CABLE NO OF

S.NO FROM FEEDER DESCRIPTION CABLE DESCRIPTION TO FEEDER DESCRIPTION LENGTH RUNS

1 FROM BODY EARTH LINK-1 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-1A BE 6 1
2 FROM BODY EARTH LINK -2 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-1A BE 6 1
3 FROM BODY EARTH LINK -1 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-2A BE 6 1
4 FROM BODY EARTH LINK -2 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-2A BE 6 1
5 FROM BODY EARTH LINK -1 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-3A BE 6 1
6 FROM BODY EARTH LINK -2 120 SQ.MM COPPER FLEXIBLE CABLE TO UPS-3A BE 6 1
7 FROM BODY EARTH LINK -1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-1 BE 6 1
8 FROM BODY EARTH LINK-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-1 BE 6 1
9 FROM BODY EARTH LINK-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-2 BE 6 1
10 FROM BODY EARTH LINK-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-2 BE 6 1
11 FROM BODY EARTH LINK-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-3 BE 8 1
12 FROM BODY EARTH LINK-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-3 BE 8 1
13 FROM NEUTRAL EARTH LINK BOX-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-1 NE 6 1
14 FROM NEUTRAL EARTH LINK BOX-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-1 NE 6 1
15 FROM NEUTRAL EARTH LINK BOX-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-2 NE 8 1
16 FROM NEUTRAL EARTH LINK BOX-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-2 NE 8 1
17 FROM NEUTRAL EARTH LINK BOX-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-3 NE 8 1
18 FROM NEUTRAL EARTH LINK BOX-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-3 NE 8 1
19 FROM NE-4 120 SQ.MM COPPER FLEXIBLE CABLE TO SRG 30 1
20 FROM LT PANEL-1A 120 SQ.MM COPPER FLEXIBLE CABLE TO 120 KVA UPS-3 14 4
21 FROM LT PANEL-1A 120 SQ.MM COPPER FLEXIBLE CABLE TO 120 KVA UPS-2 MCOS- A SOURCE 12 4
22 FROM LT PANEL-1B 120 SQ.MM COPPER FLEXIBLE CABLE TO 120 KVA UPS-1 14 4
23 FROM LT PANEL-1B 120 SQ.MM COPPER FLEXIBLE CABLE TO 120 KVA UPS-2 MCOS- B SOURCE 12 4
24 FROM 120 KVA UPS-2 MCOS 120 SQ.MM COPPER FLEXIBLE CABLE TO 120 KVA UPS-2 10 4
25 FROM 120 KVA UPS-1 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-1A 12 4
26 FROM 120 KVA UPS-2 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-2A 10 4
27 FROM 120 KVA UPS-3 120 SQ.MM COPPER FLEXIBLE CABLE TO PDU-3A 10 4
28 FROM UPS NE-1 185 SQ.MM COPPER FLEXIBLE CABLE TO EARTH LINK BOX-1 30 1
29 FROM UPS NE-2 185 SQ.MM COPPER FLEXIBLE CABLE TO EARTH LINK BOX-2 32 1
30 FROM EARTH LINK BOX-1 185 SQ.MM COPPER FLEXIBLE CABLE TO EARTH LINK BOX-2 3 1
31 FROM UPS NE-3 185 SQ.MM COPPER FLEXIBLE CABLE TO EARTH LINK BOX-2 35 1
32 FROM EARTH LINK BOX-1&2 25 SQ.MM COPPER FLEXIBLE CABLE TO 30 KVA UPS-5 BODY EARTH 4 1
33 FROM EARTH LINK BOX-1&2 25 SQ.MM COPPER FLEXIBLE CABLE TO 30 KVA UPS-4 BODY EARTH 4 1
34 FROM EARTH LINK BOX-1&2 25 SQ.MM COPPER FLEXIBLE CABLE TO MECH DISTRIBUTION DB-A 4 1
35 FROM EARTH LINK BOX-1&2 25 SQ.MM COPPER FLEXIBLE CABLE TO MECH DISTRIBUTION DB-B 8 1
36 FROM LT PANEL-1A 25 SQ.MM COPPER FLEXIBLE CABLE TO 30 KVA UPS-4 24 4
