Monthly Progress Report for the month of October-2019 Pertaining to QC&I sub division No.

2, Sircilla
District :Rajanna Siricilla Category : EPC Works
No. of tests to
Total quantity
Agreement Total QC be conducted /
Date of Progress (Expenditure) during the month in No. of inspections executed during
Value / Executi Certificates actual tests
Package No., Completion Crores during the month the month in
Revised ng upto last conducted by
S. No Name of the work Name of /Extentend Cum Remarks
Agreement Circle/ month/ QC Staff
Agency date of
value in division During the
completion Up to During
Cumulativ
Concret
Soil Concre
Crores last the Balance month AEE Dy.EE EE e in Soil
e in Cum te
Month Month Cum
1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19
Sripada Yellampally Project
Stage-II Phase-I works to
develop about 2.00 lakh acres of Package No.42 SYP
ayacut under Sripadasagar IVRCL- Circle ,
Project near Yellampally (V), work is stand still due to LA
1 Navayuga 1737 LMD 31.12.2019 1683.39 0 1683.39 53.61 136/0 0 0 0 0 0 0 problem at rudrangi tank
Ramagundam (M) in the unpland SEW (JV) Colony,
area of Karimnagar (D) (Beyond KNR
Hyderabad
Gangadhara)

Investigation, Designs &


execusion of canal network
system including Earth Work
Excavation, Forming Embank-
ment and construction of CM &
CD works and lining of canal up
to Sub Minors and formation of Package No.1 SYP
fieldchannels includingstructures Harvings Circle ,
2 to serve to an extent of 49500 Constr. (P) 78.49
LMD 31-12-2019 25.69 0 25.69 52.80 30/0 0 0 0 0 0 0 Work is Standstill
acres in Karimnagar Dist. under Ltd, JSR (JV), Colony,
Gangadhara tank and its Hyd. KNR
concerned gravitiy canals (Canal
network package 1)

Detailed investigation and design


of SYP Canal Network system
including CMCD works with
lining of Canals up to subminors
and field channels including
structures to serve an ayacut of
58800 acres in Karimnagar
Package No.3 SYP
District under Kodimyal,
Circle ,
Potharam, Surampet, Lacnapet, SEL-GKC
3 New tank 450 tanks and its 99.34 LMD 30-6-2018 69.76 0 69.76 29.58 68/0 0 0 0 0 0 0 Agency Filed for precloser of work
(JV), Colony,
concerned gravity canals (canal Hyderabad KNR
network package 3)
No. of tests to
Agreement Total QC Total quantity be conducted /
Date of Progress (Expenditure) during the month in No. of inspections
Value / Executi Certificates executed during actual tests
Package No., Completion Crores during the month
Revised ng upto last the month conducted by
S. No Name of Work Name of /Extentend QC Staff Remarks
Agreement Circle/ month/
Agency date of
value in division During the
completion Up to During Concret
Crores Cumulativ month Soil Concre
last the Balance AEE Dy.EE EE e in Soil
e in Cum te
Month Month Cum

Construction of spillway from 16 M/s.Sri Raja


to 26 blocks upto crest level +El Rajeswari IFFCC,
309.25 and formation of Right LMD Drilling of drainage holes is
4 side earth bund upto TBL
Constns. 101.8
Colony,
31-8-2018 98.53 0 98.53 3.27 22/0 12 10 0 0 0 0/0 under progress
+323.00 etc., of Mid Manair (India) KNR
Reservoir Pvt.Ltd., Hyd

Kaleshwaram project - package


no.9. Investigation,execution,of
tunnel 3.600km to 6.200 from
6.525 to 8.775, from 10.775 to
13.575 , from 14.300 to 14.635
surgepool,draft pool tunnel
Kaleshw
,pump house at malkapet and Package No.9 aram
formation of battala cheruvu M/s MRKR Project
including surplus weir head draft tube work is under
5 sluice and earth work excavation
Constructions 214.02 Circle-2, 18.6.2019 156.7 0 156.7 57.32 17/0 9 7 0 0 0 0 progress
and industries LMD
and lining of approch channel
pvt.ltd Colony,
from km0.00 to
KNR
km.0.500(singasamudram) 60C1

Kaleshwaram project -link-III


-package No.9- investgation and
earth work excavation and
formation of embankment of
gravity canals including lining
construction of CM&CD Kaleshw
works,conbstruction of Package No.9 aram
regulators , excavation of tunnel M/s MRKR Project
2.600 to 3.600 lining of tunnel Excavation of main tunnel is in
6 Constructions 276 Circle-2, 15.7.2019 77.16 5.27 82.43 193.57 15/1 9 7 5962 1100 135/135 1/1 progress.
from 8.375 to 10.375 , presuure and industries LMD
main from singasamudram tank pvt.ltd Colony,
to battala cheruvu with all KNR
associated works etc., 60C2

