Sunteți pe pagina 1din 61

Engenius Erectors Private Limited

….A Brief outline


Engenius Erectors Private Limited.

Formation

•Founded in 1978, as a Partnership firm Engenius Enterprises, the Firm focused it‟s
activities to cater to the growing need of Power.

•The dearth for a qualified construction group in power plants, by then, gave impetus
for expanding the organisation.

• With the participation of like minded engineers the Firm was converted to a Private
Limited Company “Engenius Erectors”.

•With „Quality in Service‟ as the motto, the company steadily grew to become a reliable
organisation in the Power Plant Industry.

.
THE ORGANISATION …..

Growth
The reputation built around by the team and the confidence of the clientele
towards the company made it possible to become a main contractor for
•BHEL, the leading power plant equipment supplier in India, for the
construction of Turbo-generator sets & auxiliaries of 200MW to 1000MW
capacity power plants.
•Siemens, a multinational power plant equipment supplier in India for the
construction of Turbo-generator sets & auxiliaries of 25MW to 60MW
capacity power plants.
•Nuclear Power Corporation of India, for the construction of 220MW to
500MW condensers and plant piping. Overhauling of their TG sets at
MAPS, RAPS, KGS and KAPS.
•Jaiprakash Associates Limited for the construction of Turbo-generator
sets & auxiliaries including air cooled condensers for their captive power
plants in India.
•Thermal power stations all over the country for maintenance and
renovation works.
THE ORGANISATION……

Meeting challenging quality requirements


•The intention was to grow and form a very stable and strong nucleus
comprising of professionals in the trade
•The consistent and regular orders from clients such as Nuclear Power
Corporation, BHEL etc where quality and safety are the bye-words speaks
about the organizations quality commitments

Current Status

•The projects executed so far and the present assignments on hand give
testimony to the skills of the highly experienced field personnel
.
•A team consisting of 70 highly experienced engineers and field personnel
qualified in their respective trades.

• A team excellently trained to meet stringent quality control and safety


requirements.
THE ORGANISATION …..

First in the field

•Construction of the largest capacity axial flow turbo-blowers in


India, for Vishakapatnam Steel Plant at Visakhapatnam

•Construction of the first combined cycle gas based power station in


India for Ahmedabad Electricity Company Ltd. at Vatva

•Execution of the first Life Extension Programme in India, for Power


Plant Equipment at Neyveli Lignite Power Corporation’s Thermal
Station I, Neyveli, Tamilnadu.
•First BHEL 600 MW Stator lifted in very short time at North Chennai
Thermal Power station, North Chennai, Tamilnadu.
THE ORGANISATION …..

Some challenging assignments...

At Neyveli Thermal Station- 1 in association with Technoprom Exports,


Russia
1. In-situ rewinding of 50 MW turbo-generator rotor,
2. In-situ repair, replacement of stator core packets for 100 MW generator stator
at Neyveli Thermal Station- 1,
3. Repair of rotor discs and re-blading of 100 MW HP Turbine rotor in-situ.

At Karnafauli Hydro Station, Bangladesh, in association with ABB Sae Sadelmi,


Italy
1. Complete changing of generator core & rewinding in-situ for 50 MW hydro-
generator
Key Members…..

A. H. Mohajir, Managing Director


An electrical engineer with 40 years of experience in Power
Plant Erection and Maintenance.

P. V. Sai, Director
A mechanical engineer with considerable experience in
engineering and design of plant rotating parts.

Javeed Mehkri,Director
A commerce graduate with wide experience in marketing
Heavy Electrical Equipment.

K.Ramalingam, General Manager


A diploma engineer in electrical with 37 years of experience in
Power Plant Erection & Maintenance .
Key Members…..

G. Balasubramanium, Senior Deputy Manager


A Graduate with 26 years of experience in Power Plant Erection and
Maintenance at various projects sites.

Imran Mohajir, Sr.Executive Management


A Post-Graduate with 15 years of experience in planning and
execution.

D. Easter Raj, Manager (F & A)


A Post Graduate with 16 years of experience in Finance and
Administrative Operations.
Key Members…..

R. Nanthakumaran,Manager (Constructions)
A Graduate with 22 years of experience in Power Plant
Erection and Maintenance at various projects sites.

Dexter Horne, Manager (Constructions)


A Post-Graduate with 15 years of experience in planning and
execution.

R. Anandakrishnan, Manager (Constructions)


A Diploma in Engineering with 20 years of experience in
Power Plant Erection and Maintenance.

S.Upendra Kumar, Manager (Constructions)


A Diploma in Engineering with 18 years of experience in
Power Plant Erection and Maintenance.
.
Key Members…..

Akshay Kumar Ojha, Manager (Constructions)


A Graduate with 12 years of experience in Power Plant
Erection and Maintenance.

K.V.Abraham, Manager (Constructions)


A Diploma in Engineering with 34 years of experience in
Power Plant Construction.

K. Tholkappian, Manager (Constructions)


A Diploma in Engineering with 16 years of experience in
Power Plant Erection and Maintenance.

.
Our Current Assignments …

•.Erection of 660 MW STG including TG Cycle Piping at Bara, Allahabad.


• Erection of 600 MW STG at Derang, Angul, Orissa.
• Erection of 500 MW STG and CCW Piping of Unit I&II at Tuticorin.
• Erection of 500 MW STG at BHAVINI Nuclear PFBR, Kalpakkam, Tamilnadu.
•Erection of 500 MW Piping at BHAVINI Nuclear PFBR, Kalpakkam, Tamilnadu.
• Erection of 150 MW STG of Unit I&VI at Lapanga, Sambalpur, Orissa.
• Erection of 1000 MW Secondary Cycle Piping of Unit II at Kudankulam Nuclear
TPP ,Tamil Nadu
Quality Policy

To offer services that fulfills the customer’s requirements first time, on time, every
time.

Towards this end following are our objectives:

• To continuously review and maintain an effective Quality Assurance Programme


• To standardized all our internal activities.
• To deploy qualified and trained personnel.
• To inculcate Safety and Quality consciousness by the total involvement of all the
employees.
Health Safety & Environment Policy

EEPL Management is committed to the following safety aspects:

• Management of EEPL is committed for Better Health, Safety & Environmental in all
facts of Business and Project activities.
• Compliance to legislation and regulations.
• Setting objectives and targets to eliminate control or minimize risks due to occupational
hazards.
• Erection To develop HSE awareness, the management provides information, instructions,
training and education to employees to achieve better in HSE.
• Selecting proper personnel equipments.
List of Erection Works Executed
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

1. Erection, Testing & Commissioning 235 MW GE BHEL for DAE Jan ’79 Jul ’81
of TG set & Auxiliaries including / BHEL
Piping at MAPS, Kalpakkam

2. Erection, Testing & Commissioning 2 x 30 MW BHEL for Feb ’80 Sep ’83
of TG sets & Auxiliaries including SIEMENS / BSP
Piping at Bhilai Steel Plant BHEL

3. Erection , Testing & Commissioning 18MW BHEL for BSP May ’81 Nov ’83
of TG set & Auxiliaries including SIEMENS /
Piping at Bhilai Steel Plant BHEL

4. Erection, Testing & Commissioning 110 MW BHEL for Nov ’81 Feb ’83
of TG set & Auxiliaries including BHEL OSEB
Piping Unit I, VI at Talcher, Thermal
Station