37 FROM 30 KVA UPS-4 25 SQ.MM COPPER FLEXIBLE CABLE TO MECHANICAL DIST DB-1A 8 4
38 FROM LT PANEL-1B 25 SQ.MM COPPER FLEXIBLE CABLE TO 30 KVA UPS-5 26 4
39 FROM 30 KVA UPS-5 25 SQ.MM COPPER FLEXIBLE CABLE TO MECHANICAL DIST DB-1B 12 4
40 FROM SUBSTATION PANEL-4 3.5C x 300 SQ.MM AL.AR.XLPE CABLE TO LT PANEL-1A 210 3
41 FROM SUBSTATION PANEL-3 3.5C x 300 SQ.MM AL.AR.XLPE CABLE TO LT PANEL-1B 210 3
42 FROM TIE BREAKER-1A 3.5C x 300 SQ.MM AL.AR.XLPE CABLE TO TIE BREAKER-1B 15 3
43 FROM LT PANEL-1A 3.5C x 35 SQ.MM AL.AR.XLPE CABLE TO CHILLER-1 ISOLATOR 30 1
44 FROM CHILLER-1 ISOLATOR 3.5C x 35 SQ.MM AL.AR.XLPE CABLE TO CHILLER-1 35 1
45 FROM CHILLER-2 MCOS 3.5C x 35 SQ.MM AL.AR.XLPE CABLE TO CHILLER-2 ISOLATOR 30 1
46 FROM CHILLER-2 ISOLATOR 3.5C x 35 SQ.MM AL.AR.XLPE CABLE TO CHILLER-2 30 1
47 FROM CHILLER-3 ISOLATOR 4C x 25 SQ.MM CU.AR.XLPE CABLE TO CHILLER-3 35 1
48 FROM PUMP-2 ISOLATOR 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO CHILLER-1,2,3 UPS SUPPLY 40 1
49 FROM RDHX-A DB 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO RDHX PDU-1 8 1
50 FROM RDHX-A DB 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO RDHX PDU-3 10 1
51 FROM RDHX-B DB 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO RDHX PDU-2 12 1
52 FROM RDHX-B DB 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO RDHX PDU-4 14 1
53 FROM UPS DB 3C x 6 SQ.MM COPPER FLEXIBLE CABLE TO BMS RACK 15 1
54 FROM MECH DIST DB-1A, 32A, TP MCB 4C x 10 SQ.MM COPPER FLEXIBLE CABLE TO UPS DB 25 1
55 FROM MECH DIST DB-1B 4C x 10 SQ.MM COPPER FLEXIBLE CABLE TO ATOS PANEL 25 1
56 FROM LT PANEL-1A 4C x 16 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAHU-1 HEATER & HUMIDIFIER 30 1
57 FROM LT PANEL-1B 4C x 16 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAHU-2 HEATER & HUMIDIFIER 30 1
58 FROM LT PANEL-1A 4C x 25 SQ.MM CU.AR.XLPE CABLE TO CHILLER-2 MCOS SOURCE-A 15 1
59 FROM LT PANEL-1B 4C x 25 SQ.MM CU.AR.XLPE CABLE TO CHILLER-2 MCOS SOURCE-B 15 1
60 FROM LT PANEL-1B 4C x 25 SQ.MM CU.AR.XLPE CABLE TO CHILLER-3 ISOLATOR 35 1
61 FROM MECH DIST DB-1B 4C x 4 SQ.MM AL.AR.XLPE CABLE TO PUMP-1 MCOS SOURCE-B 30 1
62 FROM MECH DIST DB-1B 4C x 4 SQ.MM AL.AR.XLPE CABLE TO PUMP-2 MCOS SOURCE-B 30 1
63 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAHU-1 MCOS SOURCE-A 25 1
64 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAH-2 MCOS SOURCE-A 25 1
65 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO BATTERY ROOM PAHU-1 MCOS SOURCE-A 10 1
66 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO BATTERY ROOM PAH-2 MCOS SOURCE-A 8 1
67 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO PUMP-1 MCOS SOURCE-A 30 1
68 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO PUMP-2 MCOS SOURCE-A 30 1
69 FROM MECH DIST DB-1A 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO RDHX DB-A 25 1
70 FROM MECH DIST DB-1B 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAHU-1 MCOS SOURCE-B 30 1
71 FROM MECH DIST DB-1B 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO SERVER ROOM PAH-2 MCOS SOURCE-B 30 1
