Sunteți pe pagina 1din 7

eProcurement System for Organisations under MoD

Created By: Raja Mahendra Reddy Gatla


Created Date/Time: 01-Jan-2019 12:34 PM
Tender Title: REPAIRS AND MAINTENANCE TO HT INSTALLATIONS AND CONNECTED ITEMS AT INS PARUNDU RAMNAD UNDER
GE TIRUNELVELI
Tender ID: 2018_MES_226403_1

Tender Inviting Authority: GARRISON ENGINEER TIRUNELVELI


Name of Work: REPAIRS / MAINTENANCE TO HT INSTALLATIONS AND CONNECTED ITEMSAT INS PARUNDU, RAMNAD UNDER GE TIRUNELVELI 8
Contract No: GE/TVL/ OF 2017-2018 SER PAGE NO.
SCHEDULE OF WORK / ITEM(S)
Sl.No Description of Work / Item(s) No.of Qty Units Estimated M/s.Rejoy
Rate Constructions

Rate Amount
1.00 SCHEDULE 'A' PART -I (REPAIR /MAINTENANCE TO
EXTERNAL ELECTRIFICATION)
2.00 De-hydration/ filtration of transformer oil by employing on 3236.00 Litres 25.00 80900.00
line filtration plant to achieve di-electric strength not less
3.00 Material and Labour for transformer oil for top up in 350.00 Litres 175.00 61250.00
transformer.
4.00 Disconnecting HT/LT connection of transformer, 11000/433 1.00 Each Job 13500.00 13500.00
V, 3 Phase, 4 wire system and opening up the top cover of
5.00 All as per item No 4 herein before but capacity of 250 KVA. 1.00 Each Job 12250.00 12250.00
6.00 All as per item No 4 herein before but capacity of 200 KVA. 1.00 Each Job 8500.00 8500.00
7.00 All as per item No 4 herein before but capacity of 100 KVA. 3.00 Each Job 8250.00 24750.00
8.00 Disconnecting Primary/Secondary connection of 1.00 Each Job 8500.00 8500.00
transformer, 433 V/230 V, 3 Phase, 4 wire system and
9.00 Disconnecting Primary/Secondary connection of 1.00 Each Job 14800.00 14800.00
transformer, 22000/11000 V, 3 Phase system and opening
10.00 Material and Labour for Replacement of HT bushing of 2.00 Each Job 3000.00 6000.00
transformer 11/0.433 KV of capacity 400 KVA complete all
11.00 All as per item No 10 herein before but capacity of 250 2.00 Each Job 2800.00 5600.00
KVA.
12.00 All as per item No 10 herein before but capacity of 200 2.00 Each Job 2600.00 5200.00
KVA.
13.00 All as per item No 10 herein before but capacity of 100 3.00 Each Job 2500.00 7500.00
KVA.
14.00 Material and Labour Replacement of LT bushing of 2.00 Each Job 4200.00 8400.00
transformer 11/0.433 KV of capacity 400 KVA complete all
15.00 All as per item No 14 herein before but capacity of 250 2.00 Each Job 3800.00 7600.00
KVA.
16.00 All as per item No 14 herein before but capacity of 200 2.00 Each Job 3400.00 6800.00
KVA.
17.00 All as per item No 14 herein before but capacity of 100 2.00 Each Job 2800.00 5600.00
KVA.
18.00 Material and Labour for Replacement of HT bushing of 3.00 Each Job 5000.00 15000.00
transformer 22 / 11 KV of capacity 400 KVA complete all as
19.00 Material and Labour for Replacement of LT bushing of 3.00 Each Job 6500.00 19500.00
transformer 22 / 11 KV of capacity 400 KVA complete all as
20.00 Material and Labour for Replacement of silica gel breather 2.00 Each Job 2500.00 5000.00
of 22/11 KV Out door type transformer capacity 400 KVA
21.00 Material and Labour for Replacement of silica gel breather 1.00 Each Job 2250.00 2250.00
of 11000/433 V transformer of capacity 400 KVA complete
22.00 All as per item No 21 herein before but capacity of 100 to 6.00 Each Job 2000.00 12000.00
250 KVA.
23.00 Material and Labour for Replacement of silica gel breather 1.00 Each Job 1500.00 1500.00
of 433/230 V transformer of capacity 50 KVA complete all
