Sunteți pe pagina 1din 13
Gipsy |_raior PSS ‘Sixireases provided IESE (Kva) with Pressurization | 2 (tenn td 200 r Basement System. lab ‘Sinoke Control System ta VA sah EE Basement Mile eae eae laid . += -FM200 || Other ‘Located at I Ba | | Fire Fire Extinguisher ov idle | | Suppression NA Command Fire Blanket x | | system Center "lans Submitted / Mtoe!) clabiat) (Others)s8) BM (ACMV) Aye Us (FA) SIA (FF) oY (BP) Background / ati 25 pd pital Etbal cupid alsa (Suithy iat pUbat ala) 5 oY) ade cant del gia gp hall UEsikiy Gand 9s all 2015 Aiud spection of the above project have been done under the authority of the General ration of Civil Defence implementing the Civil Defense Law Number(25) year 2015. Inspection Report / sii) yj Copel) Cyl all Lath ian ca JS pylany ODE] & 5 ycball (stds a ‘The inspection has been done with the attendance of Owner representative and Contractors. Teed Bal Ge UE CBS i 2nd Inspection Passive Fire Safety System Cs Banal) Apap) ba all Lib (5 all lg La gle Be cas GI Gia NEPABO agSll cis YpusS 3 Coe Stat copy pital GLE Fire resistance rating of doors shall be in accordance with CDD a. Not Complied. approved drawing and Installed as per NEPA80 (Some alleged fire rated door (e.g. double leaf swing doors) does not provided with | isa $45 pall pW Kills ye Gy pall a gall ) V7) abel ite | identification _label/marking | a. Submitted/presented fire door CDD certificate is not in indicating its fire protection | conformity with the fire doors installed on site, and some fire rating, listed laboratory & | rated doors does not have CDD certificates. (e.g., wooden door, ‘manufacturer's name logo.) | ete.) b. Complied b. Fire rated doors shall be provided in Qtel, SNC & WM & Garbage Rooms as per CDD approved Building Plan drawings with PS No. M/2017/0001363. Gaal Lagliny inl pial ge Sauces Up Oy peel 3S Ga Gh, apy ile Leia, Sb Zh Zea c. Complied c. Fire rated doors shall be provided with CDD approved hinges, self-closing device, hardware, vision panel, etc. and properly closing. Sele yt esi Seals nN oS Yow IS (gli Page 2 of 15 (€-2019-0001305-F : TN Ail; . Complied e. Complied £ Complied g. Complied h, Not Complied i. Not Complied d._ All fire door leaf in the staircase shall be maintained to be kept closed at all times and not subject for locking Ses case ol Le se Ga ll UV aS aa ASU OSS YO! y aypel clad ea Ge alleged VI eSB Ol an celiall Gs yh Ge ee ©. Emergency exit doors shall not be key operated and shall swing to the direction of exit. Ags 90 Gy dels JS LN ety Gy Ga £. All exit door leaf shall be fully open in 90 degrees. aes pl Layla ian le Mita! nll tial ya FEY Gans g. The fire rating of the doors shall be maintained as per manufacturer catalogue. h. The clearances between the top and vertical edges of the door and the frame, and the meeting edges of doors swinging in pairs, shall be 18 in. + 16 in. (3.18 mm + 1.59 mm) for steel doors and shall not exceed 18 in, (3.18 mm) for wood doors. Hence, some doors are not in compliance with the above ‘mentioned NFPA clause noted at the time of inspection. i. One door leaf in a pair of door leaves shall not less than a 32 in. (810 mm) clear width opening. (e.g. A pair of door leaves is Jess than a 32 in. (810 mm) clear width opening.) Complied “+f NEPAIOL 2yStl quan @ Sal cago le 4000 LS gag Gay (UES PUSH TOOPEN=eada | All exit doors shall be provided with the signage above as per NFPA 101 a. Not Complied L Page 3 of 15 (Air Ducts) +1541 cis gaa! (Fire Damper) Gall G8 asia Aaa!) BEST Gaus Gua Layla La gh laa te Mikal) All air