Question 1

Visualising and limiting work in progress helps all of the below except...what?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

lowers cycle times, risk, and


variability of outputs 0

facilitate learning for


optimising solution 1

reduce queue length


0

improve quality
0

This is part of principle #6 – Visualize and limit WIP, reduce batch sizes, and manage queue
lengths

Facilitating learning for optimising solution os part of principle 5.

For more information check:

http://www.scaledagileframework.com/visualize-and-limit-wip-reduce-batch...
Question 2
In SAFe(r) which of the following is not a feature of setting a vision for change

Score: 0 of 1

Your answer Choice Correct? Score Feedback Correct answer

Faster Deployment
0
Your answer Choice Correct? Score Feedback Correct answer

Improved Motivation
0

Clarified Purpose
0

Better Alignment
0

Establishing the vision for change is part of reaching the tipping point.

For more information see:

http://www.scaledagileframework.com/reaching-the-tipping-point/
http://www.scaledagileframework.com/
Question 3
What is being described in the following statement:A foundation of the effective adoption of
Agile principles, frameworks, and practices, combined with technical practices to enhance
quality and design of solutions
Score: 0 of 1

Your
Choice Correct? Score Feedback
answer

Lean-Agile Leaders drive and sustain organizational


It is a change and operational excellence by empowering
description individuals and teams to reach their highest potential.
of Lean- They do this by learning, exhibiting, teaching, and
0
Agile coaching SAFe’s Lean-Agile mindset, values,
leadership principles, and
practices.https://www.scaledagileframework.com/lean-
agile-leadership/

It is a
description
of Business
Solutions
0
and Lean
Systems
Engineering
Your
Choice Correct? Score Feedback
answer

It is a
description
of Lean
0
Portfolio
Management

It is a
description
of DevOps
0
and Release
on Demand

It is a
description
of Team and
0
Technical
Agility

Question 4
The release train engineer has gotten a job at Google. There are three leading candidates to
replace her. What is the best way to appoint her replacement?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

A decision should be made centrally


1

The decision should be decentralised


to the teams to decide 0

This is part of principle 9 – Decentralize decision-making.


The decision is 'infrequent' (we hope) and 'long-lasting' (we hope) and therefore it fulfills two out
of three criteria for a decision to be made centrally?

Can you remember the 3rd criteria?

For more information read:

http://www.scaledagileframework.com/decentralize-decision-making/
Question 5
In SAFe(r) what two things can independently cause organisations to reach a tipping point

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Organic change and burning


platform 0

Vendor partners and organic


change 0

Burning platform and proactive


leadership 1

Industry trends and vendor


partners 0

Proactive leadership and vendor


partners 0

For more information see:

http://www.scaledagileframework.com/reaching-the-tipping-point/
http://www.scaledagileframework.com/
Question 6
Provide Time and Spce for Creativity is part of which pillar of the House of Lean?

Score: 1 of 1
Your answer Choice Correct? Score Feedback Correct answer

Quality
0

Respect for people and culture


0

Leadership
0

Innovation
1

Flow
0

Relentless Improvement
0

The concepts are part of the House of Lean pillar of INNOVATION

http://www.scaledagileframework.com/lean-agile-mindset/
Pillar 3 - Innovation

Question 7
Three of the below relate to Cadence, which are they?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

It makes waiting times for new work


predictable 1

It lowers the transaction costs of key


events 1
Your Correct
Choice Correct? Score Feedback
answer answer

It enables more efficient use of


people and resources 1

it aligns development teams and


business to a common vision 0

This is part of principle #7 – Apply cadence, synchronize with cross-domain planning.