24.00 Material and Labour for Replacement of silica gel standard 10.00 Kilogram 500.00 5000.00
type complete all as specified and directed.
25.00 Supply and fixing in repairs Dial type Temperature gauge 0 9.00 Each 3000.00 27000.00
to 100 C range complete with suitable to any make type
26.00 Supply and fixing Gun metal gate valve of 25 mm dia, ISI 4.00 Each 1450.00 5800.00
Marked suitable for oil inlet/outlet valves of transformer
27.00 Supply and fixing Gun metal gate valve of 40 mm dia, ISI 2.00 Each 2750.00 5500.00
Marked suitable for oil inlet/outlet valves of transformer
28.00 Taking down the defective unserviceable transformer, step 1.00 Each Job 74500.00 74500.00
down, 22000/11000 V, 3 phase system, out door type, 400
29.00 All as per item No 28 herein before but 11000/433 V, 3 1.00 Each Job 56500.00 56500.00
phase, 4 wire system, out door type transformer, 100 KVA.
30.00 Material and Labour for winding HT coil with DPC or 900.00 Kilogram 780.00 702000.00
enamelled copper wire of existing size & guage winding
31.00 Material and Labour for LT coil winding with DPC or 600.00 Kilogram 780.00 468000.00
enamelled copper wire strip of existing size & guage
32.00 Material and Labour for painting of transformer 2.00 Each Job 5000.00 10000.00
22000/11000 V, 3 Phase system of capacity 400 KVA with
33.00 Material and Labour for painting of transformer 11000/433 1.00 Each Job 4500.00 4500.00
V, 3 Phase, 4 wire system of capacity 400 KVA with two
34.00 All as per item No 33 herein before but capacity of 100 to 6.00 Each Job 4000.00 24000.00
250 KVA.
35.00 Material and Labour for painting of transformer 433/230 V, 1.00 Each Job 3500.00 3500.00
3 Phase, 4 wire system capacity 50 KVA with two coats
36.00 Material and Labour for outdoor type gang operated air 1.00 Each Job 37500.00 37500.00
break switch triple pole, mechanically operated, mounted
37.00 Material and Labour for outdoor type gang operated air 3.00 Each Job 22500.00 67500.00
break switch triple pole, mechanically operated, mounted
38.00 Material and Labour in repairs for HT Drop out fuse 1.00 Each 17500.00 17500.00
assembly of 22 KV current rating of 50 Amps with 2 post
39.00 Material and Labour in repairs for HT Drop out fuse 3.00 Each 12500.00 37500.00
assembly of 11 KV current rating of 50 Amps with 2 post
40.00 Material and Labour in repair for Single disc insulator, 22 9.00 Each 2100.00 18900.00
KV with hardware fittings etc. complete all as specified and
41.00 Material and Labour for single disc type insulator, 9.00 Each 1200.00 10800.00
porcelain, vitreous, brown or white to suit HT 11 KV
42.00 Material and Labour for pin type insulator, porcelain, 15.00 Each 400.00 6000.00
vitreous, brown or white to suit HT 11 KV working pressure
43.00 Supply and Fixing in repairs 22 KV/33 KV Lightning 1.00 Set of 3 32500.00 32500.00
Arresters expulsion type complete with all fittings,
44.00 Supply and Fixing in repairs 11 KV Lightning Arresters 2.00 Set of 3 5250.00 10500.00
expulsion type complete with all fittings, transmission class
45.00 Material and Labour in repair for ACSR Conductor of .50 Quantial 41500.00 20750.00
weasel type for HT connection complete all as specified
46.00 Material and labour for Danger notice plate of 1.6mm thick 12.00 Each 250.00 3000.00
mild steel sheet, vitreous enamelled white, with letters,
47.00 Material and labour for preparation of old cement coated 6.00 Each Job 1900.00 11400.00