ducts that penetrates on fire rated walls and floors shall be provided with CDD approved fire dampers in accordance with CDD approved drawing. RHR Cy El age yall Sl GLI perl SS Cony | ABS. a. All fire damper located in concealed ceiling shall be provided with ceiling access panel and marking. (€-2019-0001305-F : TN sll 5 ‘b. Submitted letter from Trinity Qatar not substantiated with manufacturer's listing test report. ¢. Not Complied a nligh oo ee Oy ge OS b. Submit Letter of Confirmation stating that all smoke exhaust ducts are fire rated. ¢. Installed fire dampers not provided with listing label indicating the manufacturer's name, fire rating, listing mark, etc. a. Not Complied b. Not Complied Sapa La lie Bain apy pla gd Bap gall Chat apes LEI ay Saved) cilia) ua, Openings/penetrations at fire rated walls/slabs shall be completely closed/sealed off with CDD approved fire resistive materials as per CDD approved plan. a. Some electrical cable trunks, conduits and ducts penetration | 4 thru fire rated walls/floors were not properly sealed with approved fire stopping materials. check and rectify. b. Some fire stopping materials applications did not bear appropriate tagging indicating the type of materials used, rating, ete, Complied ISDH Gil Eyl OsG Olas! Stairs treads and landings shall be slip resistant. 5 a. Complied b. Complied sNEPALOL 2381) litle cue C1983 o! cy Gall Gad Handrails shall be provided on stair, in accordance with NFPA 101. a. Stairs and ramps (internal & external of the building) shall have handrails on both sides, Ape ge Og! GAY) yt aia Meats oy ad Lag 5S ol aa oe b. Handrail ends shall be returned to the wall or floor or shall terminate at newel post. uby) Aabsl Firefighting Systems -NFPALO 258 ques 494) Gall OU ais GS Ga Portable Fire Extinguishers shall be installed as per NFPA 10 and approved CDD drawing with PS no. M/2017/0001363-F drawing no. FAS-00A Page 4 of 15 C-2019-0001308-F : TN lll i » _ 9 pied GUN Gs Gaal) CUS Gaus SUbY ALB USS CoS Ol Ga 2001 ,A17 16 ,13 ,24 22,20 pd) apc eye ass NFPA jalan 2010 Installation of firefighting system shall be in accordance with CDD approved drawing and NFPA NFPA 13, 14, 20, 22, 24, 13, 16. (automatic air vent) S145,9) elpgl yLbas fas gloat waite cla le) sal! <1 (RISER) 21-11 a. Noted a. Automatic air vent of riser shall be outside the building/roof deck. Fa SOU Aaland 6 yall As ye Sb Gan Os b. Not Complied b. Check the coverage of sprinkler. NAD 4) Ae gen LE yall Guy y laa Gan ce c. Complied c. Painted and missing escutcheon plate of sprinkler shall be replaced and provided. SISSY Gas alfa pally LS pall ay5) ce Aiea haat Gis AE yl oy AL Gas . Complied 4. Reetify distance/spacing of sprinkler heads from vertical walls and obstruction. The distance from sprinklers 10 walls shall not exceed %” of the minimum distance between sprinklers. 98 AS le hy ase) ll add GLE al Gay lye Ui Gans Ese Bl CLE po eh iy he 1.2 Ge SI Lage gl e, Not Complied ¢. Air ducts having a width of at least 1.2 meters shall be provided with an appropriate upright sprinklers. f. Sprinkler head inside garbage chute not provided with approved protection | CABa%e lial 4ihcia) ain 6 gS (Gail! Jubd /yaaill pic) JiR guard, pt) (Sutil 4 St * Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report. 