5. Erection, Testing & Commissioning 210 MW BHEL for Oct ’83 Mar ’85
of TG set & Auxiliaries incl. Piping & KWU / KPCL
Inst. Unit I at RTPS, Raichur. BHEL

6 Erection, Testing & Commissioning 8 & 18 MW TNPL Jun ’84 Oct ‘84
of TG sets & Auxiliaries at TNPL, SIEMENS
Karur
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

7. Erection, Testing & Commissioning 3063 Nm3 / BHEL for BSP Sep ’85 Mar ’87
of TB set & Auxiliaries including Minute
Piping at Bhilai Steel Plant MAN-GHH

8. Erection, Testing & Commissioning 3063 Nm³ / BHEL for Sep ‘85 Mar ’87
of Electrical & Instrumentation for Minute BSP
TB Set & Aux. at BSP Bhilai MAN-GHH

9. Erection, Testing & Commissioning 2 x 6067 BHEL for VSP Jul ’87 Mar ’89
of TB sets & Auxiliaries including Nm³/ Min.
Piping Unit I & II, at Vizag Steel DEMAG
Plant

10. Erection, Testing & Commissioning 330 Tonne / BHEL for VSP Jul ’87 Dec ‘89
of 7 Nos. BFP & Auxiliaries at Vizag Hrs. each
Steel Plant BHEL

11. Erection, Testing & Commissioning 500 MW BHEL for Sep ’87 Sep ’88
of Power Cycle Piping Unit I at KWU / NTPC
Ramagundam Super Thermal BHEL
Station

12. Erection, Testing & Commissioning 210 MW BHEL for Oct ’87 Mar ‘89
of TG set & Auxiliaries including RUSSIAN / TNEB
Piping for Unit III, MTPS Mettur BHEL
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

13. Erection, Testing & Commissioning BHEL BHEL for Sep ’88 Feb ’90
of 6 Nos. Cooling Water Pump at TNEB
MTP, Mettur

14. Erection, Testing & Commissioning 210 MW BHEL for Nov ‘88 Feb ’90
of TG set & auxiliaries for Unit IV at RUSSIAN / TNEB
MTPS Mettur BHEL

15. Erection, Testing & Commissioning 6067 Nm3/ BHEL for VSP Apr ‘89 Sep ’90
of TB set incl. Piping and Insulation Minute.
of Unit III, at Vizag Steel Plant, DEMAG
Vizag

16. Erection, Testing & Commissioning BHEL BHEL for NLC May ’89 Sep ’90
of BFP, CEP & Piping for Unit IV at
TS-II, NLC, Neyveli

17. Erection, Testing & Commissioning 210 MW BHEL for Sep ’89 Mar ‘91
of Unit III TG set and auxiliaries KWU / KPCL
including Piping at RTPS, Raichur BHEL

18. Erection, Testing & Commissioning 2 x Fr. 6 BHEL for Nov ’89 Oct ’91
of GTG sets & STG set at AECO, GTG & 1 X AECO
Vatwa, Ahmedabad 33 MW
STG
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

19. Erection, testing & Commissioning 40 TPH SPB-PC Dec ’89 Apr ’90
of 40 TPH Thermax Boiler at SPB, Babcock
Erode

20. Erection, Testing & Commissioning 210 MW BHEL for Feb ’90 Feb ’92
of Unit – IV TG set & Aux. Equip- KWU / TNEB
ment incl. Piping at TTPS. Tuticorin BHEL

21. Erection, Testing & Commissioning 3 MW EMCONS for May ‘90 Jun ’90
of 3 MW TG at Ponni sugars, Erode TRIVENI SPB

22. Erection, Testing & Commissioning 210 MW BHEL for NLC Oct ’90 Sep ’92
of Unit-VI & VII TG set & Aux. KWU/
Equipment including Piping at TS II, BHEL
NLC, Neyveli.

23. Erection Testing & Commissioning 3 x Fr. 6 BHEL for GEB May ‘91 Dec ’93
of GTG sets & STG set at Utran, GTG &
Surat 45MW STG

24. Erection, Testing & Commissioning 210 MW BHEL for Jan ’93 Jun ’95
of Unit-II TG set & Aux. Equipment KWU / TNEB
incl. Piping at NMTPS, Madras BHEL
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

25. Erection, Testing & Commissioning 210 MW BHEL / MHI Jun ’93 Sep ‘94
of Unit-IV TG set & Aux. Equip- MHI, Japan for KPCL
ment incl. Piping at RTPS, Raichur

26. Supply of Manpower for CBPS / 2 x Fr. 6 BHEL for Jul ’93 Jan ’94
PGPP Malaysia GTG sets TENEGA
BHEL

27. Erection, Testing & Commissioning 80 MW BHEL for Tata Nov ’93 Mar ’95
of Generator, Condenser & Aux. BHEL Power
Incl. Piping at TATA Power Ltd.
Trombay

28. Erection, Test & Commissioning of 235 MW BHEL for NPC Apr ‘94 Sep ’00
Unit-I TG set & aux. Equipment incl. BHEL
Piping at KAIGA

29. Erection of Sulphur smelter Sulphuric NICCO for Apr ’94 May ’94
Agitator, IAT & DT Acid Circulation Acid Plant CFL
pumps at Coromandel Fertilizers
Ltd., Visakhapatnam

30. Erection of Structures & Mechanical Lurgi Onaway for Jul ’94 Jul ’95
works for Induration Plant at Pelletisation ESSAR Ltd.
ESSAR Pelletisation Plant, Vizag Plant
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

31. Erection, Testing & Commissioning 1x Fr. 6 BHEL for RIL Sep ’94 Apr ’95
of GTG set, Chimney & Piping at GTG GE /
Reliance Industries Patalganga BHEL

32. Erection, Testing & Commissioning 10.5 MW BHEL for Dec ’94 Jan ‘96
of TG set & Aux. Equipment incl. BHEL TNPL
Piping at KAGITHAPURAM

33. Fabrication & Erection of Unit I & II 2 x 235 MW BHPV for NPC Dec ’94 Mar ’99
Condensers at NPC, KAIGA BHPV

34. Erection, Testing & Commissioning 235 MW BHEL / IPCL Apr ’95 Oct ’99
of Unit II TG set & Aux. Equipment BHEL for NPC
including piping at NPC. KAIGA

35. Erection, Testing of Compressors, DEMAG & BHPV for May ‘95 May ’97
Static Equipment, LP Pre-heater & BHPV ONGC
Chimney at CSU Project, Phase II,
ONGC Gandhar Petro Complex

36. Erection & Commissioning of MEA 2 MW CFL May ‘95 May ‘95
pump with drive Turbine & Aux. At
Coromandel Fert. Ltd, VIZAG
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

37. Erection & Commissioning of Main 12 MW J.K. Corp. Ltd. Jun ’95 Dec ’95
Steam Piping at JK Corporation,
Rayagada, Orissa

38. Erection, Testing & Commissioning 250 MW BHEL for Sep ’95 Jun ’98
of Unit I TG set & Aux. Equipment KWU / RESB
incl. Piping at Suratgarh BHEL

39. Erection of Ball mill for Phosphoric Phosph. CFL Sep ‘95 Nov ’95
Acid Plant at CFL, Vizag Plant

40. Erection, Testing & Commissioning 1 x Fr. 6 BHEL for Sep’ 96 Dec ’97
of GTG set and STG set at ONGC- 1 x 12 MW ONGC
CPF, Gandhar

41. Erection, Testing & Commissioning 210 MW BHEL for GEB Sep ’96 Mar ’99
of Unit VII TG set, Auxiliaries & KWU /
piping at WTPS Wanakbori BHEL

