Documente Academic
Documente Profesional
Documente Cultură
Equipment
Visit Type Rakelift Operation Report
Rakelift Operation Report No
Date of Service From dd mmm yyyy To dd mmm yyyy
Model Thickener Serial No.
Site Contact
Client - Present
1. PRE TEST CHECKS – these are to be performed prior to the rakelift operating
2. RUNNING CHECKS – These are to be performed during the initial operation of the
unit
3. POST TEST CHECKS – These items to be checked/completed a the end of the test
and before final handover
6.3. Gearbox 2
6.4. Gearbox 3
6.5. Gearbox 4
6.7. TurboDil 1
RAKE SURVEY
1............. mm .........mm
2............. mm .........mm
3............. mm .........mm
4............. mm .........mm
A ............ mm
B............. mm
C............. mm
D ............ mm
E............. mm
8. ACTION REQUIRED
CSE NAME
Customer Support Engineer
Tel: +61 X XXXX XXXX
Fax: +61 X XXXX XXXX
Mobile: +61 XXX XXX XXX
xxxx.xxxx@outotec.com
www.outotec.com
Item Noted by: Description, Priority Due Date Action by: Status Operational
Client Actions Required Low (dd mm yyyy) Responsible Completed Status
Outotec or Outstanding Med Party Pending (see Legend)
Works High
ACKNOWLEDGED BY:
Customer Support Customer
Engineer: Contact: Date:
LEGEND:
1. Inoperable 2. Water Fill Only 3. Run In Water 4. Compromised Run (refer Full Report) 5. Fully Operational