The incorrect answer is also this principle, but part of synchronisation, not cadence

For more information read:

http://www.scaledagileframework.com/apply-cadence-synchronize-with-cross-domain-planning/
Question 8
What is the primary activity of the SAFe® Product Owner/Product Manager (POPM)?(Choose
BEST answer)

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

To plan and This is part of the key areas of


successfully execute competency for a SAFe Agilist
Program Increments 0 (Leading Safe Certification), not
(PIs) POPM

To work with This is the BEST answer, based on


customers and information in the SAFe® exam
development guide, which outlines the key
organizations to competencies as:• Apply Lean-
1
identify, write and Agile Mindset and SAFe
prioritize principles and practices• Identify
requirements Customer needs• Write Epics,
Capabilities, Features, and Stories•
Your Correct
Choice Correct? Score Feedback
answer answer

Prioritize work to deliver value to


the Enterprise

To conduct activities
to ensure Lean-agile
Minset and SAFE
This definition is more like a
principles and
coaching role than the role of the
pactices are being 0
POPM
followed in the
development
organization

To direct the
activities of the agile in SAFe® , as in agile generally,
scrum team towards teams are self-organizing in how
sucessful delivery of 0 they do their work, they are not
the team and directed, as such.
program increment

For more information on the POPM role consult :

 https://www.scaledagileframework.com/product-owner/
 https://www.scaledagileframework.com/product-and-solution-management/
 The Exam Guide for POPM
You will need to be familiar with both roles to answer questions in the exam

Question 9
Lead the change, is part of which element of the House of Lean?

Score: 1 of 1

Your answer Choice Correct? Score Feedback Correct answer

Quality
0
Your answer Choice Correct? Score Feedback Correct answer

Flow
0

Leadership
1

Value
0

Respect for people and culture


0

Governance
0

Relentless Improvement
0

Innovation
0

The concepts are part of the House of Lean foundation of Leadership

http://www.scaledagileframework.com/lean-agile-mindset/
Foundation - Leadership

Question 10
The notion that improvement comes through synchronisation of design loops and shorter
learning cycles is part of which lean-agile principle?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

#1 Take an economic view


0
Your Correct
Choice Correct? Score Feedback
answer answer

#2 Apply systems thinking


0

#5 base milestones on objective


valuation of working systems 0

#6 Visualise and limit WIP, reduce


batch sizes and manage queue lengths 0

#9 Decentralise Decision Making


0

#8 Unlock the intrinsic motivation of


knowledge workers 0

#7 Apply Cadence and synchronise


with cross domain planning 0

#3 Assume variability, preserve


options 0

#4 Build incrementally with fast,


integrated learning cycles 1

For more information on SAFe Lean-Agile principles go to the links below:

http://www.scaledagileframework.com/safe-lean-agile-principles/
http://www.scaledagileframework.com/build-incrementally-with-fast-integrated-learning-cycles/
Question 11
Match the following characteristics to the role

Score: 3 of 3
Your Correct
Choice Correct? Score Feedback
answer answer

Product Is Co-located with Product


1
Manager marketing/business Manager

Product Product
Is Co-located with agile teams 1
Owner Owner

Coordinates Dependencies and


Agile team 1 Agile team
fosters collaboration
Question 12
Who approves epics, using what as an input?

Score: 0 of 1

Your
Choice Correct? Score Feedback
answer

The Lean
Portfolio
Management
team, using
decomposed These elemetns are defined after approval, not before
0
solution/program
Epics,
capabilities and
features

The Epic Owner, The Epic Hypothesis is just the starting point, and the
using the Epic Epic Owner alone cannot approve it for
Hypothesis 0 implementation (although they may be part of the LPM
Statement team)

The Lean
Portfolio
Defined in the POPM courseware and at this
Management
0 link: https://www.scaledagileframework.com/portfolio
team, using the
backlog/
Lean Business
Case and
Your
Choice Correct? Score Feedback
answer

associated
artefacts

Question 13
The notion that systems demos improve solutions is part of which lean-agile principle?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

#7 Apply Cadence and synchronise


with cross domain planning 0

#9 Decentralise Decision Making


0

#2 Apply systems thinking


0

#4 Build incrementally with fast,


integrated learning cycles 0

#8 Unlock the intrinsic motivation of


knowledge workers 0

#6 Visualise and limit WIP, reduce


batch sizes and manage queue lengths 0

#5 base milestones on objective


valuation of working systems 1
Your Correct
Choice Correct? Score Feedback
answer answer

#1 Take an economic view


0

#3 Assume variability, preserve


options 0

For more information on SAFe Lean-Agile principles go to the links below:

http://www.scaledagileframework.com/safe-lean-agile-principles/
http://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-
systems/
Question 14
Select the elements of an agile team in SAFe

Score: 0 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

self-managing
0

Empowered
1

Self-organising
1

Delivers valuable tested software


every 2 to 4 weeks. -1

uses the best of scrum, XP and


Kanban 1

in general agile teams can deleiver anywhere between 1-4 weeks and 2 weeks is common.

