A-POR PESO
MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTAL
CEMENTO BL. 24,523.97 42.50 1,042,268.73
FIERRO, CLAVO, ALAM. ETC KG 8,335.88 1.00 8,335.88
MADERA P2 9,244.21 1.50 13,866.32
YESO BL 1,362.67 1.00 1,362.67
PINTURAS GL 529.19 4.00 2,116.76
ACCESORIOS VARIOS KG 0.00 1.00 0.00
CERAMICOS M2 0.00 6.00 0.00
SANIT, VALV., ACCES. ETC KG 0.00 1.00 0.00
OTROS KG 3,329.43 1.00 3,329.43
B-POR VOLUMEN
EN AGREGADOS
DESCRIPC. UNIDAD AFECTOS IGV SIN IGV
ARENA M3 0.00
PIEDRA M3 0.00
HORMIGON DE RIO M3 0.00
BLOQUETAS CONCRETO UND 0.00 0.00
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 5.00 CAPACIDAD DEL CAMION (UND ) 0.00
COSTO POR VIAJE S/. 500.00 COSTO POR VIAJE S/. 0.00
CAPACIDAD DEL CAMION (KG) 5,000.00 CAPACIDAD DEL CAMION (KG) 0.00
FLETE POR KG 0.100
AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por peso
FLETE POR PESO 107,127.98 FLETE POR VOLUMEN=No viajes*costo por viaje
FLETE POR VOLUMEN
AGREGADOS 0.00
TUBERIA
COSTO TOTAL FLETE TERR. 107,127.98
CONSTRUCTORS S.R.L.
MATERIALES
0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 274.8232
0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 444.0516
0202010005 CLAVOS PARA MADERA C/C 3" kg 526.8567
0202110099 REJILLA C/PERFIL 1 1/4"X1/4"+L 1 1/1/4" m2 113.8620
0202200100 PERNO DE 5/8" CON TUERCA Y HUACHA 5" und 6.0000
0202970008 ACERO CORRUGADO 5/8" kg 3,607.0545
0203020003 ACERO CORRUGADO 0 1/2" kg 2,616.2850
0251990092 REJILLA METALICA m 746.9460