Kaleshwaram project -package


No.9- investgation, design and
Execution of Pumps, Electro
Mechanical and all other
associated Works for Stage-1 at Kaleshw
Malkapet Reservoir and Stage-II Package No.9 aram
atsingasamudram tank including M/s MRKR Project
7 Operation and Maintainance of Constructions 167 Circle-2, 15.11.2019 91.09 0 91.09 75.91 5/0 0 0 0 0 0 0 Work is in progress.
Electro Mechanical Works. and industries LMD
pvt.ltd Colony,
KNR
No. of tests to
Total quantity
be conducted /
Agreement Progress (Expenditure) during the month in Total QC No. of inspections executed during
Date of actual tests
Value / Executi Crores Certificates during the month the month in
Package No., Completion conducted by
Revised ng upto last Cum
S. No Name of the work Name of /Extentend QC Staff Remarks
Agreement Circle/ month/
Agency date of
value in division During the
completion
Crores month
Up to During Concret
Cumulativ Soil Concre
last the Balance AEE Dy.EE EE e in Soil
e in Cum te
Month Month Cum

SYP Stage II phase I Package No.1 SYP


construction of gravity canal Harvings Circle ,
from Gangadhara to vemulwada
8 and Stambampally including up
Constr. (P) 24.11 LMD 31.12.2019 7.71 0 7.71 16.40 16/0 0 0 0 0 0 0 Work is standstill
Ltd, JSR (JV), Colony,
gradation of Gangadhara and
Hyd. KNR
Stambampally tanks.

Total 2697.76 2210.03 5.270 2215.30 482.46 309/1 30 24 5962 1100 135/135 1/1

Deputy Executive Engineer


Assistant Engineer
QC &
QC & I Sub division No.2
I Sub division No.2
Siricilla
Siricilla
Monthly Progress Report for the month of October-2019 Pertaining to QC&I sub division No.2, Sircilla

District :Rajanna Siricilla Category : Non EPC Works


Total QC
No. of tests to
Date of Certificate Total quantity
Progress (Expenditure) during the be conducted /
Completio s upto last No. of inspections executed during
Agreement month in Crores actual tests Remarks
Executing n/ month/ during the month the month in
S. Package No., Value / revised conducted by
Name of Work Circle/divisi Extended During the Cum
No Name of Agency Agreement QC Staff
on date of month
Value (in crores)
completio
Up to
n During Cumula AEE/ Concret Concre
last Balance Dy.EE EE Soil Soil
the Month tive AE e te
Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Balance work for EWE and
formation of Embankment and M/s SRRCIPL- Drilling of
SMSL & Rs IFFCC, LMD drainage holes
1 construction of Spillway from 316.59/Rs.452.79 Colony, KNR
1-12-2018 367.574 0 367.57 85.22 32/1 12 10 0 0 0 0
is under
Spillway Blocks 1 to 15, etc., of BEKEM (jv),
Hyderabad progress
Mid Manair Reservoir.
FFC From SRSp Pckg No.1- Package No.1
RE-Engineering of IFFC project M/s KKRC
from SRSP-EWE,Forming Infrastructures
Emabankment and Construction Pvt Ltd,504,My
of CM&CD works of main Homes Mount
canal and distributary system View
upto water course level and Apt,Navodaya
other allied works including colony,Yellaredd
investgation. Design and yguda IFFC Circle-I
Rs.49.72 / Dharoor work is
2 execution of Mid Manair right ,Hyderabad,5000 27.10.2017 68.12 0 68.12 7.17 13/0 0 0 0 0 0 0
Rs.69.46/75.289 Camp standstill
side canal from Km.0.000 to 73 ,Jagityal
Km.12.375/17.750 in
karimnagar and Rajanna
Siricilla District for balance
work including Re engineering
in karimnagar And Rajanna
Siricilla District.

Kaleshwaram project- package


No.9- formation of new Kaleshwaram Rising of bund
M/s. MRKR - Project Circle- and sluice
3 reservoir at malakpet (V) Rs. 472 14.9.2019 301.55 0 301.55 170.45 20/0 4 4 0 0 0 0
HES (JV) Hyd. 2, LMD work is in
konaraopet (M),from the Colony, KNR progress.
enhanced capacity of 3.00 TMC
No. of tests to
Date of Progress (Expenditure) during the Total quantity be conducted /
Total QC No. of inspections
Completio month in Crores executed during actual tests
Agreement Certificate during the month
Executing n/ the month conducted by
S. Package No., Value / revised s upto last
Name of Work Circle/divisi Extended QC Staff Remarks
No Name of Agency Agreement month/
on date of
Value (in crores) During the
completio
month
n
Up to
During Cumula Concret Concre
last Balance AE Dy.EE EE Soil Soil
the Month tive e te
Month
Providing Infrastructure
facilities and basic Amentities at IFFC
R&R Center for the project Circle/Divisio work is
4 V.Prudvidhar rao Rs.3.38/4.04 22.02.2018 4.04 0 4.04 0.00 3/0 0 0 0 0 0 0
displaced families of n No.2 LMD standstill
chinthaltana -under colony
submergence of MMR