But for SAFe the period is fixed at 2 weeks because, in SAFe, multiple agile teams must
coordinate and align together, so it is important to have the same cadence.
This page has more information http://www.scaledagileframework.com/scrumxp/
Question 15
Match the following characteristics to the role

Score: 3 of 5

Correct
Your answer Choice Correct? Score Feedback
answer

Release Train Chief Scrum Master for the Release Train


1
Engineer Train Engineer

owns, defines and


Product
Business Owners prioritizes the Program 0
Management
Backlog

Provide guidance and


System Architect- System Architect-
technical enablement for 1
Engineering Engineering
the Train

Provides process and tools


Systems Team to integrate assets early and 1 Systems Team
often

Product Key stakeholders on the


0 Business Owners
Management ART
Question 16
Pivot without Mercy or Guilt is part of which pillar of the House of Lean?

Score: 1 of 1

Your answer Choice Correct? Score Feedback Correct answer

Leadership
0

Relentless Improvement
0
Your answer Choice Correct? Score Feedback Correct answer

Flow
0

Innovation
1

Respect for people and culture


0

Quality
0

The concepts are part of the House of Lean pillar of INNOVATION

http://www.scaledagileframework.com/lean-agile-mindset/
Pillar 3 - Innovation

Question 17
You have built your first deliverable from your Epic and are now assessing the value of adding
additional features or not.What step are in in, of what process?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

You are in the Measure progress against


Strategic Themes step of
0
Strategic Management

You are in the evaulate MVP step of the


Lean Startup Cycle 1

You are in the Participatory Budgeting


process of Lean Budgeting 0

You are in the evaulate MVP step of the Lean Startup


Cyclehttps://www.scaledagileframework.com/epic/
Question 18
Little's law refers to

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

The quality of outputs related to the


queue length 0

The relationship between wait times,


queue lengths and processing rates
1

The variability of outputs related to the


queue length 0

The probability of an error occuring,


and the timeboxed period it is likely to
0
occur within

This is part of principle #6 – Visualize and limit WIP, reduce batch sizes, and manage queue
lengths

For more information check:

http://itsadeliverything.com/littles-law-the-basis-of-lean-and-kanban
https://en.wikipedia.org/wiki/Little%27s_law
Question 19
When planning for a team refinement meeting, Allie from operations has agreed to attend
provided she can bring her laptop to monitor critical systems during the event.

This contravenes a company policy that electronic devices should be left outside meetings or put
on silent. Allie is not the only person that wants to bring devices into meetings.

Where are decisions on cases like Allie's request best made?

Score: 0 of 1
Your Correct
Choice Correct? Score Feedback
answer answer

The decision should be decentralised


to the teams to decide 0

A decision should be made centrally


0

This is part of principle 9 – Decentralize decision-making.

The decision 'requires local information’ in that teams differ in their dynamics. It is also likely
to be something encountered 'frequently and commonly' because others want to do it.

This are two of the criteria for decentralised decision making.

Can you remember the other criteria?

