GENERAL NOTES:
PROPERTY LINE
1600,00
S s Cieling Mounted Light
MAIN SERVICE ENTRANCE HAD 2-#22MM2 THWN WIRE IN 25MM Ø RIGID STEEL CONDUIT
i i
KITCHEN
PB-GF
3
SHOWER m 2Smn ·
AREA
2S 2 Gang Switch
3300,00
l TOILET Recessed Cieling Mounted Light
· METHOD OF WIRING HAD PROVIDED THE FOLLOWING:
4200,00
f j POWDER & BATH q
BEDROOM 2 3S 3 Gang Switch
1650,00
PB-GF
ROOM
5100,00
2Shi
5300,00
2 2Shi i
h Triplex Receptacle Outlet -MAIN SERVICE ENTRANCE, RIGID CONDUIT PIPE.
PB-2F
WP Weatherproof Landscape Light
e e e PB-GF h n 2 FAMILY
o
Sg ROOM p Duplex Receptacle Outlet -INSIDE CEILING, WIRING IN PVC 15MM Ø PVC ELECTRICAL PIPE.
850,00
800,00
DINING
3Sefg Sj
DN
PB-2F
3
Outdoor Duplex Outlet
g
Sg
8600,00
k
WP Single Receptacle Outlet M kWH Meter -UNDERGROUND AND EMBEDDED IN MASONRY, WIRINGS IN PVC ELECTRICAL PIPE.
800,00
800,00
UP DN s
a
10000,00
10000,00
10000,00
3Sopq
UP 3Sjkl 2Srs ACU
Air Conditioning Unit · MOUNTING HEIGHT HAD PROVIDED THE FOLLOWING:
PB-GF
2Sef Panel Board HP
1 PB-2F
e
PB-WS 1
WP Water Pump -CONVIENIENCE OUTLET 0.30 M. FROM FLOOR LINE.
3900,00
3900,00
3800,00
PB-A
2Sab
BEDROOM 1 Circuit Homerun
b 1
a a
j CP Centrifugal Pump -WALL SWITCHES 1.37 M. FROM FLOOR LINE.
MASTER
3500,00
d DECK
b
BEDROOM PB-2F
4
-PANELBOARD 1.52 M. FROM FLOOR LINE.
PB-2F
WATER LIVING f
LEGENDS AND SYMBOLS
1
4700,00
REFILLING Sd
a a
3Sabc 2Scd E-1 SCALE NTS
ROOM · ALL WIRES HAD USED THE FOLLOWING:
ENTRANCE
WP WP WP WP r
r s s
2000,00
2000,00
2000,00
1000,00
1150,00
d c c d d
1400,00
1400,00
-GENERAL WIRING 3.5MM2 THHN WIRE
BALCONY
PORCH
PROPERTY LINE PROPERTY LINE
· ALL WORKS HAD BEEN DONE IN ACCORDANCE WITH THE PROVISION OF THE PHILIPPINES
2600,00 4900,00 7500,00 7500,00
ELECTRICAL CODE
2 GROUND FLOOR LIGHTING LAYOUT PLAN 3 2ND FLOOR LIGHTING LAYOUT PLAN 4 3RD FLOOR LIGHTING LAYOUT PLAN
E-1 SCALE 1:100M E-1 SCALE 1:100M E-1 SCALE 1:100M
S5.5 S5.5
S5.5
PROPERTY LINE
60AT
ECB30AT ECB20AT
2P,230V 2P, 230V 2P, 230V
1600,00
PB-2F
7 NEMA3R NEMA3R
KITCHEN SHOWER
AREA PB-2F
3300,00
6 TOILET PB-2F ACU-1 ACU-2
4200,00
ROOM
5100,00
ROOM
5300,00
ACU-1 ACU-2
PB-GF 1.5 HP 1 HP
5 PB-GF
850,00
800,00
DINING DN
BALCONY
8600,00
PB-GF
800,00
800,00
6 DN
UP
10000,00
10000,00
10000,00
UP
PB-2F
PB-WS 5
3900,00
3900,00
PB-GF
3800,00
3500,00
DECK 60AT
2P,230V 60AT
PB-2F
WP
REFILLING
ROOM
S3.5 S3.5 S3.5 S3.5 S3.5 S5.5
ENTRANCE PB-ACU1 PB-ACU2
WP
ACU-1 ACU-2
2000,00
2000,00
2000,00
15AT 15AT 15AT 20AT 20AT 40AT
1000,00
1.5 HP BALCONY 1.0 HP
1150,00
2P,230V 2P,230V 2P,230V 2P,230V 2P,230V 2P,230V
1400,00
1400,00
PORCH
PROPERTY LINE PROPERTY LINE
LIGHTING
LIGHTING
LIGHTING
POWER OUTLET
POWER OUTLET
2600,00 4900,00 7500,00 7500,00 S5.5
