Contents
PART I OVERVIEW ...................................................................................................................................... 3
1. PRECAUTIONS ....................................................................................................................................... 3
Part I Overview
1. Precautions
After arriving at the site, Huawei installation personnel need to work according to requirements
specified in the Huawei Engineer Manual, and pay attention to the following items:
1. Based on the discussion with the customer, Huawei and the customer appoint
the person-in-charge respectively. The person-in-charge is fully responsible
for the installation coordination of the project.
2. Before the kickoff, Huawei and the customer need to reach an agreement on
the project schedule. For all incidents that may affect the project schedule,
the two parties need to specify reasons and provide solutions in written form.
3. Based on the product preparation guide, the engineering personnel check the
site environment. If the site environment meets the requirements for project
kickoff, the goods inspection is started and relevant lists are filled out. For any
error, omission, or defect, the installation personnel need to contact Huawei
for immediate replenishment, replacement, or other remedies.
4. The personnel must install the hardware with caution according to the
installation manual. After the installation is complete, relevant personnel is
organized timely to carry out the equipment acceptance.
5. Both Huawei and the customer personnel must perform the equipment
acceptance and preliminary acceptance test in strict accordance with relevant
standards. Some indicators and parameters have already been tested before
delivery. Such items can be omitted or be sampled during the tests if
conditions are not appropriate.
6. After the acceptance test is successfully complete, the cutover and
commissioning for operation starts.
Tools
1. Level instrument
2. Socket spanner
3. Steel tape
4. Multimeter
5. Clamp Meter
6. Temperature
Part II Guidelines
Date of Acceptance
3 Battery
7
8
9
10
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
Ensure that the power system is installed according to engineering construction specifications, and that
any problems occurring during the power system operating process cannot be caused by installation.
Prerequisites
Ensure that the power system, input and output cables, and dry contact signals are connected
properly.
02 Check whether the paint and The paint and the electroplated
electroplated coating on the coating on the cabinet surface are □Pass □Fail □NA
cabinet surface are intact. intact.
03 Check whether the cabinet is All the expansion bolts are fastened
properly installed. firmly to avoid accidents caused by □Pass □Fail □NA
vibration.
05 Check whether input cables, All the cables are connected securely
output cables, and cables to avoid accidents.
□Pass □Fail □NA
between batteries are
connected properly.
06 Check whether cable signs Both ends of the cable have signs with
are clear and accurate. English descriptions that are easy to
□Pass □Fail □NA
understand and legible to people who
unfamiliar with such cables.
07 Check whether the cables for The grounding methods within the
working grounding and power system are unified by leading
protection grounding are the cable from the grounding bar of □Pass □Fail □NA
connected properly. the power system to that in the
shelter.
08 Check whether the distance The cable straps are arranged in even
between cable straps are distance. The cut needs to be clear of
□Pass □Fail □NA
even. sharp points to avoid injuries to
construction engineers.
09 Check whether the battery All the battery protecting covers are
protecting covers are covered. □Pass □Fail □NA
installed.
10 Check whether the Arrester As system design
□Pass □Fail □NA
is installed
11 Check whether MCB input Both ends of the MCB, on ACPDB &
Rectifier rack, have signs with English
labelled □Pass □Fail □NA
descriptions that are easy to
understand
Prerequisites
Ensure that the power system, input and output cables and dry contact signals are connected properly.
03 Check whether the battery The positive pole of the battery group
group and the power system is connected with the positive pole
are connected properly. terminal (RTN (+) busbar) of the
power system; the negative pole of □Pass □Fail □NA
the battery group is connected with
the negative pole terminal (NEG (-)
busbar) of the power system.
05 Check the status of all input The status of the input circuit breaker
circuit breakers, load circuit and all the load circuit breakers is
OFF. □Pass □Fail □NA
breakers and battery circuit
breakers
06 Check the status of manual The status of BLVD and LLVD is ON
power off switch □Pass □Fail □NA
Check whether the rectifier module is faulty when the power is on.
Prerequisites
The system is enabled.
Prerequisites
The system is enabled when the power is on.
Prerequisites
The system is enabled.
If Battery temperature compensation function is active, and the battery temperature is higher or less than 24
degC, the DC voltage will be reduced or enhanced 80mV/degC by PMU in order to protect the battery. The
commissioning engineer can temporary disable the Temp Comp function in PMU by changing setting in
DEFAULT ACTUAL
DESCRIPTION REMARK
SETTING SETTING
Set as actual
07.1 Battery String 1
configuration
07.2 Management Mode Setting AUTO AUTO
OK NOK NA Remarks
V L1 to N : V 230V AC ±20% (184 – 276 V AC)
V PE to N : V less than 5 V
I L1 : A
I L2 : A
I L3 : A
DCV : V
DC Load : A
Battery Bank 1 : V
Battery Bank 2 : V
Battery Bank 3 : V
Battery Bank 4 : V
6 A
7 A
8 A
9 A
10 A
OK NOK NA Remarks
LVLD Test
LVBD Test
Alarm Testing
AC Phase Failure
Arrester Failure
Rectifier Main Failure
Cabinet Door Open
DC/Battery Low Voltage
Ambience Temperature
High Temperature
DC Fan Failure
Genset Running (If Any)
Genset Failure (If Any)
Low Fuel (If Any)
DATE OF
No. ITEMS PIC
COMPLETION
T09 Punchlist
Remarks:
Perform the acceptance tests by strictly following the operation guidance of this manual.
Sign where appropriate to acknowledge the acceptance test procedure (ATP) for the below
station have been completed successfully.
Site Name :
Site ID :
Huawei representative:
(PT. Javacell)
_______________________________ _______________________________
Name: Name:
Title:Title:
H3I representative:
(PT.BMG)
_______________________________ _______________________________
Name: Name:
Title: Title:
Photos Attachment
3. Photos of Batteries