surface,cleaning the surface of the RCC HT pole above
48.00 Material and labour for preparation of old painted surfaces 1.00 Each Job 4500.00 4500.00
of HT 2 pole structure, channels and clamps, section size
49.00 Material and labour for preparation of old painted surfaces 1.00 Each Job 6800.00 6800.00
of HT 4 pole structure, channels and clamps, section size
50.00 Material and labour for servicing of HT 11 KV VCB along 9.00 Each Job 27500.00 247500.00
with CTs/PTs of current rating upto 400 A, rupturing
51.00 Item No. 50 Contin.........
(vii) Checking all end terminals, Tighting the nut bolt and
52.00 Supply and fixing, Closing Coil Assembly ( 24V/30V DC) 9.00 Each 3500.00 31500.00
as per existing size, type and suitable for 11 KV VCB
53.00 Supply and fixing ,of Tripping Coil Assembly ( 24V/30V DC) 9.00 Each 3500.00 31500.00
as per existing size, type and suitable for 11 KV VCB
54.00 Supply and fixing,of LED indicator of 27.00 Each 450.00 12150.00
RED/GREEN/YELLOW/AMBER including taking down old
55.00 Supply and fixing,of push button 9.00 Each 500.00 4500.00
RED/GREEN/YELLOW/BLACK including taking down old
56.00 Supply and fixing in repair of Digital Volt Meter of approx 8.00 Each 1800.00 14400.00
size 96 x 96 mm in square shape, capacity 0 to 500 Volts
57.00 Supply and fixing in repair of Digital Ammeter of approx 8.00 Each 1900.00 15200.00
size 96 x 96 mm in square shape, capacity as per existing
58.00 Material and labour for Calibration of protective relays both 9.00 Each Job 7000.00 63000.00
02 Nos over current and 01 No earth fault relay of IDMT or
59.00 Material and Labour for painting of the HT VCB of any 9.00 Each Job 2500.00 22500.00
make and type including PT enclosure, doors, etc with
60.00 Material and Labour for hiring, transporting and fault finding 3.00 Each Job 42500.00 127500.00
of 11 KV, HT underground UG cable of size 185 sq.mm,
61.00 Excavation in trenches not exceeding 1.5 mtrs. wide and 135.00 Cubic Metre 300.00 40500.00
not exceeding 1.5 Mtrs. in depth in trenches and getting out
62.00 Removing the excavation soil to a distance not exceeding 7.00 Cubic Metre 150.00 1050.00
50 mtr and depositing where directed at a level not
63.00 Returning, filling in including spreading and levelling 128.00 Cubic Metre 110.00 14080.00
watering and well ramming in layers not exceeding 25 cm
64.00 Supply, laying / spread in trenches, river sand including 5.00 Cubic Metre 2100.00 10500.00
cleaning, spreading, levelling, punning for laying
65.00 Supply and laying unreinforced precast concrete cable 300.00 Each 62.00 18600.00
covers, class HV, type- II flat size 300 x 180 x 40 mm
66.00 Taking down burnout cable and Supply and laying, testing 60.00 Running 2535.00 152100.00
and commissioning HT 11KV XLPE cable, PVC insulated, Metre
68.00 Supply and fixing , cable jointing kit for 11 KV (Earthed) 6.00 Each 15750.00 94500.00
grade cable for indoor termination heat shrink type joint
69.00 Supply and fixing , cable jointing kit for 11 KV (Earthed) 4.00 Each 18500.00 74000.00
grade cable for out door termination heat shrink type joint
70.00 Supply and fixing , cable jointing kit for 22 KV (Earthed) 4.00 Each 25000.00 100000.00
grade cable for out door termination heat shrink type joint
72.00 Taking out old earthing and Material and Labour for 8.00 Each Set 8500.00 68000.00
earthing complete with galvanised steel earth plate