4 epi GU ye Fatal Cabal ua all cae Ga ca NFPA 255s Fire Pump shall be installed in accordance to CDD approved drawings and NFPA 3’ Chal ESS IS (gil 25) ULSI GLE a uy5) 6 ane apt a Kk Case IIL DU AS al oie IE La Page Sof 15 C-2019-0001305-F : TN lll! 3» take a. Complied . A supply of at least six spare of each type of sprinklers (never fewer than six) with special sprinkler wrench shall be maintained, provided and kept in the cabinet. Bal ead oe ossone b. Complied b. Water Alarm gong shall be located outside the room Cia caall jay Yold daggs Alb oS os c. Complied ¢. Room shall be provided with proper ventilation system jel Fae pale Jy tala ile aS Sac 4. Complied d. Thermal insulation shall be provided for diesel pump exhaust pipe J Ge 12in BOSmm) Ce GRY EU Le Atl, Sl DUM Ca Gans g fall ©. Complied ©. Current carrying cables shall be installed at least 12in (305 mm) above floor surface. £.Complied £. Installation of Eccentric reducer and concentric increaser is incorrect and it shall be approved type and listed. g. Complied g. Isolation/control valves shall be interfaced with fire alarm system and provided with identification tag. bh, Complied h, Low water level shall be interfaced with fire alarm system. Seal ole GUS cot ANN bg yl Bg Ga Fire water tank shall be provided with the following:~ DEW ALE yb Sale Gag snes lull 5 shee lds | a. Complied a. Visual water level indicator shall be made of non-combustible materials. 100 ce Jaa pan iy Y Cans 44S ely Lady fall Aes ge guns cs | HO “ b. Complied b. Marking of effective tank capacity in lettering of a minimum height of 100 mm. Balance Valve) sal es sises ye plang c. Complied c. Balance valve or equal Page 6 of 15 €-2019-0001305-F : TN ll $5 Sypute hb ap clos 3 Alntet Pipe) ote eS 435 4. Complied 4, Overflow pipe of minimum size, one diameter larger than the Kahrama inlet pipe. Sy pule phi Ge (Overflow Pipe) ail! 9280 CF ill plone pbb Ub Y gl ese e. Complied . Drain valve shall be 80 mm nominal diameter minimum. = NEPA 30 §NFPA 20 sue Jjyall GUUS iS ony Complied Diesel fuel tanks shall be installed in accordance with NFPA 20 } .11 and NFPA 30. t = AIA St Gaal aie 135Y) pL Jt Testing of Fire Alarm system FALLED due to the following == lll Gills ly Yaad dB cipal fee | a. Complied a. fire alarm sound (dB) level didn’t meet the requirements * Some sounder based detectors inside bedroom did not function. b. Complied b. Fire pump should not give building alarm during performance test. EYL cape cing pte c. Audible Alarm & Voice | c. Voice — mass notification system was not clearly heard. Evacuation message simultaneously activated during fire alarm testing d. Mimic/repeater panel to be test on the next inspection, d. Tested 2 SY! US Uae sie) pats (AUN ol pl JRL pre ¢. Complied . Visible signaling device (Strobe/flasher) shall be continuously working during the alarm mode Sail La Ssh ce Kin My Hay ySM SDL) gan pS) ose ny £. Complied f£ All devices and wiring circuits shall be monitored by control panel g. Not Complied &. FACP does not have supervisory alarm notifications. Sal ag) oi ILIV! 3 jel qeee anny Ge wis 2 h. Complied fh. All fire alarm devices shall be addressed and detailed properly in FACP, Page 7 of 15 €-2019-0001305-F : TN ll 6; SASL LI Acs Aa GS (Gell) JAB peal we) JET pa AN Gf 8 * Note: Due to non-completion or failure of testing or testing [rts more comments shall be added in the succeeding report. a. Complied b. Complied c. Complied 4. Complied e. Complied £ Not Complied. See CDD approved drawing with PS No. M/2017/0001363, drawing no. FAS-09. Spall ELAN oyu Baal LL Gan IL) AL Genads aS Scans eles -72, 4 NEPA Installation and testing of system shall be in accordance with CDD approved drawing and NFPA 72. Hing 36 Ge GS hats LN GANS ou HL SEY NL 0.91) a. Detectors should not be located in a direct