42. Erection, Testing & Commissioning 1x 15.5 MW BHPV for Sep ’96 Jun ’98
of STG sets Auxiliaries. & Piping at 1x 25.6 MW BHEL/GAIL
GAIL UPPC, Pata (UP)
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

43. Erection, Testing & Commissioning 6 x 30 MW BHEL for RIL Feb ‘97 Dec ’98
of GTG sets & auxiliaries at Frame 6
Reliance Industries Ltd., Jamnagar

44. Erection, Testing & Commissioning 2 x 130 MW BHEL for Jun ’97 Jun ’99
of Unit I & II TG sets & auxiliaries at JTCPL
JTPCL, Bellary, Karnataka

45. Erection, Testing & Commissioning 2 x 10 MW THERMAX for Sep ’97 Dec ’98
of 27 MW Combined Cycle Power 1 x 7 MW Arvind Mills
Plant at Santej, Gujarat

46. Erection, Testing & Commissioning 2 x 10 MW THERMAX for Nov ’97 Mar ’99
of 27 MW Combined Cycle Power 1 x 7 MW Arvind Mills
Plant at Naroda, Gujarat

47. Erection, Testing & Commissioning 2 x 110 MW BHEL for Apr ’98 Feb ’99
of GTG sets & auxiliaries at Frame 9 NTPC
Kayankulam CCPP, Kerala

48. Erection, Alignment, Welding and 2 x 130 MW EOIL for Mar ‘98 Mar ’99
Testing of control valves at JTPCL, JTPCL
Bellary, Karnataka for Energy
Overseas International Inc.
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

49. Erection and Commissioning of 80P 4 MW Elliot CICB Sep ’98 Oct ’98
Blower, Drive Turbine and Aux. Incl. Make For CFL
Piping and Electrical at Coromandel
Fertilisers Ltd., Vizag

50. Erection, Testing & Commissioning 250 MW BHEL for Jan ’99 Mar ’00
of Unit 2 TG set & Aux. Equipment KWU / RESB
incl. Piping at Suratgarh BHEL

51. Erection, Testing & Commissioning GTG BHEL for Jun ’00 Mar ’01
of 1 No. GTG Fr-6, 2 Nos. Gas Frame-6 TNEB
compressors & their aux. Incl. And Gas
Piping at Kovilkalappal CCPP, compressor
Mannargudi, Tamilnadu

52. Erection, Testing & Commissioning 38 MW BHEL for Jun ’00 Mar ’01
of 1 No. 38, MW STG & its Aux. STG TNEB
Incl. Piping at Kovilkalappal CCPP,
Mannargudi, Tamilnadu.

53. Erection, Testing & Commissioning 24.62 MW BHEL for Oct ‘00 Apr ’01
of 24.62 MW STG at TNPL, Karur, STG TNPL
Tamilnadu
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

54. Erection, Testing & Commissioning 2 x 250 MW BHEL for Sep ’00 Unit 3 Mar ’02
of Unit 3 & 4 TG sets & Aux. RSEB Unit 4 May ’02
Equipments incl. Piping at
Suratgarh TPS, Rajasthan

55. Erection, Testing & Commissioning 500 MW BHEL for Feb ’01 Sep ’02
of Unit 2 TG set & Auxiliaries NTPC
Equipment Incl. Piping at Simhadri
TPS, Visakhapatnam, A P

56. Material Handling, Fabrication, 500 MW BHEL for Feb ‘01 Mar’06
Erection & commissioning of Unit- 3&4 NTPC
Secondary Steam Piping at Tarapur
Atomic Power Project, Tarapur

57. Fabrication, Erection, Assy. & 500 MW BHPV for Feb ’01 Jan’06
Testing of Steam Condensers 2 Unit- 3 NPCIL
Nos. at Tarapur Atomic Project

58. Supply, Erection of Power Cycle 12.5 MW BSES for GIL Dec ’02 May ‘03
Piping and 12.5 MW STG Sets &
Aux. Equipment at Grasim
Industries Ltd., Ariyalur, Tamil Nadu

59. Erection, Testing & Commissioning 500 MW BHEL for May ’03 Feb ‘05
of Unit-3 TG set & Aux. Equipment NTPC
Piping at Rihand STPP, UP
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

60. Erection, Testing & Commissioning 500 MW BHEL for May ’03 Feb ‘05
of Unit-6 TG set & Aux. Equipment NTPC
incl. Piping at Kaniha Super
Thermal Power Plant, Orissa

61. Revamping & Commissioning of 3 x 4 MW MISL, Orissa Nov ‘04 Dec ’07
Unit 1, 2 & 3 Turboblowers & Unit 2 DEMAG &
STG at Mideast Integrated Steel 4.8 MW TG
Ltd., Jajpur, Orissa Kirloskar

62. Supply of pipes, fabrication, 500 MW Nuclear Power Jan’ 05 May’05


erection and welding of ASDV Corp. Ltd.
piping including supports in Unit 4
at Tarapur Atomic Power Plant

63. Erection of 27 MW Turbogenerator 27 MW Siemens for Jan ‘05 Jul ‘05


Set at Birla Corp. Chanderia Siemens Birla Corp.
Cement Plant, Chittaurgarh,
Rajasthan

64. Erection of 27 MW Turbogenerator 27 MW Siemens for Mar ‘05 Sep‘05


Set at Birla Corp. Satna Cement Siemens Birla Corp.
Plant, Madhya pradesh
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

65. Fabrication, Erection, Testing & 2x 220 MW Nuclear Power Feb’ 05 Unit 5- Nov’ 09
Commissioning of 2 Nos. Steam Corp. Ltd. & Unit 6 – Mar’
Condensers with air Evacuation 10
System & LP extraction Piping of
Unit 5 & 6 at Rajasthan Atomic
Power Project, Kota, Rajasthan

66. Erection of Turbogenerator set with 38.5 MW Jayaprakash Oct’05 Sep’06


Air cooled & Water cooled Enterprises
Condenser for Captive Power Ltd.
Plant- III at Jaypee Cement Rewa,
Madhya Pradesh

67. Erection, Testing and 4 MW Navdurga Oct’05 Mar’06


commissioning of TG set & Triveni Fuels Pvt. Ltd.
Auxiliaries at Navdurga Fuels Pvt.
Ltd., Raigarh, Chattisgarh.

