICATIONS.

DPS

DPS DPS

Extract Air Air From Space Space

Fresh Air Supply Air Space Extract Air Air From Space Space
H2
CONTROL PANEL

CONTROL PANEL CONTROL PANEL

ISSUED FOR CONSTRUCTION

THE RELATIVE ±0.000M PROJECT


LEVEL IS EQUAL TO ±3.461m (DMD)

REVISIONS:
RESP.
NO. DATE BY DESCRIPTION CONSULT
0 23/02/17 T.C ISSUED FOR CONSTRUCTION PNCA

CLIENT:

SOBHA SAPPHIRE BUILDING,


13TH FLOOR , AL KHAIL ROAD,
BUSINESS BAY, DUBAI
investments UNITED ARAB EMIRATES
P.O. BOX 125245 T: +971 4 4238064

Cooling coil
CONSULTANT:
CHEMICAL
Return Air CHILLERS PRESSURIZATION DOSING
Inlet Supply Air
Space
CHILLER UNIT SYSTEM SOBHA SAPPHIRE BUILDING,
8TH FLOOR , AL KHAIL ROAD,

PLANT architects
BUSINESS BAY, DUBAI
UNITED ARAB EMIRATES
P.O. BOX 122960 T: +971 4 4238054

MANAGER
PRIMARY PUMP SET CONTROL PANEL CONTROL PANEL
PROJECT:
CV FCU CONTROL BOX
T
SOBHA HARTLAND
CAT6 CABLE

GREENS - PHASE II
PLOT NO. 347-3283
AL MERKADH,
DUBAI,
TCP/IP

UNITED ARAB EMIRATES

DRAWING TITLE:
BMS
PHASE 01
BMS CONTROL SCHEMATIC
SHEET 1 OF 3

SCALE: SHEET DRAWN CHECK APPROVED


SIZE: BY: BY: BY:

1:100 A0 T.C S.A S.A IFC


Drawing number: DWG STAGE:

15010-EE-APT0-3-BMS302

DM number: REV: 0