72 FROM MECH DIST DB-1B 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO BATTERY ROOM PAHU-1 MCOS SOURCE-B 12 1
73 FROM MECH DIST DB-1B 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO BATTERY ROOM PAH-2 MCOS SOURCE-B 10 1
74 FROM MECH DIST DB-1B 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO RDHX DB-B 28 1
75 FROM CHILLER-2 ISOLATOR 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO DOSHING PUMP-1 16 1
76 FROM CHILLER-2 ISOLATOR 4C x 4 SQ.MM COPPER FLEXIBLE CABLE TO DOSHING PUMP-2 16 1
77 FROM PUMP-1 MCOS 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-1 ISOLATOR 32 1
78 FROM PUMP-2 MCOS 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-2 ISOLATOR 35 1
79 FROM PUMP-1 ISOLATOR 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-1 STARTER PANEL 10 1
80 FROM PUMP-2 ISOLATOR 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-2 STARTER PANEL 10 1
81 FROM PUMP-1 STARTER PANEL 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-1 13 1
82 FROM PUMP-2 STARTER PANEL 4C x 4 SQ.MM CU.AR.XLPE CABLE TO PUMP-2 15 1
83 FROM CHILLER-2 ISOLATOR 4C x 6 SQ.MM COPPER FLEXIBLE CABLE TO PRESSURE PUMP-1&2 20 1
84 FROM PDU-1A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SPARE RACK-1 8 1
85 FROM PDU-1A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO STORAGE RACK 8 1
86 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SERVICE RACK 10 1
87 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-3 12 1
88 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-2 12 1
89 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-1 12 1
90 FROM PDU-2A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SPARE RACK-2 8 1
91 FROM PDU-2A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO STORAGE RACK 8 1
92 FROM PDU-2A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SERVICE RACK 10 1
93 FROM PDU-2A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-3 12 1
94 FROM PDU-2A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-2 12 1
95 FROM PDU-2A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-1 12 1
96 FROM PDU-1A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SPARE RACK-2 8 1
97 FROM PDU-1A, FP,32A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SPARE RACK-1 8 1
98 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-3 12 1
99 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-2 12 1
100 FROM PDU-1A, FP,63A 5C x 10 SQ.MM COPPER FLEXIBLE CABLE TO SEQUENA RACK-1 12 1
TOTAL
TOTAL CABLE
CABLE
LENGTH TERMINAT
IONS
6 2
6 2
6 2
6 2
6 2
6 2
6 2
6 2
6 2
6 2
8 2
8 2
6 2
6 2
8 2
8 2
8 2
8 2
30 2
56 8
48 8
56 8
48 8
40 8
48 8
40 8
40 8
30 2
32 2
3 2
35 2
4 2
4 2
4 2
8 2
96 8
32 8
104 8
48 8
630 6
630 6
45 6
30 2
35 2
30 2
30 2
35 2
40 2
8 2
10 2
12 2
14 2
15 2
25 2
25 2
30 2
30 2
15 2
15 2
35 2
30 2
30 2
25 2
25 2
10 2
8 2
30 2
30 2
25 2
30 2
30 2
12 2
10 2
28 2
16 2
16 2
32 2
35 2
10 2
10 2
13 2
15 2
20 2
8 2
8 2
10 2
12 2
12 2
12 2
8 2
8 2
10 2
12 2
12 2
12 2
8 2
8 2
12 2
12 2
12 2
General-Electrical implementation - CDAC - IISER-Pune
ELECTRICAL LT WORKS
Sl.No Description
B DISTRIBUTION BOARDS
B2 LIGHTING & RAWPOWER POWER DISTRIBUTION BOARDS