Total in Figures 3146930.00

Lowest Amount Quoted BY: Powertech Equipments And Services(3006820.00)


Powertech Equipments sri manikandan PHEJAYS AGENCIES VVM CONSTRUCTIONS SRI LAKSHMI GANESH
And Services enterprises ENGINEERING WORKS

Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount

20.00 64720.00 18.00 58248.00 23.00 74428.00 24.00 77664.00 18.00 58248.00
190.00 66500.00 225.00 78750.00 205.00 71750.00 210.00 73500.00 200.00 70000.00
9750.00 9750.00 12500.00 12500.00 17500.00 17500.00 11500.00 11500.00 10500.00 10500.00
9250.00 9250.00 10150.00 10150.00 12500.00 12500.00 8500.00 8500.00 9750.00 9750.00
8975.00 8975.00 9500.00 9500.00 11500.00 11500.00 8250.00 8250.00 8500.00 8500.00
8825.00 26475.00 7500.00 22500.00 10500.00 31500.00 7600.00 22800.00 8250.00 24750.00
7500.00 7500.00 6250.00 6250.00 9000.00 9000.00 7100.00 7100.00 7900.00 7900.00
10500.00 10500.00 13650.00 13650.00 19500.00 19500.00 15450.00 15450.00 15750.00 15750.00
3250.00 6500.00 3750.00 7500.00 4800.00 9600.00 3500.00 7000.00 2700.00 5400.00
2875.00 5750.00 3250.00 6500.00 4200.00 8400.00 3260.00 6520.00 2500.00 5000.00
2750.00 5500.00 3175.00 6350.00 3700.00 7400.00 3415.00 6830.00 2240.00 4480.00
2500.00 7500.00 2985.00 8955.00 3500.00 10500.00 3325.00 9975.00 2250.00 6750.00
3100.00 6200.00 3500.00 7000.00 5500.00 11000.00 3700.00 7400.00 3300.00 6600.00
2650.00 5300.00 3350.00 6700.00 4750.00 9500.00 3250.00 6500.00 3450.00 6900.00
2400.00 4800.00 3250.00 6500.00 4250.00 8500.00 2800.00 5600.00 3200.00 6400.00
2265.00 4530.00 3100.00 6200.00 3750.00 7500.00 2250.00 4500.00 2900.00 5800.00
3750.00 11250.00 6500.00 19500.00 4400.00 13200.00 4800.00 14400.00 4500.00 13500.00
3460.00 10380.00 5500.00 16500.00 4200.00 12600.00 4560.00 13680.00 4350.00 13050.00
2200.00 4400.00 2800.00 5600.00 1500.00 3000.00 3000.00 6000.00 1250.00 2500.00
1800.00 1800.00 2500.00 2500.00 1200.00 1200.00 2475.00 2475.00 1100.00 1100.00
1650.00 9900.00 2100.00 12600.00 950.00 5700.00 2200.00 13200.00 1000.00 6000.00
1250.00 1250.00 1750.00 1750.00 800.00 800.00 1650.00 1650.00 850.00 850.00
450.00 4500.00 415.00 4150.00 350.00 3500.00 390.00 3900.00 525.00 5250.00
2250.00 20250.00 4100.00 36900.00 2550.00 22950.00 3250.00 29250.00 1850.00 16650.00
1750.00 7000.00 1050.00 4200.00 1675.00 6700.00 950.00 3800.00 1315.00 5260.00
2950.00 5900.00 1950.00 3900.00 3250.00 6500.00 1650.00 3300.00 1875.00 3750.00
65750.00 65750.00 90000.00 90000.00 68950.00 68950.00 72650.00 72650.00 89750.00 89750.00
48500.00 48500.00 65000.00 65000.00 51575.00 51575.00 64250.00 64250.00 52650.00 52650.00
758.00 682200.00 850.00 765000.00 780.00 702000.00 825.00 742500.00 840.00 756000.00
758.00 454800.00 850.00 510000.00 780.00 468000.00 825.00 495000.00 840.00 504000.00
6750.00 13500.00 7100.00 14200.00 4900.00 9800.00 4500.00 9000.00 2500.00 5000.00
5150.00 5150.00 5500.00 5500.00 4800.00 4800.00 4250.00 4250.00 2200.00 2200.00
3750.00 22500.00 3625.00 21750.00 4500.00 27000.00 2875.00 17250.00 2000.00 12000.00
3000.00 3000.00 3415.00 3415.00 3250.00 3250.00 2500.00 2500.00 1800.00 1800.00
39500.00 39500.00 38750.00 38750.00 39000.00 39000.00 42500.00 42500.00 35850.00 35850.00
27500.00 82500.00 25250.00 75750.00 28650.00 85950.00 26850.00 80550.00 24950.00 74850.00
19750.00 19750.00 22500.00 22500.00 23500.00 23500.00 20800.00 20800.00 19500.00 19500.00
13500.00 40500.00 14600.00 43800.00 15500.00 46500.00 12650.00 37950.00 14900.00 44700.00
2250.00 20250.00 1750.00 15750.00 2700.00 24300.00 1550.00 13950.00 1800.00 16200.00
1175.00 10575.00 1325.00 11925.00 1800.00 16200.00 950.00 8550.00 1250.00 11250.00
375.00 5625.00 400.00 6000.00 490.00 7350.00 255.00 3825.00 440.00 6600.00
29750.00 29750.00 32150.00 32150.00 30950.00 30950.00 31750.00 31750.00 33650.00 33650.00
4850.00 9700.00 5475.00 10950.00 6250.00 12500.00 6300.00 12600.00 5400.00 10800.00
38850.00 19425.00 39850.00 19925.00 39950.00 19975.00 35400.00 17700.00 41050.00 20525.00
235.00 2820.00 400.00 4800.00 210.00 2520.00 295.00 3540.00 350.00 4200.00
1600.00 9600.00 1500.00 9000.00 1400.00 8400.00 2600.00 15600.00 1200.00 7200.00
4250.00 4250.00 4000.00 4000.00 3845.00 3845.00 3400.00 3400.00 1800.00 1800.00
7500.00 7500.00 6500.00 6500.00 7250.00 7250.00 5200.00 5200.00 4250.00 4250.00
25750.00 231750.00 29650.00 266850.00 28750.00 258750.00 27500.00 247500.00 27500.00 247500.00

