Documente Academic
Documente Profesional
Documente Cultură
1ST SEMESTER
HVAC 109
Submitted by
Anny L. Delos Santos
Faculty
Dr. Nicanor C. Dela Rama
FOR INFILTRATION
@For Outdoor :
Pvo = .6(6.281)
@ Indoor
RH = Pvi / Psat
V = 20m x40.8 m x 6m
= 4896 m3 ( 1.0 ACH)
= 4896 m3 x 1hr
Hr 3600s
V= 1.36 m3/ s
PV = MRT
M = PV/RT
= (101.325 – 3.7686)(1.36) / .2871(37 + 273)
M = 1.4907 kg/s
Qs = m cp (Tout – Tin)
= 1.4907 ( 1.005) ( 37 – 22 )
Qs = 22.4723 kw
QL = m hv ( HRout – HRin )
QL = 58.7944 kw
QT = QS + QL
= 22.4723 + 58.7944
QT = 81.2667 kw or 23.1134 TR
QT = 305 w / occ
SHR = 0.35
SHR = QS / QT
0.35 = QS / 305
QS =( 106.75 w / occupants ) ( 350 occupants)
= 37362.5 w x 1kw/ 1000w
Qs= 37.3625 kw
QL = QT - QS
= 305w – 106.75 w
QL = 69387.5 w or 69.3875 kw
QT = QS + QL
= 37.3625+ 69.3875
QT =106.75KW or 30.3612TR
6.0m
Glass
QS = A U (Tout – Tin )
=57486.61417 x 2 x 1kw/1000w
=114.9732 kw
QS = 114.9732 kw or 32.7 TR
6.0m
Glass
QS = A U (Tout – Tin )
=112762.2047 x 1kw/1000w
=112.7622 kw
QS = 112.7622 kw or 32.0712 TR
FOR LIGHTING
A = 40.8m x 20m
A = 8778.8544 ft2
QS = 26.2365kw or 7.462 TR
Total Qs:
Qs =313 .8067 kw
Qs = mcp(Tout – Tin)
313.8067 = m(1.005)(37-22)
Mair = 20.8164 kg/s
PV = MRT
V = MRT / P
= (20.8164)(.2871)(22 + 273) / 101.325 – 1.3225
= 17.6299 m3 / s
V = 37,326.9608 ft3/min
V=4x5x6
= 120 m3(1ACH)
= 120 m3/hr (1hr/3600s)
V= .0333m3 / s
PV = MRT
Minf. = (101.325-3.7686)(0.0333)
(.2871) (37+273)
Minf =0.0365kg/s
Qinf = 0.0365(1.005)(37-22)
Qinf = 0.5502kW
6.0m
Qs =AU(tout – tin)
Qs = (4x6)(37-22)
0.0254
0.78
Qs = 11055.1W x 1kW
1000W
Qs = 11.0551kW
Lightings:
Qs = 20m2x(3.28ft)2 x3W
(1m)2 ft2
Qs =645.504W
Qs=3.4BTUH x 645.504W x 1TR x 3.516kW
W 12,000BTUH 1TR
Qs=0.6431kW
2nd Floor
FOR INFILTRATION
W= 15m
L = 40.8m
H = 6m
@For Outdoor :
Pvo = .6(6.281)
@ Indoor
RH = Pvi / Psat
V = 15m x40.8 m x 6m
= 4896 m3 ( 1.0 ACH)
= 4896 m3 x 1hr
Hr 3600s
Lightings
A = 6.2 x5
= 31m2 x (3.28 ft/ m)2 (3w/ft2)
= 20139.7248w
Qs=3.4BTUH x 20139.7248W x 1TR x 3.516kW
W 12000BTUH 1TR
Qs=20.0632kW
V = A x H x1ACH
= 624 x 6 x 1
= 3744m3/hr (1hr/3600s)
V = 1.04m3/s
PV=mRT
Minf = (101.325-3.7686)(1.04)
0.2871 (37+273)
Minf = 1.14kg /s
Qsinf =1.14(1.005)(37-22)
Qsinf= 17.1855kW
QT = 305 w / occ
SHR = 0.35
SHR = QS / QT
0.35 = QS / 305
QS =( 106.75 w / occupants ) ( 300 occupants)
= 32025 w x 1kw/ 1000w
Qs= 32.025 kw
QL = QT - QS
= 305w – 106.75 w
For Slab
QS = A U (Tout – Tin )
QS = 18.721 kw
6.0m
Glass
QS = A U (Tout – Tin )
=41456.69291 x 2 x 1kw/1000w
QS = 82.91 kw
FOR WALL
6m
2.4m
Glass
QS = A U (Tout – Tin )
=6633.07w x 1kw/1000w
QS = 6.63 kw
Total Qs:
Qs =177.5347 kw
Qs = mcp(Tout – Tin)
177.5347 = m(1.005)(37-22)
Mair = 11.7768 kg/s
PV = MRT
V = MRT / P
= (11.7768)(.2871)(22 + 273) / 101.325 – 1.3225
= 9,97m3 / s
V = 21,123.83 ft3/min
For Slab
QS = A U (Tout – Tin )
QS = .93 kw
For Infiltration
V = 186
= 186 m3(1ACH)
= 186 m3/hr (1hr/3600s)
V= .0517m3 / s
PV = MRT
Minf. = (101.325-3.7686)(0.0517)
(.2871) (37+273)
Minf =0.0567kg/s
Qinf = 0.0567(1.005)(37-22)
Qinf = 0.8548kW
Qs =AU(tout – tin)
Qs = (6x6.2)(37-22)
0.0254
0.78
Qs = 17135.43307W x 1kW
1000W
Qs = 17.1354kW
Lightings:
Qs = 31m2x(3.28ft)2 x3W
(1m)2 ft2
Qs =1000.5312W
Qs=3.4BTUH x 1000.5312W x 1TR x 3.516kW
W 12,000BTUH 1TR
Qs=0.9967kW
FOR TENANT:2-02 to 2-08 THERE IS ADDITIONAL LOAD FROM SLAB FROM THE
DATA FROM THE GROUND FLOOR Q AT 1-02 ,Q AT 2-02 + 1-02
QS =AU(tout-tin)
QS =3.893+ .1706
Qs = 4.06TR
QS =AU(tout-tin)
QS =7.823+ .1706
Qs = 7.99TR