For more information read:

http://www.scaledagileframework.com/decentralize-decision-making/
Question 20
What is:

 submitted by the Epic owner,


 based on the Lean Business Case,
 at the end of 'Analysing', and
 is enacted by the Lean Portfolio Management

Score: 0 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

The Minimum Viable product


(MVP) 0
Your Correct
Choice Correct? Score Feedback
answer answer

Weighted Shortest Job First


(WSJF) 0

The Epic Hypothesis Statement


0

Solution Alternatives
0

Lean Business Case


0

The Go/No-Go decision


0

Submitting the Lean Business Case to Lean Portfolio Management (LPM) is one of the
responsibilities of the Epci Ownerhttps://www.scaledagileframework.com/epic-owner/
Question 21
Three of the below relate to Cadence, which are they?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

It converts unpredictable events into


expected events
1

It provides scheduled integration


points 1

It provides multiple feedback


perspectives 0
Your Correct
Choice Correct? Score Feedback
answer answer

It supports regular planning and cross


functional coordination 1

This is part of principle #7 – Apply cadence, synchronize with cross-domain planning.

The wrong answer is part of this principle but is part of synchronisation, not cadence.

For more information read:

http://www.scaledagileframework.com/apply-cadence-synchronize-with-cross-domain-planning/
Question 22
What is the benefit of successive iterations with objective milestones?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

It provides inspection and adaption


opportunities allowing for continuous
adjustments of the solution towards an 1
optimal result

It provides for gates where the project


can be assessed against criteria for
0
persist, pivot or perish (The three Ps)

It allows governance to determine risk


profiles at specific intervals
0
Your Correct
Choice Correct? Score Feedback
answer answer

It allows for phase-gates at iteration


points 0

This is part of principle #5base milestones on objective evaluation of working systems.

See:

http://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-
systems/

Question 23
Optimise the Whole is part of which pillar of the House of Lean?

Score: 0 of 1

Your answer Choice Correct? Score Feedback Correct answer

Quality
0

Respect for people and culture


0

Flow
0

Innovation
0

Relentless Improvement
0

Leadership
0

The concepts are part of the House of Lean pillar of Relentless Improvement

http://www.scaledagileframework.com/lean-agile-mindset/
Pillar 4 – Relentless Improvement
Question 24
In the context of the ART and the core compentency of DevOps and release on demand, what are
three influencers?(Choose three)

Score: 0 of 1

Your answer Choice Correct? Score Feedback Correct answer

UX
1

The DevOps Institute


0

Automated Testing Tools


-1

Vision
0

Architecture
0

Automated Deployment Tools


-1

Per the SAFe(r) tarining course material ARTs in a DevOps and Release on Deman context
operate with guidance from Vision, Architecture, and UX

Question 25
What is being described in the following statement:It is the prerequisite, driver and support for
effective organizational change and operational excellence
Score: 1 of 1

Your
Choice Correct? Score Feedback
answer

Lean-Agile Leaders drive and sustain organizational


It is a
change and operational excellence by empowering
description 1
individuals and teams to reach their highest potential.
of Lean-
They do this by learning, exhibiting, teaching, and
Your
Choice Correct? Score Feedback
answer

Agile coaching SAFe’s Lean-Agile mindset, values,


leadership principles, and
practices.https://www.scaledagileframework.com/lean-
agile-leadership/

It is a
description
of Team and
0
Technical
Agility

It is a
description
of Business
Solutions
0
and Lean
Systems
Engineering

It is a
description
of Lean
0
Portfolio
Management

It is a
description
of DevOps
0
and Release
on Demand

Question 26
Some teams are lobbying for the relaxation of the 'everyone must stand' rule for daily scrum
meetings, arguing that so long as events still take 15 minutes and 'the three questions' are
covered, then sitting should be permitted.

What's the best approach to take for making this decision?

Score: 1 of 1
Your Correct
Choice Correct? Score Feedback
answer answer

The decision should be decentralised


to the teams to decide 1

A decision should be made centrally


0

This is part of principle 9 – Decentralize decision-making.

The decision 'requires local information’ in that teams differ in their dynamics. This is one of
the criteria for decentralised decision making.

Can you remember the other two criteria?

For more information read:

http://www.scaledagileframework.com/decentralize-decision-making/
Question 27
Match the SAFE(r) Portfolio level elements below

Score: 3 of 5

Your answer Choice Correct? Score Feedback Correct answer

Organised
The Flow of Value 1 The Flow of Value
around?