PANEL: "PB-GF" LOCATION : GROUND FLOOR, KITCHEN PANEL: "PB-ACU1" LOCATION : 2ND FLOOR, BALCONY MAIN FEEDER SIZE:
CKT LOAD VOLT AMPERE PROTECTION NUMBER & SIZE CKT VOLT AMPERE PROTECTION NUMBER & SIZE OF IT = ( Total Ampere Load x Demand Factor) + ( Highest Motor load x .25) S5.5 S5.5 S5.5
VOLT LOAD DESCRIPTION VOLT
NO. DESCRIPTION AMPERE LOAD AT AF OF WIRE & CONDUIT NO. AMPERE LOAD AT AF WIRE & CONDUIT IT = ( 34.75 x .90) + (12.84 x .25) WP CP WP
1 LIGHTING 230 400 1.74 15 100 S3.5 1 ACU1 230 1118.55 4.86 30 100 S5.5 = 34.51 Amps
1-HP MOTOR
1-HP MOTOR
1-HP MOTOR
2 LIGHTING 230 350 1.52 15 100 S3.5 PANEL: "PB-ACU2" LOCATION : 2ND FLOOR, BALCONY USED 2-NO.22 MM2 THWN 25MM Ø CONDUIT
3 LIGHTING 230 250 1.09 15 100 S3.5 CKT LOAD VOLT AMPERE PROTECTION NUMBER & SIZE OF
PANEL "PB-GF" FEEDER SIZE: PANEL "PB-2F" FEEDER SIZE:
VOLT
4 POWER OUTLET 230 1260 5.48 20 100 S3.5 NO. DESCRIPTION AMPERE LOAD AT AF WIRE & CONDUIT IT = ( 14.53 x .90) + (12.84 x .25) IT = ( 14.53 x .90 )
5 POWER OUTLET 230 1080 4.70 20 100 S3.5 1 ACU2 230 745.7 3.24 20 100 S.5.5 = 16.29 Amps = 14.66 Amps
2
WATER PUMP PANEL: "PB-WS" LOCATION : GROUND FLOOR, WATER REFFILING ROOM USED 2-NO.22 MM THWN 25MM Ø CONDUIT USED 2-NO.5.5 MM2 THWN 15MM Ø CONDUIT
6 230 2954 12.84 40 100 S5.5 WATER REFILLING ROOM
MOTORS VOLT PROTECTION
CKT LOAD AMPERE NUMBER & SIZE OF PANEL "PB-ACU1" FEEDER SIZE: PANEL "PB-ACU2" FEEDER SIZE:
PANEL: "PB-2F" LOCATION : 2ND FLOOR, HALLWAY VOLT AMPER
NO. DESCRIPTION LOAD AT AF WIRE & CONDUIT IT = ( 3.24 x 2.5 )
E IT = ( 4.86 x 2.5 )
CKT LOAD VOLT AMPERE PROTECTION NUMBER & SIZE OF
VOLT 1 RO PUMP 230 745.7 3.24 20 100 S5.5 = 12.15 Amps = 8.10 Amps
NO. DESCRIPTION AMPERE LOAD AT AF WIRE & CONDUIT 8 SINGLE LINE DIAGRAM
2 RO PUMP 230 745.7 3.24 20 100 S5.5 USED 2-NO.5.5 MM2 THWN 15MM Ø CONDUIT USED 2-NO.5.5 MM2 THWN 15MM Ø CONDUIT E-1 SCALE NTS
1 LIGHTING 230 350 1.52 15 100 S3.5
LIGHTING 230 300 1.30 15 100 S3.5
CENTRIFUGAL
2 3 230 745.7 3.24 20 100 S5.5 PANEL "PB-WS" FEEDER SIZE:
PUMP
3 LIGHTING 230 450 1.96 15 100 S3.5 IT = ( 3.24 x 2.5 )
CODE WIRES & CONDUIT
4 LIGHTING 230 250 1.09 15 100 S3.5 = 8.10 Amps 9 SCHEDULE OF LOAD
S3.5 2-3.5MM2 THHN IN 15MM Ø CONDUIT
5 POWER OUTLET 230 1260 5.48 20 100 S3.5 USED 2-NO.5.5 MM2 THWN 15MM Ø CONDUIT E-1 SCALE NTS
6 POWER OUTLET 230 600 2.61 20 100 S3.5 S5.5 2-5.5 MM2 THWN IN 15MM Ø CONDUIT
7 POWER OUTLET 230 1440 6.26 20 100 S3.5 S22 2-22 MM2 THWN IN 25MM Ø CONDUIT
REG. NO.:
PROFESSIONAL ELECTRICAL ENGINEER
PTR. NO.:
LOCATION MR. FRANCISCO L. YOHANON
LIGHTING LAYOUT PLAN
POWER LAYOUT PLAN
SCHEDULE OF LOAD
E-1
TIN. NO.: DATE: B6 L24 DIEGO SILANG ST., WINDSOR HOMES SUBDIVISION, BRGY. BUROL
PLACE: 3, DASMARIÑAS, CAVITE SINGLE LINE DIAGRAM