B2.1 Lighting Distribution Boards- 8Way TPN DB (7 Segment double door type)
Incomer : 32A 4P MCB -1 No
Sub-Incomer : 32A DP RCCB of 30 mA -3 Nos
Outgoings : 16A SP MCB – 7Nos, 6A SP MCB – 11Nos

B2.2 Raw Power Distribution Boards / EmergencyDB 8 Way TPN DB


Incomer : 32 A TP MCB -1 No
Outgoings : 10A & 6A SP MCB – 8 Nos.

B2.3 RDHXDB - 8 Way TPN DB


Incomer : 40 A TP MCB -1 No
Outgoings : 16A SP MCB – 8 Nos.

A LT CABLES
Supply, Laying, Testing and Commissioning Multi core / Single
core Copper conductor – Armored / Unarmored / Flexible, XLPE insulated cables
of Voltage grade 1100Volts, laid over Galvanized or MS powder coated perforated cable trays
and MS supports with Anti-corrosive paint / in excavated Trench / in duct / fixing on walls // laying in
Ground soild by removing and refilling Soil
including Galvanized clamping support to the cable as per approved
implementation drawing.
Taping and terminating connectivity to be identified with aluminum tags
plate describing cable size, no. of runs etc.
Cable shall be laid in trench / pipes / tray without any cable joints between two
end connection.
Insulation resistance shall be measured before laying and charging with
calibrated meggar.
The exact cable calculation along with voltage drop to be provided.

A1 Multicore Aluminum conductor Armored Power Cable type AL XLPE in Sq. mm


A1.1 3.5 C x 300
A1.2 3.5 C x 35
A1.3 3.5Cx 4 SqmmAl XLPE
A1.4 3.5Cx150SqmmAlXLPE
A2 Multicore Copper conductor Armored Power Cable type Cu XLPE in Sq. mm
A1.1 3.5 C x 185
A1.2 3.5C x 95
A2.1 4 C x 25
A2.2 3.5C x 4

A3 Multi stranded Copper Flexible cables – Sizes in Sq. mm


A3.1 1C x 120
A3.1 1C x 25
A2.2 4 C x 16
A2.2 3.5C x 10
A3.2 4Cx4
A3.2 5 C x 10 (PDU to sockets)
A3.3 3 C x 6 (1 PH Racks sockets)

A Sub Total – LT CABLES


B LT CABLE TERMINATION
Supply, implementation, Testing and Commissioning of Compression type cable
gland and copper lugs/ sockets for copper cables, insulation sleeves,
with adequate grounding copper clamps & copper
wire for gland grounding for the following size of the cables
Ref Standard: BS 6121 for Double compression for Cables sizes above 95Sq.mm;
Single compression rest of the cables sizes.
Gland type:Brass nickel plated
Compression: Single for Indoor,Double for Outdoor
Sealing Ring:Natural rubber for indoor, Neoprene for Outdoor

A1 Multicore Aluminum conductor Armored Power Cable type AL XLPE in Sq. mm


A1.1 3.5 C x 300
A1.2 3.5 C x 35
A1.3 3.5Cx 4 SqmmAl XLPE
A1.4 3.5Cx150SqmmAlXLPE
A2 Multicore Copper conductor Armored Power Cable type Cu XLPE in Sq. mm
A1.1 3.5 C x 185
A1.2 3.5C x 95
A2.1 4 C x 25
A2.2 3.5C x 4(4C x 4)

A3 Multi stranded Copper Flexible cables – Sizes in Sq. mm


A3.1 1C x 120
A3.1 1C x 25
A2.2 4 C x 16
A3.2 4Cx4
A3.2 5 C x 10 (PDU to sockets)
A3.3 3 C x 6 (1 PH Racks sockets)

Sub Total – LT CABLE TERMINATION


C SUBMAINS/CIRCUIT MAINS /POWER WIRING
The rate shall include civil works such as grooves in walls, floors chipping,
rough plastering, floor level etc. providing MS brackets for conduit suspension.
Circuit mains shall be measured from DB to switch board and looping from
switch board to switch board.
Inside data center area only metal conduits needs to be used.
Each circuit / wire shall be ferrule numbers on both the ends, including the terminations
using tinned copper lugs.
Each conduit shall be separately clamped with supports / saddles and base plates at
every 600mm c/c. Cost to cover conduits.
C1 Circuit Mains for lighting / power circuit
C1.1 2 Runs of x 2.5 + 1 Run x 1.5 Sq mm copper conductor wires for
Lighting distribution

C1.2 3 Runs x 2.5 Sq. mm copper conductor PVC insulated FRLS wires overall FRLS
PVC Sheathed Cable run in conduit / Raceways for UPS / power distribution.

C1.3 3 Runs x 4 Sq. mm copper conductor PVC insulated FRLS wires overall FRLS
PVC Sheathed Cable run in conduit / Raceways for UPS / power distribution.