68. Erection, Testing & Commissioning 2x 235 MW BHEL for Oct’05 Unit-3 : Apr’07
of Unit-3 & 4 TG set & Aux. Nuclear Power Unit-4: Dec’10
Equipment incl. Piping at Kaiga Corp. Ltd.
Atomic Power Plant, Karnataka
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

69. Supply of pipes, fabrication, 500 MW Nuclear Power Nov’ 05 Jan’06


erection and welding of ASDV Corp. Ltd.
piping including supports in Unit 3
at tarapur Atomic power Plant

70. Erection, Testing & Commissioning 2x 30 MW JSW Power Jan’06 Dec’06


of 2 Nos. of Turbogenerator Set at Siemens Pvt. Ltd.
SISCOL, Mecheri, Salem Dist.,
Tamilnadu

71. Erection, Testing & Commissioning 30 MW Siemens for Feb ‘06 Dec ‘06
of Turbogenerator Set at Aryan Siemens Aryan Coal
Coal Plant site, Chakabura, Korba Pvt. Ltd.
Dist., Chattisgarh

72. Erection, Testing & Commissioning 33 MW Vandana Feb’06 Jan’07


of Turbogenerator Set at Vandana Siemens Global Ltd.
Global Ltd., Raipur Dist.,
Chattisgarh

73. Erection, Testing & Commissioning 2x 125 MW BHEL for JSL May’06 Nov’08
of Unit-1 & 2 TG set & Aux.
Equipment incl. Piping at Jindal
Stainless Ltd., Duburi, Orissa
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

74. Erection & commissioning of 2 x 4 30,000 T HSL for Good Sep’ 06 Aug’07
Nos. of Deck Cranes on Hull No. Bulk Earth Maritime
11115 & 11116 (MV Good Carriers Ltd., Chennai
Providence & MV Good Princess)
at Hindustan Shipyard Ltd.,
Visakhapatnam

75. Erection, Testing & Commissioning 2x 250 MW BHEL for Jan’07 UNIT-1: Apr’08
of Unit-1 & 2 TG set & Aux. NTPC SAIL UNIT-2: Mar’09
Equipment incl. Piping at NTPC- Pvt. Ltd.
SAIL Power Pvt. Ltd., Bhilai,
Chattisgarh

76. Erection & commissioning of 4 Nos. 30,000 T HSL for Good Jan’ 07 Mar ‘07
of Deck Cranes on Hull No. 11117 Bulk Carrier Earth Maritime
(MV Good Pacific) at Hindustan Ltd., Chennai
Shipyard Ltd., Visakhapatnam

77. Erection, Testing & Commissioning 35MW Jaiprakash Jan’08 Dec’08


of Turbogenerator Set with Siemens Enterprises
associated Auxiliaries, piping, Ltd.
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Sidhi, Madhya
Pradesh
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

78. Erection, Testing & Commissioning 2x 40 MW JSW Steel Ltd Apr’08 Sep’08
of Unit-1 & 2 Motor Driven Turbo- MAN Turbo
Blowers & Aux. Equipment at JSW & ABB
Steel Ltd., Bellary, Karnataka Motor

79. Erection, Testing & Commissioning 27MW Jaiprakash Apr’08 Feb’09


of Turbogenerator Set with Siemens Enterprises
associated Auxiliaries, piping, Ltd.
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Dalla, Uttar
Pradesh

80. Erection, Testing & Commissioning 38MW Japrakash May’08 Mar’09


of Turbogenerator Set with Enterprises
associated Auxiliaries, piping, Ltd.
Aircooled & water cooled
condensers at Captive Power Plant,
Jaypee Cement Ltd., Chunnar Uttar
Pradesh

81. Erection, Testing & Commissioning 2x 250 MW BHEL for NLC Jul’08 Both the Units
of Unit 1 & 2 Turbogenerator Set Ltd. Commissioned
with Auxiliaries & associated piping
at TPS-II , Neyvelli Lignite
Corporation Ltd., Neyvelli,
Tamilnadu
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

82. Transportation, Erection, Testing & 2 x 1000 BHEL for Oct ’08 In progress
Commissioning of Piping with MW NPCIL
associate hangers and supports, Nulcear
static equipment and its auxiliaries
of Unit 2 at Kudankulam Nuclear
Power Plant, Tiruneveli Dist.
Tamilnadu

83. Transportation, Erection, Testing & 2 x 250 MW BHEL for NLC Oct’08 Unit 1-Mar 11
Commissioning of HP/PCP & LP Unit 2-
Piping incl. supply and application Commissioned
of protective wrapping, coating for
CW piping, anti-corrossive painting
etc. for Unit 1 & 2 Turbogenerator
at TS-II Expansion of Neyveli
Lignite Corp. Ltd., Tamilnadu

84. Erection & commissioning of VMFN L & T Powai Jan’09 Feb’09


Project at National Aeronautical for NAL
Lab., Bengaluru, Karnataka
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

85. Erection & commissioning of 4 Nos. 30,000 T HSL for Good Feb’ 09 Jul’09
of Deck Cranes on Hull No. 11118 Bulk Carrier Earth Maritime
(MV Good Piligrim) at Hindustan Ltd., Chennai
Shipyard Ltd., Visakhapatnam

86. Erection, Testing & Commissioning 2 x 500 MW BHEL for Mar’09 Unit 3-Mar 10
of Steam Turbine, Generator, NTPC Ltd. Unit 4-Dec’11
Pumps, Piping & Other Auxiliaries
of Unit-3 & 4 At NTPC, Simhadri,
Visakhapatnam (AP)

87. Erection, Testing & Commissioning Piping of Siemens for Aug’09 Mar’10
of Piping of 1x 27 MW Steam 1 x 27 MW Dalmia
Turbine-Generator at Dalmia Cement Ltd.
Cements Ltd., Ariyalur (TN)

88. Erection, Testing & Commissioning 2 x 25 MW Siemens for Sep’09 June’10


of 2 x 25 MW Steam Turbine- Empee
Generator & Auxiliaries at Empee Sugars Ltd.
Sugars Ltd., Ambasamudram (TN)

89. Receipt, Unloding, Storing & 1 x 500 MW BHEL For Jan’ 10 Dec’13
Stacking at Storage yard materials DAE
& Component of 1 x 500 MW TG
Set in Main Plant at FBRT Site,
Bhavani, Kalpakkam (Tamilnadu)
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

90. Erection, Testing & Commissioning 1 x 500 MW BHEL for May’10 Jan’12
of Steam Turbine, Generator, KPCL
Pumps, Piping & Other Auxiliaries
of Unit-2 at RTPS, Bellary,
Karnataka

91. Erection, Testing & Commissioning 22.5 MW Jaiprakash May’10 Apr’11


of 22.5 MW Turbogenerator Set Siemens Enterprises
with associated Auxiliaries, piping, Ltd.
Air cooled Condenser at Captive
Power Plant-II, Jaypee Cement
Ltd., Bhuj, Gujarat

92. Erection, Testing & Commissioning 22.5 MW Jaiprakash June’10 Mar’11


of 22.5 MW Turbogenerator Set Siemens Enterprises
with associated Auxiliaries, piping, Ltd.
Air cooled Condenser at Captive
Power Plant-II, Jaypee Cement
Ltd., Wanakbori, Gujarat

93. Erection, Testing & Commissioning 1x 40 MW JSW Steel Ltd Jul’10 Mar’11
of Unit-1 (BF#4) Motor Driven MAN Turbo
Turbo-Blowers & Aux. Equipment at & ABB
JSW Steel Ltd., Bellary, Karnataka Motor

94. Erection, Testing & Commissioning 2X60 MW Jaiprakash Aug’10 Unit1-Jun’12


of 2X60 MW Turbogenerator Set BHEL Enterprises Unit2-Aug’12
with associated Auxiliaries, piping, Ltd.
Air cooled Condenser at Captive
Power Plant, Jaypee Cement Ltd.,
Sidhi, Madhya Pradesh
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

95 Erection, Testing & Commissioning 1 x 600 MW BHEL for Sep’11 Unit 2


of Steam Turbine, Generator, Part TNEB synchronized
of CW Piping, CW Pumps & Other on Dec’12
BOI of Unit-2 at North Chennai
TPS, Athipattu, Tamil nadu.

96 Erection, Testing & Commissioning 30 MW Chettinadu Jul ’10 Jul’12.


of 30 MW Steam Turbine, Siemens Cements Ltd.
Generator with associated
Auxiliaries at Chettinadu Cements
Ltd, Kallur, Chincholi, Karnataka.