3750.00 33750.00 4365.00 39285.00 5000.00 45000.00 3500.00 31500.00 3440.00 30960.00
3750.00 33750.00 4365.00 39285.00 5000.00 45000.00 3500.00 31500.00 3440.00 30960.00
365.00 9855.00 210.00 5670.00 490.00 13230.00 315.00 8505.00 295.00 7965.00
390.00 3510.00 195.00 1755.00 520.00 4680.00 265.00 2385.00 395.00 3555.00
2175.00 17400.00 475.00 3800.00 1900.00 15200.00 1250.00 10000.00 1400.00 11200.00
2200.00 17600.00 450.00 3600.00 1800.00 14400.00 1150.00 9200.00 1450.00 11600.00
6750.00 60750.00 8000.00 72000.00 5800.00 52200.00 7250.00 65250.00 6800.00 61200.00
2250.00 20250.00 3200.00 28800.00 850.00 7650.00 2850.00 25650.00 2500.00 22500.00
38500.00 115500.00 52500.00 157500.00 55000.00 165000.00 45000.00 135000.00 40500.00 121500.00
275.00 37125.00 225.00 30375.00 310.00 41850.00 295.00 39825.00 245.00 33075.00
135.00 945.00 110.00 770.00 142.00 994.00 155.00 1085.00 125.00 875.00
95.00 12160.00 90.00 11520.00 105.00 13440.00 95.00 12160.00 85.00 10880.00
1850.00 9250.00 1650.00 8250.00 2350.00 11750.00 1850.00 9250.00 2100.00 10500.00
75.00 22500.00 55.00 16500.00 58.00 17400.00 65.00 19500.00 60.00 18000.00
2475.00 148500.00 2765.00 165900.00 2565.00 153900.00 2615.00 156900.00 2750.00 165000.00
14850.00 89100.00 16375.00 98250.00 15875.00 95250.00 17250.00 103500.00 14800.00 88800.00
17650.00 70600.00 19850.00 79400.00 19215.00 76860.00 18500.00 74000.00 19450.00 77800.00
22750.00 91000.00 25250.00 101000.00 24150.00 96600.00 26150.00 104600.00 21850.00 87400.00
7250.00 58000.00 6900.00 55200.00 5800.00 46400.00 6500.00 52000.00 7500.00 60000.00