airflow or closer than 36" (910mm) from an air supply diffuser or return air opening. REIS gun le Ge ASE LEY Ga b. Protective cover of detectors shall be removed. ae el AIR) NS gal gan Cast as ¢. all fire alarm equipment shall be fixed and mounted SI ial cess d. all fire alarm devices shall be labeled e. Detectors not provided with square box or junction box above false ceiling. f, CAMS (Central Alarm Monitoring Station) or automatic notification of Civil Defence Department shall be provided. a. Not Complied (e.g. Garbage Chute, etc) JVI pAb) LU a day ay All essential systems shall be interfaced with the fire alarm system. SSN play pall Lally 45 J Lat gue Lay Gans | a. All life/fire safety functions shall be interfaced with the fire | .14 alarm system ay SIN ly, AS paall sD) 45 jal 3 pga) gua ey cas SHSY aly (Ql. b._All_moving equipment (escalators, sliding doors, access L Page 8 of 15 €-2019-0001305-F ; TN Albi! 63 5 b. Not Complied c. Complied controlled doors .... Etc) shall be interfaced with the fire alarm system. NY! Ula Gig lS Sane gn c. AHU system shall be interfaced with the fire alarm system Tested NEPA 72 3980 ia Gu all thy oS ca ‘Two-way telephone shall be installed as per NFPA72. AGU Gl gly Lot Ly STI BDL G5 IE gl Gagan J) GUL Dla (IBY) A as Sa 4a DE ye alld gle Gp a. Wiring circuit shall be monitored for open and short-circuit and fault conditions shall result in a trouble signal in Control Panel. Dos Caine 5 ul ll ilps JIS Ga olegll Coad 4M Ec isl oi b. Two-way telephone system shall be common talk (i conference or party line circuit) permitting the simultaneous operation of any five (5) telephone stations. Qe Cais AL) Al alle pant Glad esos c Sate i ipl c. Each telephone station or jack shall be provided with permanent label indicating location of the device. Note: (location of telephone stations shall be indicated in the Command Center/ Control Room) 4d, Fire Telephone test failed. Lp CET Smoke Control Systems (ACMV) __ 5 Tested A pa Dl aaa lS aad yl Testing of Pressurization system NOT DONE due to the following:~ a. Exit stair’s pressurization | a. Incomplete test reports presented at site, 16 fan did not shut-off upon activation of smoke detector | cilbab MiLia) 4a! Ais cysSiuu (andl) Jud (yaaill psc) 11s o inside the exit stair enclosure. patil Auda (Bog 58} Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report. RG pa yp ls Ga ot] Complied Testing of Ventilation system to be done on the next |” inspection:- Page 9 of 15 (C-2019-0001305-F ; TN lhl 53, SLs iL) hacia! Ais pS (andl Jd /paaill psc) JLB pall) GA GB is 8 # Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report Test Failed (Sequence of operation of basement smoke fans is not in accordance with the presented cause & Effect Matrix.) tl aS LSM aS AS Gand a Testing of Smoke Control system NOT DONE due to the following:- a. Ventilation contractor is un-aware of the system installed at site. 18 adhe Aika) Aa! dia Gye (Gaal Jat yaad! pic) ti jBi o esl GSN G8 os 3 ‘* Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report. Not Complied ule 9 ited) pliaN Ops Bascal) Cabs cua plans aS Ss Gang 72 392 590 ei NFPA | .19 Installation and operation of systems shall be in accordance with CDD approved drawings and NFPA 90, 92 & 72. a, Complied b. Complied 9S Oly Saeed Ayesg ll cabal ane ALAM Sail dang pS any gl que Firefighter's Smoke Controls Station (FSCS) shall be provided in accordance with CDD approved drawing with PS no. 1/201 7/0001363, drawing no. MV-14, Base Sy SSE IS Ei 5 CUS Ga a. Appropriate identification