97 Erection, Testing & Commissioning 19 MW Ponni Sugars Oct’11 Jul’12


of 19 MW Steam Turbine, Siemens Erode Ltd
Generator with associated
Auxiliaries at Ponni Sugars Erode
Ltd, Erode, Tamil nadu

98 Erection, Testing & Commissioning 500 MWe BHAVINI Dec’11 In progress.


of Steam Turbine, Generator,
auxiliaries & Other BOI at BHAVINI
Kalpakkam PFBR, Kalpakkam
Nuclear Power Project, Tamil nadu.

99 Erection, Testing & Commissioning 500 MW BHAVINI May’12 In progress


of Piping & Insulation work BHEL
including supply & application of
final painting at BHAVINI
Kalpakkam PFBR, Kalpakkam
Nuclear Power Project, Tamil nadu.
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

100 Handling at site stores, 500 MW BHEL for Jun’12 In Progress


transportation, erection, alignment, NTPL
welding, testing & commissioning
including final painting of Steam
turbine, Generator and its Aux and
other BOI for UNIT 1 of 2X500 MW
at NTPL, Tuticorin, Tamilnadu.

101 Handling at site stores, 500 MW BHEL for Aug’12 In Progress


transportation, erection, alignment, NTPL
welding, testing & commissioning
including final painting of PART
Circulating Water (CW) system for
Unit 1 & 2 at 2X500 MW at NTPL,
Tuticorin, Tamilnadu.

102 Erection, Testing & Commissioning 150 MW BHEL for Feb’13 Completed
of Steam Turbine, Generator, AAP
auxiliaries & Other BOI of Unit 2 at
Aditya Aluminium Plant, Lapanga,
Sambalpur, Orissa.

103 Erection, Testing & Commissioning 150 MW BHEL for Jul’13 In Progress
of Steam Turbine, Generator, AAP
auxiliaries & Other BOI of Unit 1 at
Aditya Aluminium Plant, Lapanga,
Sambalpur, Orissa.
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

Erection, Testing & Commissioning 500 MW BHEL for Sep’12 Completed


104 of Steam Water Seprators for Bhavini
1X500 Mw set at Bhavini
Kalpakkam PFBR, Tamilnadu.

105 Erection, Testing & Commissioning 600 MW BHEL for Sep’13 In Progress
of Steam Turbine, Generator, JITPL
auxiliaries & Other BOI of Unit-2 at
Jindal India Thermal Power Ltd,
Derang, Angul, Orissa.

106 Erection, Testing & Commissioning 660 MW BHEL for Jul’13 In Progress
of Steam Turbine, Generator, PPGCL
auxiliaries & Other BOI including
TG cycle piping of Unit 2 at
Prayagraj Power Generation
Company Ltd., Bara , District-
Allahabad (Uttar Pradesh).

107 Erection, Testing & Commissioning 660 MW BHEL for Jan’14 In Progress
of Steam Turbine, Generator, PPGCL
auxiliaries & Other BOI including
TG cycle piping of Unit 3 at
Prayagraj Power Generation
Company Ltd., Bara , District-
Allahabad (Uttar Pradesh).
LIST OF ERECTION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

108 Erection, Testing & Commissioning 150 MW BHEL for Aug’ 14 In Progress
of Steam Turbine, Generator, AAP
auxiliaries & Other BOI of Unit 6 at
Aditya Aluminium Plant, Lapanga,
Sambalpur, Orissa.

109 Erection, Testing & Commissioning 22.5 MW Jaiprakash Aug’14 In Progress


of Steam Turbine, Generator, (Siemens) Enterprises
auxiliaries & Air Cooled Condenser Ltd.
package with auxilliaries for New
CPP at Balaji, Andhra Pradesh.
List of Maintenance Works Executed
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

1. Replacement of Boiler Airheaters 60 MW TNEB Oct ’79 Dec ’79


Economisers for Unit I at ETPS,
Ennore

2. Replace of Boiler Airheaters, 110 MW TNEB Mar ‘80 May ‘80


Economisers for Unit III at ETPS,
Ennore

3. Replacement of Boiler Airheaters, 110 MW TNEB Jan ’81 Mar ’81


Economisers for Unit V at ETPS,
Ennore

4. Capital Maintenance of Unit I TG 210 MW BHEL for Sep ’83 Nov ’83
set & BFP at TTPS, Tuticorin. TNEB

5. Overhauling of TG Set Unit III at 110 MW BHEL for Jan ’84 Mar ’84
ETPS, Ennore TNEB

6. Replacement of TG Rotor at TNPL, 18 MW TNPL Feb ’86 Feb ’86


Kagithapuram, Tamilnadu

7. Overhauling of TG set Unit VII at 100 MW NLC Aug ’87 Nov ’87
TS-1, NLC, Neyveli
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

8. Overhauling of TG set Unit I at 235 MW NPCIL Nov ’87 Jan ’88


MAPS, Kalpakkam

9. Capital Maintenance of TG set 210 MW BHEL for Dec ’87 Jan ’88
Unit I at MTPS, Mettur TNEB

10. Capital Maintenance of TG set 235 MW MAPS Jan ’88 Apr ’88
Unit II, at MAPS, Kalpakkam

11. Overhauling of TG set Unit IX at 100 MW NLC Feb ‘89 Oct ’89
TS-I, NLS, Neyveli

12. Capital Maintenance of TG set 210 MW BHEL for Aug ’89 Oct ’89
Unit II, at MTPS, Mettur TNEB

13. Overhauling of TG set Unit III at 50 MW NLC Aug ’89 Nov ’89
NLC, TS-1, Neyveli

14. Overhauling to TG set Unit I at 210 MW BHEL for Oct ’89 Nov ’89
MTPS, Mettur TNEB

15. Repair & Replacement of TB II 6067 Nm³/ BHEL for VSP Apr ’90 May ‘90
Rotor at VSP, Vizag Steel Plant minute
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

16. Overhauling of TG set at TNPL, 8 MW TNPL Oct ’90 Nov ’90


Kagithapuram

17. Overhauling of TG set Unit I at 235 MW NPCIL Jan ’91 Apr ’91
MAPS, Kalpakkam

18. Overhauling of Boiler Grates at TNPL May ‘91 May ‘91


TNPL, Kagithapuram, Tamilnadu

19. Capital Maintenance of 210 MW TG 210 MW BHEL for Oct ’91 Nov ’91
set Unit III at MTPS, Mettur TNEB

20. Overhauling of TB Unit III at VSP, 6067 BHEL for VSP Sep ’91 Sep ’91
Vizag Nm³/min

21. Inspection of Blower Rotor TB III at 6067 BHEL for VSP Sep ’91 Sep ’91
Visakhapatnam Steel Plant Nm³/Min.
Blower

22. Capital Maintenance of TG set & 18 MW TNPL Oct ’91 Oct ’91
Aux. At TNPL, Kagithapuram

23. Repair works of Unit IV Generator 210 MW BHEL for NLC Nov ’91 Nov ’91
at TS II NLC, Neyveli
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