Governance and Lean Budgets


0 Decision Makers
Improvement empower?

Portfolio visibility and Kanban System Portfolio visibility and


1
WIP limits Provides? WIP limits

Larger Technology Enterprise Larger Technology


1
Decisions Architect guides? Decisions
Your answer Choice Correct? Score Feedback Correct answer

Objective Metrics Governance and


The Flow of Value 0
support? Improvement
Question 28
Decentralise Decision making, is part of which element of the House of Lean?

Score: 1 of 1

Your answer Choice Correct? Score Feedback Correct answer

Leadership
1

Relentless Improvement
0

Flow
0

Governance
0

Quality
0

Innovation
0

Value
0

Respect for people and culture


0

The concepts are part of the House of Lean foundation of Leadership

http://www.scaledagileframework.com/lean-agile-mindset/
Foundation - Leadership

Question 29
The following item relates to principle #5 - base milestones on objective evaulations of working
systems

Fill in the blanks

_____________ fix requirements and design _______ making adjustments _______ when
____________

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Waterfall projects | under change


management | in a controlled way |
0
needed and approved

Phase Gates | too early | costly | new


facts emerge
1

Agile projects | as early as possible | as


desired by the customer | they think
0
of changes

For more information on SAFe Lean-Agile principles go to the links below:

http://www.scaledagileframework.com/safe-lean-agile-principles/
http://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-
systems/
Question 30
One of the biggest challenges that is faced by organizations is to implement the move away from
project based funding, towards lean-agile budgeting.Which role has the most accountability in
making this happen?(Choose best answer)

Score: 1 of 1
Your C
Choice Correct? Score Feedback
answer a

It is part of
the role of the
EPIC owner
0
to ensure this
is in place

In Essential
and/or
Portfolio
SAFE(r) it is
the
responsibility
of the RTE, 0
and in large
solution
solution it is
that of the
STE

It is the
accountability
of the Product
0
Management
Group

This is part of
It is not an activity that is formally assigned to any
the
one role, but in terms of the stakeholders that
accountability
have the most accountability, it is Lean Portfolio
of Lean 1
ManagementThisis the best answer out of the
Portfolio
options.https://www.scaledagileframework.com/lean-
Management
portfolio-management/

Question 31
Match the following characteristics to the role

Score: 3 of 3
Your Correct
Choice Correct? Score Feedback
answer answer

Owns the Vision and road maps, the


Product Product
program backlog and all related pricing, 1
Manager Manager
licensing and return on investment

Contributes to the Vision and Program


Product Product
backlog; Owns the team backlog and 1
Owner Owner
implementation

Evolves the Continuous Delivery


Agile team 1 Agile team
Pipeline
Question 32
Develop People, is part of which element of the House of Lean?

Score: 0 of 1

Your answer Choice Correct? Score Feedback Correct answer

Innovation
0

Value
0

Flow
0

Governance
0

Quality
0

Respect for people and culture


0
Your answer Choice Correct? Score Feedback Correct answer

Leadership
0

Relentless Improvement
0

The concepts are part of the House of Lean foundation of Leadership

http://www.scaledagileframework.com/lean-agile-mindset/
Foundation - Leadership

Question 33
We have defined the Development Value Streams

What is the next step in the process?

Score: 0 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Identify the ARTs


0

Define the Development Value


Streams 0

Identify the people that develop the


systems 0

If necessary, split ARTs in large value


streams into multiple ARTs 0

Identify the systems that support the


operational values streams 0
Your Correct
Choice Correct? Score Feedback
answer answer

Identify the operational value streams


0

Identify Development Streams Cross


Boundaries effects 0

Read more at: http://www.scaledagileframework.com/identify-value-streams-and-arts/


Question 34
The four pillars of the House of Lean are:

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Respect for people and


culture, Leadership, Value,
0
Relentless improvement

Respect for people and


culture, Value, Innovation,
0
Relentless improvement

Respect for people and


culture, Quality,
Innovation, Relentless 0
improvement

Correct these are the


Respect for people and
pillars, leadership forms
culture, Flow, Innovation,
1 the base and Value forms
Relentless improvement
the roof.
Your Correct
Choice Correct? Score Feedback
answer answer

Respect for people and


culture, Flow, Leadership,
0
Relentless improvement

Question 35
The Epic owner is responsible for defining the Epic, it's MVP and Lean Business Case and
getting it approved; after that they hand over to the Business Owner for implementaiton, with no
further responsibilities.