labeling for each FSCS shall be provided. elpgl SLs — pli lye ay je De) tay SIL IOUS AS Gay ( b. Identification marking of fans and outlets/inlets shall be provided (e.g. “Fresh Air Supply”/ “Exhaust Ait”), Tested bby) GLI jilae Emergency Power Supply System 24 =A a oA 4S gal aad oy gl Page 10 of 15 (C-2019-0001305-F ; TN Albi! 63 5 Generator test to be done on the next inspection:- Shad Mikael iia! dia CS (andl Jd / anil pic) 1B» th Rs 81 ‘Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report. NEPAL10 3580 Ub 3.8! cus sabia) pil 480) gall (lS CaS 5 ay ‘NEPAIOL 3 Installation of EPSS (Emergency Power Supply System) shall be in accordance with NFPA 110 and NFPA 101. ph ay AB Lae GBM g py oh apes J jan od pad pall gle a Aa les a. Complied a. Length of the extended exhaust pipe/muffler for the diese! engine which may cause back pressure and engine Class II or ) el s3s'¥ Srerodell Li 58M peda jl) 1s geil Galil aay AES et OL os ie Oo ley cll @ 1S SSG) am ( Class I] b. Noted b. Vent pipes from tanks storing Class If or Class TILA liquids shall terminate outside of the building and higher than the fill pipe opening. AY ple Lyd AA ¢ LS Aa gl Ge ad GI eas Layeill Ga = si 24 slo 600 c. Noted ©. The vent pipe shall terminate outside the building at a point at least 600 mm (24 in.) from any building opening at the same or lower level. 22 d. New generator controllers shall be monitored by the Fire 4. Complied Alarm & Detection System (FDAS), where provided or at an attended location, for the following as per NFPA 101 New generator controllers shall be monitored by the Fire Alarm & Detection System (FDAS), where provided or at an attended location, for the following as per NFPA 101. © Generator running © Generator fault © Generator switch in non-automatic position. e. Not Complied ©. Provide identification/labeling in fuel supply system such as on fuel supply line, vent line and infill line. £ Complied f Visual fuel indicator or sight glass made of non- combustible materials shall be provided in fuel storage tank. g. Not Complied g. Provide appropriate fuel spillage containment intended for L the generator set with built-in fuel day tank. | h. Not Complied h. Protective cap and identification/labeling of filling inlet pipe for diesel tank shall be provided. welasl LIFT/ELEVATOR a, Complied b. Complied ©. Complied NFPA 101 and ASME Clihis Quis setiaall $05 yous Sosy Installation and operation of lifts shall be in accordance with NEPA 101 and ASME (Elevator Safety Code). US aye scans y 1 apes Me A ae spill og oh ay celal | dealt Gilall 4 si) a. Lifts shall home to ground upon receipt of fire alarm. Homing on alternate floor shall be provided. (Test Failed) Wea 9 se Laedl Jala oa 0 05S of py LOL Clg b. Lifts shall be provided with Safety Instruction inside and ‘outside the lift cabins, 23 soled Jy5ilueneiadl (ELD ) prea aul les pissy ¢ danas SSI ay ye c. Emergency Landing Device (ELD) shall be provided for each Tift. Made UL) Ayia is 6 gS (andl td (yall! pic) {Bi pal i 8 8 * Note: Due to non-completion or failure of testing or testing results, more comments shall be added in the succeeding report. ISM 9 get / Ala jY) CLaNA / lal! Gold jY) GLMAT 1 Exit/Directional Signs/Emergency Lights/Markings Complied CAM So coe Sains Aipsten (Cpe) Al CS IS Uae NFPA 101 45 Uiby «inal Every exit door shall be provided with illuminated CDD approved “EXTT” sign, in accordance with NEPA101. 