24. Capital Maintenance of Turbo 6067 Nm³ / VSP Dec ’91 Jan ’92
Blowers 1 & 2 at Visakhapatnam min.
Steel Plant.

25. Capital Maintenance of Turbo 6067 Nm³ / VSP Jun ’92 Jun ’92
Blowers 3 at Visakhapatnam Steel min.
Plant

26. Overhauling of TG set Unit II at 235 MW NPCIL Jul ’92 Nov ’92
MAPS, Kalpakkam

27. Renewal of HP module of Unit- V 120 MW BHEL-SAS for Aug ’92 Oct ’92
TG set at NALCO, Angul, Orissa NALCO

28. Overhauling of TG set Unit - II at 210 MW BHEL- SAS Nov ’92 Jan ’93
RTPS, Raichur, Karnataka for KPCL

29. Capital Maintenance of 210 MW TG 210 MW BHEL for Nov ’92 Jan ’93
set Unit II at RTPS, Raichur. KPCL

30. Replacement of Ammonia converter 300 TPD CFL May ‘93 Jun ’93
cartridge & loading of catalyst at
CFL Visakhapatnam (AP)

31. Overhauling of IP & LP modules & 120 MW BHEL for Jul ’93 Oct ’93
Aux. of TG Unit- I at NALCO, Angul NALCO
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

32. Overhauling of TG set Unit-I at 235 MW NPCIL Jul ’93 Jan ’94
MAPS, Kalpakkam, Tamilnadu

33. Capital Maintenance of 120 MW 120 MW BHEL for Aug ‘93 Oct’ 93
TG set Unit- I HP module at NALCO
NALCO, Angul, Orissa

34. Overhauling of TG set 210 MW 210 MW BHEL for Aug ’93 Oct ’93
Unit-I at MTPS, Mettur, Tamilnadu TNEB

35. Capital Maintenance of TG set Unit- 60 MW VSP Sep ’93 Oct ’93
III & Aux. at Vizag Steel Plant,
Visakhapatnam, Andhra Pradesh

36. Overhauling of Turbo Blower at 4 MW NICCO for Jan ’94 Mar ’94
CFL, Visakhapatnam Elliot Make CFL

37. Capital Maintenance of TG set Unit- 60 MW VSP Feb ’94 Mar ’94
I & Aux. at Vizag Steel Plant,
Visakhapatnam, Andhra Pradesh
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

38. Overhauling of Cargo Oil Pumps & 3 x 300 HP Chokani Intl. Apr ’94 May ‘94
drive Turbines of MT Visveswar- For SCI
ayya at Chokhani Dry Dock

39. Overhauling of LP Turbine Unit-II at 235 MW NPCIL Jun ’94 Sep ’94
MAPS, Kalpakkam

40. Overhauling of 210 MW TG set 210 MW BHEL for Aug ’94 Nov ’94
Unit-II at MTPS, Mettur, TNEB

41. Unit V Generator Field Balancing 210 MW BHEL for Aug ’94 Sep ’94
work at TTPS, Tuticorin TNEB

42. Overhauling of TG set Unit-I at 18.5 MW NALCO Aug ’94 Sep ‘94
NALCO, Damanjodi.

43. Overhauling Grate of Boiler No.2 at TNPL Nov ’94 Dec ’94
TNPL, Kagithapuram

44. Inspection & Overhauling of TG set 235 MW MAPS Apr.’95 Sep.’95


Unit II at MAPS, Kalpakkam
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

45. Overhauling of Cargo Oil pump & 3 x 300 HP Chokhani Intl. May ‘95 Jun ’95
Turbine of MT Sarojini Naidu at For SCI
Chokani International Limited
Shipyard, Chennai

46. Inspection & repair of Unit-IV 210 MW BHEL for Jun ’95 Sep ’95
Generator Rotor at RTPS, Raichur MHI KPCL

47. Inspection & Overhauling of 5.4 5.4 MW J. K. Corp. Oct ’95 Dec ’95
MW TG set at J.K. Paper,
Rayagada, Orissa

48. Overhauling of TG set Unit-III and 18.5 MW NALCO Dec ’95 Jan ’96
Aux.. at NALCO, Damanjodi

49. Inspection & Overhauling of Unit-I 235 MW NPCIL Apr ’96 Jun ’96
LP Turbine at MAPS, Kalpakkam

50. Overhauling of Generator, Exciter & 210 MW BHEL for Jul ’96 Aug ’96
Aux. Of Unit-I at VSTPP, NTPC
Vindyachal
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

51. Overhaul of TG set Unit IV at 210 MW BHEL for Sep ’96 Oct ’96
MTPS, Mettur TNEB

52. Overhauling of TG set & Pumps 210 MW BHEL for Sep ’96 Oct ’96
Unit- IV at RTPS, Raichur, MHI KPCL

53. Overhauling of TG set Unit-II at 20 MW BHEL-SR for Sep ’96 Oct ’96
Madras Refinery Ltd., MRL

54. Overhauling of TG Set Unit – VI at 500 MW BHEL-SAS Nov ’96 Dec ’96
Korba TPS, Chattisgarh for NTPC

55. Overhauling of TG- II Unit and its 60 MW VSP Nov ’96 Dec ’96
accessories at TPP,
Visakhapatnam Steel Plant

56. Overhauling of TG set Unit – III at 210 MW BHEL-SAS Nov ’96 Dec ’96
Mettur TPS, Tamilnadu for TNEB

57. Generator repair works of Unit – IV 210 MW BHEL-SAS Sep ’97 Sep ’97
at Tuticorin TPS, Tamilnadu for TNEB
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

58. Overhauling of HP, LP Turbines of 235 MW NPCIL Oct ’97 Oct ’97
Unit-I at Karkarpara APS, Gujarat

59. Overhauling of TG set of Unit-I at 235 MW NPCIL Nov ’97 Mar ’98
Kalpakkam APS, Tamilnadu

60. Overhauling of TG set of Unit – IV 210 MW BHEL-SAS Dec ’97 Jan ’98
at Mettur TPS, Tamilnadu for TNEB

61. Inspection of Condensing Turbine 12 MW JK Corp. Ltd. Apr ’98 Apr ’98
at JK Corporation, Rayagada

62. Overhauling of 5 Nos. of Cargo Oil 5x 500 HP HSL for SCI Jan ’99 Feb ’99
Pumps & Turbines of MT J.N. Vyas
for Hindustan shipyard Ltd.

63. Overhauling of 5 Nos. of Cargo Oil 5x 500 HP HSL for SCI Mar ’99 Apr ’99
Pumps & Turbines of MT R. A.
Kidwai for Hindustan Shipyard Ltd.

64. Overhauling of TG set of Unit – II at 235 MW NPCIL Mar ’99 May ‘99
Kalpakkam APS, Tamil nadu
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

65. Preservation, restoration & re- 235 MW NPCIL Nov ’99 Jun ’01
assembling of Unit – 1 TG at Kaiga
APS, Karnataka

66. Hot gas path inspection of GTG- 1 2 x 48 MW Rolls Royce Jul ‘99 Aug ‘99
& 2 at Spectrum Godavari Westing- for Spectrum
Combined Cycle Power Plant, house GCCP
Kakinada, Andhra Pradesh

67. Overhauling of TG set of Unit-I at 236 MW NPCIL Jan ’00 Jun ’00
Kalpakkam APS, Tamilnadu

68. Mechanical maintenance of main Frame-9 NTPC Feb ’00 Dec ’00
plant, Aux. & Offsite at NTPC, GTG
Kayamkulam, Kerala

69. Attending to High Vibrations & 235 MW NPCIL Feb ’00 Mar ’00
Overhauling of Unit- 2 at Kaiga
APS, Karnataka

70. Overhauling of Emergency core Nuclear NPCIL Mar ’00 Mar ’00
cooling Pumps and PHT pumps of Reactor
Unit 1 & 2 at KGS

71. AMC for Routine maintenance of 250 MW RSEB Jun ’00 Jun ‘03
Pumps in Turbine areas at
Suratgarh TPS, Rajasthan
LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