Score: 1 of 1

Your answer Choice Correct? Score Feedback Correct answer

True 0

False 1

It is correct that the Epic Owner is responsible for driving the Epic through to the Go/no-go
decision point (approval). But their responsibilities do not end there. After the Epic has been
accepted for implementation the Epic Owner must collaborate with Agile teams to shepherd the
development and realize the benefits. Depending on the situation the Epic Owner may stay
engaged on an ongoing basis.https://www.scaledagileframework.com/epic-owner/
Question 36
What is the IP iteration

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Internal Process iteration


0
Your Correct
Choice Correct? Score Feedback
answer answer

Intellectual Property iteration


0

Innovation and Planning


iteration 1

Read more at: http://www.scaledagileframework.com/guidance-six-safe-practices-for-s-sized-


teams/

Question 37
Match the following governance characteristics to the role

Score: 3 of 3

Your Correct
Choice Correct? Score Feedback
answer answer

Product Product
Collaborates on Enablers 1
Manager Manager

Product Includes Re-factors and re-


1 Product Owner
Owner designs in backlog

Agile teams Integrates with other teams 1 Agile teams


Question 38
The following are all aspects of creating what deliverable?

 Do just the right amount of analysis


 Avoid being overly specific
 Define the outcomes hypotheses
 Understand the implementation impact
 Develop an incremental implementation strategy
 Gain approval
Score: 1 of 1
Your answer Choice Correct? Score Feedback Correct answer

The Enabler Epic


0

The Feature Epic


0

The Lean Business Case


1

The Epic Hypothesis


0

The Architectural Runway


0

These are all part of Creating the Lean Business Case.Remember - it is the Lean Business Case
that is approved, not the Epic Hypothesis statement which precedes
it.https://www.scaledagileframework.com/epic/
Question 39
The outcome hypothesis, leading indicators, and Non-Functional requiremetns are first
documented where, and by whom?

Score: 0 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

In the Epic Hypothesis Statement by


the Epic Owner 0

In the Lean Business Case by the


Enterprise Architect 0

In the Progam Increment Objectives


by the Business Owner 0

The Epic Owner first defines this information in the Epic Hypothesis statement.When
creating enabler epics itis possible that the Enterprise Architect might create the Epci
Hypothesis statement, but when doing so they are acting the role of an Epic owner.(The Epic
Owner in SAFe is a role assumed by an individual; it is not a job title)More info at these links:
 https://www.scaledagileframework.com/epic/
 https://www.scaledagileframework.com/epic-owner/
 https://www.scaledagileframework.com/enterprise-architect/
 https://www.scaledagileframework.com/business-owners/

Question 40
The concept that a 'system must be managed, it will not manage itself' is part of which lean-agile
principle?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

#9 Decentralise Decision Making


0

#5 base milestones on objective


valuation of working systems 0

#3 Assume variability, preserve


options 0

#1 Take an economic view


0

#4 Build incrementally with fast,


integrated learning cycles 0

#8 Unlock the intrinsic motivation of


knowledge workers 0
Your Correct
Choice Correct? Score Feedback
answer answer

#6 Visualise and limit WIP, reduce


batch sizes and manage queue lengths 0

#2 Apply systems thinking


1

#7 Apply Cadence and synchronise


with cross domain planning 0

For more information on SAFe Lean-Agile principles go to the link below:

http://www.scaledagileframework.com/safe-lean-agile-principles/
Question 41
What order should the following things be done in?