C2 Point Wiring

Wiring of light points, fan points, socket outlets, occupancy sensors by using 2mm thick MS conduit

of required dia as per IEC Standard, LSZH PVC reinforced flexible conduit with couplers
for drops with accessories & 3runs X 1.5Sqmm YY Cu. Cable. approved 5A
modular type switches and sockets, GI / PVC boxes, and other point
wiring accessories and carrying out surface /concealed conduit point wiring.
The point wiring should include the occupancy sensors if provided in the circuit
All points shall be earthed with 1sqmm LSZH flexible copper wire.
Points shall be terminated at light fixtures with ferrules, 15A 4 way connector;
wire ends shall not be loose / bare. The rate shall include necessary civil works
for embedding conduits and boxes
The Wires for lighting & power should be LSZH
C2.1 1 light point controlled by a 6A switch

C2.2 2 light points controlled by 6A switch

C2.3 2 light points controlled by 6A switch and occupancy Sensor

C2.4 3 light points controlled by 6A switch

C2.5 3 light points controlled by 6A switch and occupancy Sensor

C2.6 4 light points controlled by 6A switch


C2.7 4 light points controlled by 6A switch and occupancy Sensor

Sub Total – SUBMAINS/CIRCUIT MAINS /POWER WIRING


D CABLE TRAY AND PATHWAYS FOR POWER DISTRIBUTION

D1 Supply and fixing of Ladder type cable trays


Rate Shall include the Accessories like couplers, right angle bends, off sets, 'T' bends Hi-tech
suspenders, 'C' channels, anchor bolts etc., as required. In trench, MS supports to be included
1 600mm x 100mm ladder trays
2 300mm x 100mm ladder trays

D2 Supply and fixing of per-fabricated factory made Perforated folded


type cable tray. The tray shall be fabricated out of 2.0mm thick per-galvanized
steel sheet conforming to local norms applicable.
Rate Shall include the Accessories like couplers, right angle bends, off sets, 'T' bends Hi-tech
suspenders, 'C' channels, anchor bolts etc., as required. In trench, MS supports to be included

D1.4 450 mm W x 100mm GI perforated type in ceiling/floor


D1.5 200mm W x 100mm GI perforated type in ceiling/floor
D1.5 300mm W x 100mm GI perforated type in floor/Ceiling
D1.5 150mm W x 100mm GI perforated type in floor/Ceiling
D1.6 150MM W x 100mm basket Raceway Ceiling mounted
Sub Total – CABLE TRAY AND PATHWAYS FOR POWER DISTRIBUTION
Total - LT Cable and Trays, Wiring

Sheet 3
BoQ for Lighting,Power Outlets

ELECTRICAL WORK
Sl.No Description
A Modular Power receptacles
Supply, implementation, Testing and Commissioning of the following Modular /
Industrial Switch, sockets with mounted flush on to the partition / wall using
necessary fixing & wiring accessories including G.I outlet boxes, reinforced face
plates, blank inserts etc. including cutting open the cutouts for switch plates on
partition, civil works such as wall chasing, finishing to the level etc., and
as required as per the site conditions.
The rates quoted shall be for any required color, back metal boxes. The boxes shall be provided
with 2 nos. earthing terminals and required interconnecting wiring.

A1.1 3 x 13Amps 3pin Brushed stainless steel socket outlet controlled by one 16 Amps switch
A1.2 2 Nos. 13Amps 3pin Brushed stainless steel socket outlet controlled by one 16 Amps switch

A1.2 1 Nos. 13Amps 3pin Brushed stainless steel socket outlet controlled by one 16 Amps switch

A2 Polycarbonate Type :
Factory made totally enclosed with enclosure/ back box along with Polycarbonate
plug & socket with MCB control with enclosure
including interal connection with 6Sq. Mm, scrapping earth connection and plug
top. All switches & sockets shall be housed in powder coated MS boxes. The
erection rate shall include supply of angle iron frame work and fixing
accessories bolts / grouting etc. such as grip bolts etc. as required.

A2.1 32 Amps, single phase 3-pin industrial plug and socket with DP MCB control,
including the plug top. IEC 60309.

A2.3 63 Amps, three phase 5-pin industrial plug and socket with 4P MCB control,
including the plug top conforming to IEC 60309.