72. Hot gas path inspection of GT- 1 at 48 MW Rolls Royce Oct ‘00 Oct ‘00
Godavari CCPP, Kakinada Westing- for Spectrum
house GCCP

73. Replacement of Rotary Dryers of A Complex L &T for CFL Nov ’00 Mar ‘01
& B Trains at Coromandel fertilizers Fertiliser
Ltd., Visakhapatnam Plant

74. Insitu Inspection of Unit – I HP & LP 235 MW NPCIL Aug ’01 Aug ’01
Turbine Rotors at Kalpakkam APS,
Tamilnadu

75. Repair of HP Turbine & Generator 235 MW NPCIL Sep ’01 Oct ’01
Rotors & overhauling of TG set
Unit-I at Kaiga APS, Karnataka

76. Overhauling of Cargo Oil Pumps 4 x 600 HP HSL for SCI Dec ‘01 Jan ‘02
and Drive Turbines on MT
Basveshwara at Hindustan
Shipyard Ltd.

77. Overhauling of HP, LP Turbines 235 MW NPCIL Mar ‘02 Apr ‘02
and blade replacement in Unit-2 at
Kaiga Atomic Power Plant,
Karnataka
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

78. Overhauling of Valves in reactor 235 MW NPCIL Jun ‘02 Jan ‘03
and TG Areas of Unit 2 at Madras
Atomic Power Station, Kalpakkam

79. Major Overhaul of TG-2 at NALCO, 18.5 MW NALCO Jun ‘02 Jun ‘02
Damanjodi, Orissa

80. Inspection of Gas Turbine M 701 F 260 MW PSEG Global Jul ‘02 Aug ‘02
at PSEG- PPN , Thirucadaiyur, Mitsubushi
Nagipattinam, Tamilnadu

81. Dismantling and Servicing of 235 MW NPCIL Oct ‘02 Jan ‘03
Generator Transformer of Unit-2 at
Madras Power Station

82. Overhauling of HP, LP Turbine and 235 MW NPCIL Dec ‘02 Jan ‘03
replacement of Gasket in Unit-1 at
Kaiga A P Station, Karnataka

83. Major Overhaul & slip ring 18.5 MW NALCO Dec ‘02 Jan ‘03
Replacement of TG-1 at NALCO,
Damanjodi, Orissa

84. Overhauling of HP, LP Turbine and 235 MW NPCIL Jan ‘03 Feb ‘03
CCW Pumps & IDCT Fan Motors in
Unit 2 at Kaiga Atomic Power
Station, Karnataka
E0524

LIST OF MAINTENANCE WORKS EXECUTED


PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

85. Inspection and overhauling of Gas General GMR Tanir Apr ‘03 May ‘03
Turbine Generator at Tanir Bavi Electrical Bavi Pvt. Ltd.
Power Company Pvt. Ltd., LM 6000
Mangalore, Karnataka
86. Overhauling of TG set in Power 5.4 MW JK Corp. Ltd. May ‘03 May ‘03
Block at JK paper Mill, Rayagada,
Orissa

87. Replacement of Generator at JK 12 MW JK Corp. Ltd. Jul ‘03 Jul ‘03


Paper Mill, Rayagada, Orissa

88. Inspection and Overhauling of Gas General GE Feb ‘04 Mar ‘04
Turbine Generator 1 & 2 and Minor Electrical International
Inspection of Steam Turbine at LM 6000 Inc. for GMR
Tanir Bavi Power Company Pvt. Tanir Bavi Pvt.
Ltd., Mangalore, Karnataka Ltd.

89. Overhauling of TG-3 Unit and 18.5 MW NALCO May ‘04 May ‘04
Auxiliaries at NALCO Damanjodi,
Orissa

90. Hot Gas Path Inspection of GT 2 at 48 MW Rolls Royce Aug ‘04 Sep ‘04
Godavari CCPP, Kakinada, Andhra Westing for Spectrum
Pradesh House GCCP

91. Inspection and overhauling of HP, 235 MW NPCIL Aug ‘04 Aug ‘04
LP turbines, generator and
auxiliaries at Unit-3 TG set at
Rajasthan Atomic Power Station,
Rajasthan
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

92. Inspection and overhauling of HP, 235 MW NPCIL Apr ‘05 Apr ‘05
LP turbines, generator and
auxiliaries at Unit-4 TG set at
Rajasthan Atomic Power Station,
Rajasthan

93. Replacement, erection & Complex L & T for CFL Apr ‘05 May ‘05
commissioning of Rotary Fertiliser
Granulator A- Train at Coromandel Plant
Fertilisers Ltd., Visakhapatnam

94. Minor Inspection of Gas Turbine General GMR Tanir Oct’05 Oct’05
Generator Unit 1 at Tanir Bavi Electrical Bavi Pvt. Ltd.
Power Company Pvt. Ltd., LM 6000
Mangalore, Karnataka

95. Overhauling of Blower & Turbine in 4 MW Elliot CFL Apr’06 Apr’06


sulphuric Acid Plant at Coromandel USA
Fertilisers Ltd., Visakhapatnam AP

96. Inspection and overhauling of HP, 235 MW NPCIL Aug’06 Sep’06


LP turbines, generator and
auxiliaries at Unit-3 TG set at
Rajasthan Atomic Power Station,
Rajasthan
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

97. Emergency capital repair of TG-4 67.5 MW VSP Sep’06 Oct’06


Turbine & Auxiliaries at RINL,
Visakhapatnam Steel Plant, AP

98. De-erection of Damaged Stator 235 MW NPCIL Dec’07 Jan’08


placing outside Turbine Building for
repair in Unit 3 at Kaiga Atomic
Power Station, Karnataka

99. Replacement of Kaiga # 3 235 MW NPCIL Jan ‘08 Mar’08


Generator with Generator of Kaiga
# 4 at Kaiga Atomic Power Station,
Karnataka

100. Capital Repair of TG-3 Turbine & 60 MW VSP Mar’08 Apr’08


Auxiliaries at RINL, Visakhapatnam
Steel Plant, AP

101. Inspection of HP & LP rotors and 235 MW NPCIL Aug’08 Sep’08


generator of unit 2 TG set at MAPS,
Kalpakkam, Tamilnadu

102. Inspection of Turbine HP & LP 235 MW NPCIL Nov’09 Nov’09


Rotor & Generator of Unit 1 of 235
MW TG Set at MAPS, Kalpakkam
APS, Tamilnadu

103. Removal and re-installation of 235 MW NPCIL Mar ‘10 Apr’10


Generator Rotor in Unit -4 at Kaiga
Atomic Power Station, Karnataka
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

104 Removal and re-assembly of Gas GMR Energy Jul ‘10 Aug ‘10
Turbine Generator Unit 1 at GMR Ltd
Energy Ltd, Barge Mounted Power
Plant, East Godavari,
Andhrapradesh

105 Removal, Inspection & installation 235 MW NPCIL Nov ‘10 Jan ‘11
of HP & LP Rotor, inspection of
bearings, maintenance works on
generator of Unit 2 of 235 MW TG
Set at MAPS, Kalpakkam,
Tamilnadu

106 Servicing of Reduction Gear Box of GMR Energy May ‘11 May ’11
Gas Turbine Generator Unit 3 at Ltd
GMR Energy Ltd, Barge Mounted
Power Plant, East Godavari,
Andhrapradesh

107 In-situ inspection of HP & LP 235 MW NPCIL Jun ‘11 Jul ‘11
Turbine, bearings, overhauling of
generator, HP Governor Valves of
Unit 1 of 235 MW TG Set at MAPS,
Kalpakkam, Tamilnadu

108 Dismantling, overhauling & box up 235 MW NPCIL Jul ‘11 Aug ‘11
of Unit-3 Turbine, Generator & its
governing system at Kaiga Atomic
Power Station-3, Karnataka.
E0524

LIST OF MAINTENANCE WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

109 Repair & replacement of broken 67.5 MW RINL VSP Jul ‘14 Completed
Turbine Rotor Shaft at TG #5 RINL
Vishakhapatnam. Andhra Pradesh.