Score: 0 of 5

Your Correct
Choice Correct? Score Feedback
answer answer

Identify the Operational Value


2 0 1
Stream(s)

Identify the systems that support the


4 0 2
value stream(s)

Identify the people that support the


5 0 3
systems

Define the Development Value


1 0 4
Stream(s)

Understand how Development Value


3 0 5
Streams go across boundaries
Read more at: http://www.scaledagileframework.com/identify-value-streams-and-arts/
Question 42
Match the ways in which an organisation can move from a Traditional approach towards Lean-
Agile
Score: 0 of 5

Your
Choice Correct? Score Feedback
answer

Decentralized,
Centralized https://www.scaledagileframework.com/decentralize-
Rolling Wave 0
Control decision-making/
planning

Lightweight,
Project https://www.scaledagileframework.com/government-
Epic-only, 0
Overload transitioning-from-projects-to-a-lean-flow-of-epics/
business cases

lean agile
budgeting and Detailed
self-managing Project 0 https://www.scaledagileframework.com/epic/
agile release Plans
trains

Demand
Centralized
management; https://www.scaledagileframework.com/pi-
Annual 0
continuous objectives/
Planning
Value Flow

Project
Lightweight,
based https://www.scaledagileframework.com/original-
Epic-only, 0
funding whitepaper-lean-agile-financial-planning-with-safe/
business cases
and control

Question 43
What Core Competency is described by the following?

 Uses Scrum and Kanban


 Applies Built-in Quality Practices
 Delivers value

Score: 1 of 1
Your Correct
Choice Correct? Score Feedback
answer answer

Business Solutions and Lean


Systems 0

Team and Technical Agility


1

DevOps and Release on Demand


0

Lean-Agile Leadership
0

Lean Portfolio Management


0

https://www.scaledagileframework.com/team-and-technical-agility/
Question 44
Improving learning efficiency by decreasing time between action and effect is part of which
lean-agile principle?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

#5 base milestones on objective


valuation of working systems 0

#3 Assume variability, preserve


options 0

#2 Apply systems thinking


0
Your Correct
Choice Correct? Score Feedback
answer answer

#1 Take an economic view


0

#6 Visualise and limit WIP, reduce


batch sizes and manage queue lengths 0

#8 Unlock the intrinsic motivation of


knowledge workers 0

#7 Apply Cadence and synchronise


with cross domain planning 0

#9 Decentralise Decision Making


0

#4 Build incrementally with fast,


integrated learning cycles 1

For more information on SAFe Lean-Agile principles go to the links below:

http://www.scaledagileframework.com/safe-lean-agile-principles/
http://www.scaledagileframework.com/build-incrementally-with-fast-integrated-learning-cycles/
Question 45
Identify the Five Core Competencies first introducted in SAFe(r) 4.6

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Business Solutions and Lean


Systems Engineering 1
Your Correct
Choice Correct? Score Feedback
answer answer

Take an Economic View


0

DevOps and Release on Demand


1

Lean Portfolio Management


1

Lean-Agile Leadership
1

Unlock the Intrinsic Motivation of


Knowledge Workers 0

Team and Technical Agility


1

Assume Variability, Preserve


Options 0

The incorrect options are all part of SAFe Principles, but they are not a defined core competency

Question 46
What is the core benefit of the Principle #4 – Build incrementally with fast, integrated learning
cycles?

Score: 1 of 1

Your
Choice Correct? Score Feedback
answer

It enables better
design by
keeping design 0
options open for
as long as
Your
Choice Correct? Score Feedback
answer

possible, and
only
converging when
it is timely and
appropriate to do
so, ato produce
better technical
and economic
outcomes.

It provides better
focus for
multiple
solutions and
allows teams to
concentrate and 0
focus on the
variable
elements of
work

It enables the
shortest
sustainable lead
time, by
0
eliminating
impediments to
the flow of work

It gives a better
picture of actual
progress, by
being focused on
building the
0
system in
increments, with
evidence at each
increment point
of objective
Your
Choice Correct? Score Feedback
answer

and data based


measurement
towards
achieving the
outcome

It improves
solution
development by
enhancing the
understanding of
the system and
the environment
and applying
0
that
understanding to
design,
develpment,
deployment, and
maintenance of
the system itself

It ensures the
right work gets
done, and the
wrong work
doesn't; by
informing and
0
driving decisions
at all levels to
best identify the
value of work
being done

Enchances
innovation,
velocity and 0
improves
outcomes by
Your
Choice Correct? Score Feedback
answer

making
decisions at the
appropriate level
and context

It enables risk to
be evaluated This is a benefit of Principle #4 – Build
early, through incrementally with fast, integrated learning
1
early validation cycleshttps://www.scaledagileframework.com/build-
and feedback. incrementally-with-fast-integ...

