RISK ASSESSMENT AND METHOD STATEMENT

( RAMS )

Project: IMERYS, Vizag Plant, India Company/Contractor : sparkline equipments Date:05-11-2019


Pvt ltd
Exact Work location :
Document number :01
Project : IMERYS Aluminate Technologies
Vizag Plant, India

Risk Assessment Title: EOT crane materials unloading at storage area

Step-1 Identify the activity

Describe the Sequence of activities: EOT crane materials and wooden boxes have to unloading in storage area
RISK ASSESSMENT AND METHOD STATEMENT
( RAMS )

Step 2: Identify who may be at risk by the activity


Activity Hazard Harm or Damage Residual Risk Risk controls measures
Step 3 Step 4 Step 5 Rating (Apply the hierarchy of risk controls)
C L R
Step 6

To lift the girder from 1) Hand injury 1) Materials may hit 1) Cut resistant hand gloves to be used while working.
trailer, locate farana’s 2) Eye injury to nearby some 2) Safety goggles to be worn while working in unloading area.
Make rigging 3) Head injury other materials or 3) Safety helmet to be worn with strap below face chin.
arrangement by web 4) Slippery pathways buildings. 4) Slippery pathways to be cleared from oil and unwanted objects.
sling by making choke 5) Using mobile phone 2)less capacity web 5) Using of mobile in unloading area should be avoided.
sling can get cut
hitch at center points. while working 6) Job should not be carried out in the event of rain or wet condition.
6) Defective 7) All lifting belts should be certified by TPI.
equipments

Take the materials 1) Hand injury 1) Materials may hit 1) Cut resistant hand gloves to be used while working.
from vehicle and 2) Eye injury to nearby some 2) Safety goggles to be worn while working unloading area.
unload the material on 3) Head injury other materials or 3) Safety helmet to be worn with strap below face chin.
the wooden battens in 4) Slippery pathways buildings. 4) Slippery pathways to be cleared from oil and unwanted objects.
storage area 5) Using mobile phone 2)less capacity web 5) Using of mobile storage unloading area should be avoided.
sling can get cut
while working 6) Job should not be carried out in the event of rain or wet condition.
6) Defective 7) All lifting belts should be certified by TPI.
equipments 8) Work should not be carried out in presence of rain or bad weather
RISK ASSESSMENT AND METHOD STATEMENT
( RAMS )

Residual Risk
Risk controls measures
Rating
Activity (Apply the hierarchy of risk controls)
Hazard Harm or Damage C L R
Step 3 Step 6
Step 4 Step 5
Lift the wooden box 1) Hand injury 1) Materials may hit 1) Cut resistant hand gloves to be used while working.
and loose items from 2) Eye injury to nearby some 2) Safety goggles to be worn while working in unloading area.
the trailer and unload 3) Head injury other materials or 3) Safety helmet to be worn with strap below face chin.
the wooden box in 4) Slippery pathways buildings. 4) Slippery pathways to be cleared from oil and unwanted objects.
storage yard 5) Using mobile phone 2)less capacity web 5) Using of mobile inside working area should be avoided.
sling can get cut
while working 6) Job should not be carried out in the event of rain or wet condition.
6) Defective 7) All lifting belts should be certified by TPI.
equipments 8) Work should not be carried out in presence of rain or bad weather
RISK ASSESSMENT AND METHOD STATEMENT
( RAMS )

Consequence (Circle) Average Risk


 Rating
Likelihood (circle) 3


Documentation and Supervisor Approval


Prepared by Reviewed by Approved by
Name

Signature

Date