110 Dismantling & Removal of Old 600 MW JITPL Oct ‘14 In progress
Generator Stator of Unit 1, Erection
& Commissioning of new Generator
& Exciter at JITPL, Derang, Angul,
Odhisa.
List of Rehabilitation Works Executed
LIST OF REHABILITATION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

1. Retrofit of Boiler Air heaters, 110 MW BHEL for Nov’ 83 Mar’ 84


Economisers & Super heaters for TNEB
Unit III & IV at ETPS. Ennore

2. Rehabilitation, testing & 4 MW EMCONS for Mar’ 90 Apr’ 90


Commissioning of 4 MW TG set at Brown SPB
SPB, Erode Boveri

3. Rehabilitation / Life Extension Work 50 MW & TPE / ABL for Sep ’92 Aug ’94
of TG sets Unit I and IX at TS-1, 100 MW NLC
NLC, Neyveli. RUSSIAN

4. Repair & reblading of 100 MW HP 100 MW NLC Nov ’93 Dec ’93
Rotor Unit VIII at TS-1, NLC,
Neyveli

5. Core repair and Rewinding of 100 MW TPE / ABL for Mar ‘94 Sep ‘94
Generator Stator Unit VII at TS-1, NLC
NLC, Neyveli

6. RLA study of Boilers Unit II, III, IV & 31.75 MW ABB-ABL for Feb ’95 Feb ’96
V at Dhuvaran TPS, Dhuvaran GEB
LIST OF REHABILITATION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

7. Rehabilitation, Erection, Testing & 12 MW J K Corp. Jun ’95 Dec ’95


Commissioning of Turbo Alternator
at J. K. Corporation Ltd. Rayagada,
Orissa

8. Retrofitting of Boiler Burners for CIL Jul ’95 Aug ’95


Cargo Oil Tanker Ship MT Sarojini
Naidu (SAACKE Gmbh-Burners) at
Chokani International Limited,
Shipyard, Chennai

9. Rehabilitation work of Unit I & II 60 MW ABB Italy Jul ’95 Dec ’95
Hydro Generators at Karnafulli
HPP, Bangladesh

10. Reblading of LP Rotor of Unit III at 210 MW ABB India Jul ’95 Jul ’95
TTPS, Tuticorin

11 Life Extension Work of Boiler Unit 50 MW ABL for NLC Nov ’95 Aug ’97
VIII A & VIIA at TS-1, NLC, Neyveli

12. Pressure Hull Survey of Submarine HSL for Indian May ’98 Jun ’98
INS Vagli for Hindustan Shipyard Navy
Ltd.
LIST OF REHABILITATION WORKS EXECUTED

PLANT DATE
CUSTOMER DATE OF
S/No. TYPE OF WORK PERFORMED CAPACITY OF
DETAIL COMPLETION
/ MAKE START

13. Retrofitting of Bentley Axial 12 MW Power Aug’06 Aug’06


Displacement probe in place of MAN Turbo Concept for
hydraulic relay device on steam NINL
driven turboblower at Neelachal
Ispat Nigam Ltd., Duburi Orissa

14. Conversion of oxygen Compressor 67,000 MAN TURBO Dec’06 Dec’06


Train to Nitrogen service in Air NM3/Hr. for VSP
Separation Plant of RINL,
Visakhapatnam Steel Plant, AP

15. Retrofitting of Woodward Electronic 35 MW Power Oct’07 Oct’07


Governor in place of hydraulic Concept Ltd.
governor device on SKODA for EPL
Turbogenerator set as Essar Power
Ltd., Pellet Plant, Visakhapatnam
AP
LIST OF CLIENTS…….

1. Bharat Heavy Electricals Limited (Chennai, Nagpur, New Delhi, Secunderabad, Hyderabad)
2. Nuclear Power Corporation of India Limited ( MAPS, RAPS, TAPP, KGS, KAPS)
3. Tamilnadu Electricity Board (Ennore Thermal Power Station, Tamilnadu)
4. Neyveli Lignite Corporation (Neyveli, Tamilnadu)
5. Tamilnadu Newsprint & Papers Limited (Kagithapuram, Tamilnadu)
6. SPB Projects and Consultancy Limited (Chennai)
7. RINL, Vishakapatnam Steel Plant (Visakhapatnam, Andhra Pradesh)
8. National Aluminium Company Limited (Damanjodi, Orissa)
9. ACC-Babcock Limited (New Delhi)
10. Technoprom Exports (New Delhi)
11. Chokani International Limited (Chennai)
12. Onaway Engineering (Visakhapatnam)
13. Bharat Heavy Plates & Vessels Limited (Visakhapatnam, Andhra Pradesh)
14. Coromandel Fertilizers Limited (Visakhapatnam, Andhra Pradesh)
15. J.K. Paper Mills (Rayagada, Orissa)
16. ABB India (Chennai)
17. ABB Sae Sadelmi (Italy)
18. Hindustan Shipyard Limited (Visakhapatnam, Andhra Pradesh)
19. Shipping Corporation of India (Mumbai)
20. Energy Overseas International INC.
21. BSES Limited, NOIDA (Uttar Pradesh)
22.
LIST OF CLIENTS…….

22. Rolls Royce Industrial Power India Ltd (Kakinada, Andhra Pradesh)
23. GE Power Services (India) Pvt. Ltd, New Delhi
24. Demag Delaval Industrial Turbomachinery Pvt. Ltd., ( Now SIEMENS Vadodara, Gujarat)
25. Jayaprakash Associates Limited (New Delhi)
26. JSW Steel Limited, Tornagallu (Bellari, Karnataka)
27. MAN Turbo India Pvt. Ltd ( Vadodara, Guajrat)
28. GMR Energy Limited (Kakinada, Andra Pradesh)
Presented by : ENGENIUS ERECTORS PRIVATE LTD.,

Head Office : 194, Poonamallee High Road,


P.O. Box 1055,
Kilpauk, Chennai – 600 010.
Tamilnadu, India,
Tel & Fax: 044 –26412555
E-mail : engenius@vsnl.net;
eeplho@gmail.com

Regional Office : ANDHRA PRADESH


SFA- I/145, EEIE,
Autonagar,
Vishakapatnam – 530012, INDIA.
Tel : +91 9440616470
E-mail : engeniusvizag@gmail.com;
pvsai@engeniuserectors.com

KARNATAKA
No.5, 2nd Cross, Lalbagh Road,
Bangalore – 560002, INDIA.
Tel.: +91 9448457537
E-mail : javeedmekhri@hotmail.com;

Bankers : Andhra Bank, Chetpet, Chennai

Auditor : K. Ramkrish & Co. Chennai

Website : www.engeniuserectors.com

S-ar putea să vă placă și