It unlocks
quality and
productivity
through 0
autonomy within
boundaries

Question 47
Three of the below relate to Synchronization, which are they?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

It allows for the more efficient use of


people and resources 0

It faciliates cross-functional tradeoffs


1

It allows multiple events to occur at


the same time 1
Your Correct
Choice Correct? Score Feedback
answer answer

It provides routine dependency


management 1

This is part of principle #7 – Apply cadence, synchronize with cross-domain planning.

The incorrect answer is also this principle, but part of cadence, not synchronisation

For more information read:

http://www.scaledagileframework.com/apply-cadence-synchronize-with-cross-domain-planning/
Question 48
Match the following concepts from the SAFe® Implementation Roadmap series

Score: 0.6 of 1

Your answer Choice Correct? Score Feedback Correct answer

provides the foundation needed to successfully


Strong
upon which everything 0 implement change in an
Leadership
else stands organisation

needed to successfully provides the foundation


implement change in an Thinking Lean 0 upon which everything
organisation else stands

is built entirely on the is built entirely on the


skills, capabilities and The basis of skills, capabilities and
1
aptitude of Agile teams SAFe® aptitude of Agile teams
and their leaders and their leaders

When words
creates the opposite of creates the opposite of
and action 1
the intended effect the intended effect
don't match

Match to blank
Match to blank - bug in Match to blank - bug in
- bug in 1
question question
question
Read more at: http://www.scaledagileframework.com/train-executives-managers-and-leaders/
Question 49
Change requires effort, focus, courage and commitment. Match the reasons and the effects
below

Score: 5 of 5

Correct
Your answer Choice Correct? Score Feedback
answer

This is often a
problem with senior
people that are
We have been We have been
unwilling to admit to
doing agile for doing agile for
a lack of knowledge
many years many years
Too much with a new area. it
now, and so this 1 now, and so this
complacency interferes with the
new change will new change will
acquisition of new
be no problem be no problem
skills and can slow
for us for us
down the process for
everyone if egos
come into play.

The CIO was The CIO was


Commitment has to
not able to not able to
Powerful guiding come from the top.
attend today but 1 attend today but
coalition absent per Deming 'Change
has sent a has sent a
cannot be delegated'
delegate delegate

Now that we Now that we


have three have three
Declaring victory too
ARTs running ARTs running
soon can lead to a
we can Declaring victory we can
1 fall-off in support if
confidently too soon confidently
results do not flow as
expect an expect an
fast as expected
improvement in improvement in
results results

PI Planning if the vision is not PI Planning


management clear, prioritization management
review issue will be more difficult review issue
Vision
'Teams do not 1 because there will be 'Teams do not
undercommunicated
agree on priority disagreement on agree on priority
of top three what constitutes of top three
features" value features"
Correct
Your answer Choice Correct? Score Feedback
answer

Everyone is subject
Can we wait for Can we wait for
to the agreed rules
10 minutes 10 minutes
and operating
please before Neglecting to anchor please before
1 procedures of the
we start as the change in culture we start as the
ART. Rank does not
CIO is running CIO is running
allow people to make
late late
others wait
Question 50
What are the relationships in respect of bringing Epics to the Go/no-go point?

Score: 1 of 1

Your Correct
Choice Correct? Score Feedback
answer answer

Your Correct
Choice Correct? Score Feedback
answer answer

The PO/PM drives the activity and the


Epic owners are key stakeholders 0

The Epic owner drives the activity and


the PO/PM are key stakeholders 1

The Epic Owner is responsible for driving the epics from identification through to the go/no-go
decision point.https://www.scaledagileframework.com/epic-owner/

S-ar putea să vă placă și