Documente Academic
Documente Profesional
Documente Cultură
MATERIAL LABOR
CODE ITEM/DESCRIPTION QTY UNIT
1.00 UNIT COST AMOUNT 1.00 UNIT COST
I. EARTHWORKS
1 Excavation 33.40 m³ - - 160.00 160.00
2 Backfilling 4.40 m³ - - 160.00 160.00
3 Gravel Bedding 5.56 m³ 1,100.00 1,100.00 6,111.60 160.00 160.00
4 Polyethylene Sheet 14.52 m² 75.00 75.00 1,089.00 50.00 50.00
SUB - TOTAL ( EARTHWORKS )
II. CIVIL WORKS
1 Footings
Formworks 6.40 m² 200.00 200.00 1,280.00 220.00 220.00
Concrete 1.60 m³ 4,500.00 4,500.00 7,200.00 490.00 490.00
Rebar 18.95 kgs 40.00 40.00 757.92 7.00 7.00
GI Wire 0.63 kgs 80.00 80.00 50.53 7.00 7.00
2 Columns
Formworks 34.58 m² 200.00 200.00 6,916.00 220.00 220.00
Concrete 2.96 m³ 4,500.00 4,500.00 13,338.00 490.00 490.00
Rebar 403.64 kgs 40.00 40.00 16,145.52 7.00 7.00
GI Wire 13.45 kgs 80.00 80.00 1,076.37 7.00 7.00
3 Footing Tie Beams
Formworks 9.24 m² 200.00 200.00 1,848.00 220.00 220.00
Concrete 0.69 m³ 4,500.00 4,500.00 3,118.50 490.00 490.00
Rebar 135.36 kgs 40.00 40.00 5,414.40 7.00 7.00
GI Wire 4.51 kgs 80.00 80.00 360.96 7.00 7.00
4 Basement Slab - - -
Concrete 1.74 m³ 4,500.00 4,500.00 7,840.80 490.00 490.00
Rebar 55.44 kgs 40.00 40.00 2,217.60 7.00 7.00
GI Wire 1.85 kgs 80.00 80.00 147.84 7.00 7.00
5 Beams
Formworks 26.56 m² 200.00 200.00 5,312.00 220.00 220.00
Concrete 5.70 m³ 4,500.00 4,500.00 25,636.50 490.00 490.00
Rebar 460.95 kgs 40.00 40.00 18,438.00 7.00 7.00
GI Wire 15.37 kgs 80.00 80.00 1,229.20 7.00 7.00
6 Suspended Slab
Formworks 38.90 m² 200.00 200.00 7,779.20 220.00 220.00
Concrete 4.67 m³ 4,500.00 4,500.00 21,003.84 490.00 490.00
MATERIAL LABOR
CODE ITEM/DESCRIPTION QTY UNIT
1.00 UNIT COST AMOUNT 1.00 UNIT COST
Rebar 192.19 kgs 40.00 40.00 7,687.68 7.00 7.00
GI Wire 6.41 kgs 80.00 80.00 512.51 7.00 7.00
152,533.71
61,756.80
100,533.01
32,363.42
35,277.86
- 22,000.00 22,000.00
- 30,000.00 30,000.00
250.00 1,750.00 1,750.00
- 2,000.00 11,200.00
LABOR TOTAL UNIT
AMOUNT
AMOUNT COST
11,200.00
- 10,000.00 10,000.00
10,000.00
- 10,000.00 10,000.00
10,000.00
490,281.24
PROJECT : PROPOSED TWO (2) STOREY MAUSOLEUM
LOCATION : Ventura Memorial Park, San Carlos, Mexico, Pampanga
OWNER : Mr. Gilbert M. Mercado
SUBJECT : ITEMIZED COST BREAKDOWN
DATE : 2-May-19
3,847.22
379.90
4,080.33
940.90
9,248.34
1,843.20
5,587.20
606.34
38.40
10,350.29
12,916.42
818.04
2,419.96
4,331.52
274.33
-
6,084.46
1,774.08
112.36
19,893.92
14,750.40
934.19
16,298.98
6,150.14
389.51
105,573.73
AMOUNT
40,935.94
40,935.94
6,006.24
13,738.43
1,099.70
21,883.90
20,114.77
1,097.02
2,487.68
3,462.11
69,889.85
5,892.38
11,277.82
1,099.70
3,156.07
21,425.96
496.33
18,437.04
3,431.28
22,364.65
19,800.00
27,000.00
1,570.00
7,123.60
55,493.60
8,064.00
8,064.00
7,500.00
7,500.00
AMOUNT
10,000.00
10,000.00
350,496.08