Sub Total - Modular Power receptacles

B LUMINAIRES WITH LED'S


The following light fixtures with lamps / tubes with required fixing accessories
inter connection cables, termination etc. complete, as required.
Lamp type: LED, cool daylight, ensuring an effective low-glare
All LED fixtures shall be with high power factor, low harmonic (THD< 10%) (THD= Total Harmonics
Distortion) and minimum 100 lumens/watt.

All housings shall be cast aluminium only. Sheet metal housing is not acceptable for outdoors
luminaries. All outdoor luminaries shall be rated at IP 65. Fixtures construction shall be suitable for
maintenance from bottom unless otherwise specified and shall be screw less press fit as far as possible

IEC compliant for Safety and Performance


Make: Philips, GE,Thorn or equivalent approved make
Recessed Mounted(600mm X 600mm) LED luminire suitable for 36X1W LED Light fitting with high
B1.1 frequency Electronic Drives,Earthing terminals, easily replacing in Grid Ceiling fixing.

Recess mounted circular LED Downlighter with special frosted diffuser. Suitable for 18W LED with all
B1.2 accessories like low loss, high frequency Electronic Drives and fixing, each light fitting provided earth-
terminals

B1.3 Surface Mounted Box type(1200mm) LED Luminare with high frequency Electronic drive

Occupancy sensor suitable to control row wise lighting (CLIPSAL/ LEGRAND or equivalent approved)
B1.5 with all necessary control or power wiring to the nearest 3/ 4 light fittings

B1.6 Safety light system with Exit sign in Hindi & English along with directional arrows, supports etc
SUB TOTAL – Modular Luminaire
Total - Lighting, Power Outlets

Sheet 4
BoQ for GROUNDING SYSTEM

ELECTRICAL GROUNDING WORKS - Supply & implementation


The grounding scheme (detailed drawings) needs to be followed for details of the system.
The local rules and methods of the grounding system needs to be followed apart from the schematic
drawings. Any major changes needs to be approved by Owner's representative
Sl.No Description
A GROUND PITS

A1 Earth Pits The earth electrode resistance shall not exceed 3 ohm
Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and watering
pipe of 3 meter long etc. with charcoal/ coke and salt as required.including excavation, refilling &
complete as required, including heavy duty cast iron cover chamber.
The 50mm X 6 mm separate copper bulbar shall provide for termination of the earth cables and
necessary accessories.( Like Nuts and bolts with suitable washers).

Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing
masonry enclosure with heavy duty cover plate having locking arrangement and watering pipe of 3
meter long etc. with charcoal/ coke and salt as required.
The 50mm X 6 mm separate copper busbar shall provide for termination of the earth cables and
necessary accessories

Maintenance free Chemical Copper Earth Pit Supply, Installation, Testing and Commissioning of
Chemical type earthing with minimum 3.0 metre long ( Chemical type ) earth pipe set with back fill
A1.1 compound, bus for termination, SS bolts, nuts, and washers etc.shall be corossion free, including
excavation, refilling & complete as required, including FRP Cover and all associated civil works like
construction of RCC chamber and rough plastering etc.

Maintenance free Chemical GI Earth Pit Earth Pit Supply, Installation, Testing and Commissioning of
Chemical type earthing with minimum 3.0 metre long ( Chemical type ) earth pipe set with back fill
compound, bus for termination, SS bolts, nuts, and washers etc.shall be corossion free, including
excavation, refilling & complete as required, including FRP Coverr and all associated civil works like
construction of RCC chamber and rough plastering etc.

A2 Earthing conductors
The earthing conductors with necessary fixing accessories like GI strip saddles
and hardware. Cost to include all necessary routings, civil works like wall
openings. Erection rate shall be for both indoor and outdoor routing inclusive
of earth excavation work. Copper tapes shall be of 95% purity Commercial
grade, with clamps at regular intervals.The copper earthing tapes
have to be laid with brazed joints, PVC sleeve, Porcelain supports
at regular intervals.
7 25 mm x 3 mm Cu Strip.
3 25mm x 3mm copper Strip. (To be used for SRG earthing, UPS, PDU connections)