3006820.00 3337228.00 3235397.00 3215369.00 3136683.00


L1 Amount L1 Vendor

58248.00 sri
manikanda
61250.00 M/s.Rejoy
Constructio
9750.00 Powertech
Equipment
8500.00 VVM
CONSTRU
8250.00 VVM
CONSTRU
22500.00 sri
manikanda
6250.00 sri
manikanda
10500.00 Powertech
Equipment
5400.00 SRI
LAKSHMI
5000.00 SRI
LAKSHMI
4480.00 SRI
LAKSHMI
6750.00 SRI
LAKSHMI
6200.00 Powertech
Equipment
5300.00 Powertech
Equipment
4800.00 Powertech
Equipment
4500.00 VVM
CONSTRU
11250.00 Powertech
Equipment
10380.00 Powertech
Equipment
2500.00 SRI
LAKSHMI
1100.00 SRI
LAKSHMI
5700.00 PHEJAYS
AGENCIES
800.00 PHEJAYS
AGENCIES
3500.00 PHEJAYS
AGENCIES
16650.00 SRI
LAKSHMI
3800.00 VVM
CONSTRU
3300.00 VVM
CONSTRU
65750.00 Powertech
Equipment
48500.00 Powertech
Equipment
682200.00 Powertech
Equipment
454800.00 Powertech
Equipment
5000.00 SRI
LAKSHMI
2200.00 SRI
LAKSHMI
12000.00 SRI
LAKSHMI
1800.00 SRI
LAKSHMI
35850.00 SRI
LAKSHMI
67500.00 M/s.Rejoy
Constructio
17500.00 M/s.Rejoy
Constructio
37500.00 M/s.Rejoy
Constructio
13950.00 VVM
CONSTRU
8550.00 VVM
CONSTRU
3825.00 VVM
CONSTRU
29750.00 Powertech
Equipment
9700.00 Powertech
Equipment
17700.00 VVM
CONSTRU
2520.00 PHEJAYS
AGENCIES
7200.00 SRI
LAKSHMI
1800.00 SRI
LAKSHMI
4250.00 SRI
LAKSHMI
231750.00 Powertech
Equipment

30960.00 SRI
LAKSHMI
30960.00 SRI
LAKSHMI
5670.00 sri
manikanda
1755.00 sri
manikanda
3800.00 sri
manikanda
3600.00 sri
manikanda
52200.00 PHEJAYS
AGENCIES
7650.00 PHEJAYS
AGENCIES
115500.00 Powertech
Equipment
30375.00 sri
manikanda
770.00 sri
manikanda
10880.00 SRI
LAKSHMI
8250.00 sri
manikanda
16500.00 sri
manikanda
148500.00 Powertech
Equipment
88800.00 SRI
LAKSHMI
70600.00 Powertech
Equipment
87400.00 SRI
LAKSHMI
46400.00 PHEJAYS
AGENCIES
BOQ Summary Details
Tender Title: REPAIRS AND MAINTENANCE TO HT INSTALLATIONS AND CONNECTED ITEMS AT INS PARUNDU
RAMNAD UNDER GE TIRUNELVELI
Tender ID: 2018_MES_226403_1

Sheet Name Sl.No Bidder Name Amount Bid Rank


BoQ1 1 Powertech Equipments And Services 3006820.00 L1
2 SRI LAKSHMI GANESH ENGINEERING WORKS 3136683.00 L2
3 M/s.Rejoy Constructions 3146930.00 L3
4 VVM CONSTRUCTIONS 3215369.00 L4
5 PHEJAYS AGENCIES 3235397.00 L5
6 sri manikandan enterprises 3337228.00 L6