24 Complied Ag UBB « cshtall PUB JB Oye Sain y Ligon Mas gl) LOLS cs Cay NFPA101 Directional signs shall be illuminated, CDD approved and 25 installed in accordance with NFPA101. Not Complied a. Emergency lights in Page 12 of 1S iby haat GLEAN is ca Basia pA gall pl pl JRA Cant Gans NEPAIOL 2sSt css y itll Cat J yu Baie cabs |“ CDD approved emergency lights shall be installed and operated ‘C-2019-0001305-F : TN lb) 535 — basement parking areaare | in accordance with and CDD approved drawing and NFPATOI insufficient. b, Submit Updated LUX Reading report. 9 Asay Gale , gg SN) GLNE ) ALE GLdla ¢ pay coe ssl) Gans | SENN gf anal 9) Sal 9S Gaye Ge YBle ase g (ig) ll pl pal gla) Complied Location of (exit signs, directional exit signs, emergency lights) | “2” shall be readily visible and no decorations, furnishings or equipment that would impair visibility of installed signs. Aaudly y dail (Ki ad A 3) bday aD) 555 Complied Staircases shall be provided with permanent & visible | 28 identification, Atel) ast / Si pth Db eyed Apa Lay pit) cL gt cay Aaa Ny Zap all cally | 29 Complied Appropriate markings of all important utility/service rooms shall be provided in Arabic & English. roman JS y so Leal ogy cof ANGI) pial Lidle Gus f Gay eal pha Y Gall pd Us Gd In Case of Fire Do Not Use Lift 30 Complied Warning sign shall be provided at each elevator lobby as stated above ~rMaLyall Ag A) lbh EN hs Ga Complied ‘The following requirements shall be provided for swimming pools:- 20 yf all aI Gul lah a hs a. Swimming pool shall be provided with English and Arabie Pool safety regulations 31 quullgulcaysebdle ahd yaics b. Swimming pool shall be provided with water depth safety markings. Ala gl a GSI asa pF og ¢. Pool area shall be provided with life safety rings. Page 13 of 15, (C-2019-0001305-F : TN lll! » Atha SY Slalg yy itll y Glatt Documents / Certifications to be Submitted in the System | an anon Bae rt Bins ll san pS! ny) (Reports shall be prepared by CDD certified contractor duly signed and stamped by consultant) a, Submitted b. Not Complied cc. Submitted dd. Submitted ©. Not Complied BABY (ple pata gp Letty pli Goa Laggide Gandy J aya ale Re-submit/upload in the system the testing & commissioning reports of the following listed below done by approved contractor and supervising consultant; it shall be signed/stamped by both parties. Galiceddwolspagke a. Diesel fuel tank calculation for fire pump. Fesilly onal gleill Uysal b. Actual Cause and Effect Matrix (Note: Systems integration in matrix shall be in accordance with NEPA 72 standard and shall be in accordance with QCD Planning Section Standard format and properly endorse, signed & stamped, by a Certified Responsible Supervising Consultant, and indicate his UPDA registration & QID on the plan). gill agg ls nc ¢. Smoke Control/ventilation system. 4. Complete Staircase pressurization test report PUY ya jal oS pple cs e. Diesel fuel tank calculation for Generator Not Complied (See remark 3.b) ANG 5 ig) y chaeall atl GLEN) ted lal past Submit/upload in the system all appropriate/updated CDD Product approval certificate for the devices used in the building listed below: Fire rated duets i 32 33 Submitted Ra glhall olga Coee Oly Say elated La Coe LS ts See ASG AFA call GUL J ca Bins YT hp! Quay Gall Apteal Cisal sal Letter from fire door assembly supplier/manufacturer stating that the fire door assemblies installed for the project including hinges, self-closing device, hardware, vision panel, etc, are fire rated as per listing test report. 34 bal eh Bag gal a a, EY 9 Aly aly g UN els ppt ual Lage sly 35 Page 14 of 15 €-2019-0001305-F : TN lal 9b

S-ar putea să vă placă și