5 25 mm x 3mm GI Strip with welded joints


9 1 Run of x 185 Sqmm insulated copper conductor wires
9 1 Run of x 10 Sqmm insulated copper conductor wires
11 1 Run of x 4 Sqmm insulated copper conductor wires
B MISCELLANEOUS ITEM
Fire sealant for all openings Including Danger Sign Boards, Local statutory authorities Approvals for
B1 implementaiton, commissioning and powering ON.Preparation of safety charts, drawings charts,
operational procedures, labels etc in the respective equipments

Terminal Box with MS enclosure and glass door with Copper terminal of 10mm thick, 100mm wide,
B2 and 600mm long

Terminal Box with MS enclosure and glass door with Copper terminal of 10mm thick, 50mm wide, and
B3 300mm long
Temporary power and temporary lighting arrangement during construction time along with
B4 distribution Board Cables as required during project Execution. Vendor has to pay the Eletricity
Charges to Customer / IBM .

Sub Total

Sheet 5 Total

Notes Site- IIISER PUNE , Lumsum Basis


Any additional Cable,Breakers, Fittings Accessories required to complete the Satisfactorily Functioning of Electrical s
The Rate shall be firm through out the project duration
The Rate shall be including Unloading Lifthing Shifting Postitioning at site as per site requirements
Safety precautions including Shoes , Helmets , Safety Belts if any should be taken during the Execution of work at s
The work shall be including Scafolding at site if any
Vendor will prepare all CAD drawings required for site and as per instructions of IBM Project manager
Warranty - 3 Year from the date of acceptance by IBM / CDAC
The Execution of project will be carried out as per IBM Project plan.
Makes to be proposed only as per approved Make List
Acceptance of Vendor SoW
The work shall be including Scafolding at site if any
Description
A Warranty - 3 Year from the date of acceptance by IBM / CDAC
1 Comprehensive AMC for 4th year
2 Comprehensive AMC for 5th year
- CDAC - IISER-Pune
AS PER BOQ ACTUALS
Qty Unit Qty Unit

1 Nos 1 Nos

2 Nos 2 Nos

2 Nos 2 Nos

1600 Rmt 1305 Rmt


125 Rmt 125 Rmt
60 Rmt 60 Rmt
0 Rmt 0 Rmt

0 Rmt 0 Rmt
0 Rmt 0 Rmt
110 Rmt 100 Rmt
115 Rmt 115 Rmt

540 Rmt 526 Rmt


300 Rmt 300 Rmt
100 Rmt 60 Rmt
50 Rmt 50 Rmt
300 Rmt 295 Rmt
180 Rmt 176 Rmt
100 Rmt 99 Rmt

18 Nos 18 Nos
10 Nos 10 Nos
8 Nos 4 Nos
0 No 0 No

0 Nos 0 Nos
0 Nos 0 Nos
8 Nos 8 Nos
10 Nos 12 Nos

56 Nos 64 Nos
32 Nos 32 Nos
10 Nos 4 Nos
34 Nos 28 Nos
24 Nos 34 Nos
24 Nos 12 Nos
200 Rmt 300 Rmt

Ro Rmt Ro Rmt

Ro Rmt Ro Rmt

4 Nos 4 Nos

Nos Nos

3 Nos 3 Nos

3 Nos 3 Nos

Nos Nos

Nos Nos
3 Nos 3 Nos

30 30
70 70

30 30
25 25
50 50
20 20
25 25

Qty Unit Qty Unit

2 No's 2 No's
2 No's 2 No's

2 No's 2 No's

8 No's 8 No's

10 No's 10 No's

12 Nos 12 Nos

3 Nos 3 Nos

4 Nos 4 Nos

4 Nos 4 Nos

2 nos 2 nos
Qty Unit Qty Unit

Ro Nos Ro Nos

Ro Nos Ro Nos

4 Nos 4 Nos

4 Nos 4 Nos
100 Rmt 100 Rmt
50 Rmt 50 Rmt

75 Rmt 75 Rmt
100 Rmt 100 Rmt
40 Rmt 40 Rmt
40 Rmt 40 Rmt

1 Lot 1 Lot

2 nos 2 nos

2 nos 1 nos

1 Lot 1 Lot

4,750 4,472

sfactorily Functioning of Electrical system should be considered with Offer and same is to be considered without any additional cost

site requirements
n during the Execution of work at site

BM Project manager

Qty Unit Qty Unit

1 Lot 1 Lot
1 Lot 1 Lot
out any additional cost