Construction of balance work of IFFC


M/s SRRC Pvt Circle/Divisio work is
5 formation of Mid Manair Rs.5.8 18.07.2017 5.06 0 5.06 0.74 3/0 0 0 0 0 0 0
Ltd n No.2 LMD completed
Reservoir colony

IFFCC-Providing Lift Irrigation


Scheme on Moolavagu from M/s Nvayuga IFFC
Foreshore of Mid Manair Engineering Circle/Divisio work is
6 14.64 n No.2 LMD
20.08.2018 13.76 0 13.76 0.88 5/0 0 0 0 0 0 0 completed
Reservoir to supplement the Company,Hydera
Gudi cheruvu of Vemulawada bad colony
Temple Town

Sripada Yellampally Project


Stage-II Phase-I-Investigation
design & Execution of canal net
work system including earth
work excvavtion and formation
embankment, comstruction of
SYP
CM&CD works and lining of VENSA- circle/LMD Work is stand
7 canals up to sub minors and 173.26/175.79 10/10/2019 0.8 0 0.8 174.99 1/0 0 0 0 0 0 0
SEW(JV) colony still
formation of field channels karimnagar
including structures to serve to
an extent of 43100 Acres in
Rajanna siricilla and jagitial
dist.Pckg2

Total 1200.349 760.904 0.00 760.90 439.44 77/1 16 14 0 0 7/7 10/10

Deputy Executive Engineer


Assistant Engineer
QC & I Sub
QC & I Sub division No.2
division No.2 Siricilla
Siricilla
Monthly Progress Report of Sub-Division No.2, Siricilla Division No.7 karimnagar for the month of October-2019
District Rajanna Siricilla Category : Minor Irrigation ( MTB's and Other than MK)
Total QC Total quantity No.of tests to
Agreemen Progress (Expenditure) during the Certificates No. of inspections
Date of executed during the conducted/actual tets
t Value / month in Crores upto last during the month
Package Executing Completio month in Cum conducted by QC staff
Revised month/
S. No Name of Work No., Name Circle/ n/Extenten Remarks
Agreemen During the
of Agency division d date of Up to During
Cumul Concrete Soil
t value in last the Balance month AE Dy.EE EE Concrete Soil
completion ative in Cum in Cum
Crores Month Month

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MI-Mission Kakatiya M/s
Phase - II -Conversion of Paramitha IB
Gudi cheruvu (Oora Constructi work is
1 Rs.34.54/R Division 31.12.2018 40.64 0 40.64 21.19 9/0 0 0 0 0 0 0
Cheruvu as Mini tank ons Pvt s.61.83 Siricilla
stand still

bund in vemulwada Ltd


Hyderabad
MI - Mission Kakatiya
Phase - III - Permanent
Restoration and Prabhakar
IB
Conversion of Pedda reddy Work is
2 Rs.5.56
Division 11.08.2018 2.9 0 2.9 2.66 2/0 0 0 0 0 0 0
cheruvu as Mini tank &Co. Siricilla
stand still
bund in Hyderabad
Musthabad(V&M)

MI Mission Kakatiya M/s


Phase - II -Restoration Paramitha
and Beautification of IB the work is
Constructi
3 Kotha Cheruvu as Rs.2.94 Division 11.05.2017 1.68 0.35 2.03 0.91 4/1 2 2 0 0 0 0 closed by
ons Pvt Siricilla the agency
Minitank bund in Ltd
Siricilla(V&M). Hyderabad
MI - Mission Kakatiya
Phase - III - Conversion
IB
4 of Gidda cheruvu as Mini Prudvidhar Rs.2.59 Division 18.11.2018 1.71 0 1.71 0.88 2/0 0 0 0 0 0 0
Work is
tank bund in Rao standstill
Siricilla
Yellareddypet(V&M)

MI- Mission Kakatiya


Phase - III - Conversion IB
5 of Namaz Cheruvu as Prudvidhar Rs.3.68 Division 12.11.2018 1.91 0 1.91 1.77 2/0 0 0 0 0 0 0
Work is
Mini tank bund in Rao Siricilla
standstill

Gambhiraopet(V&M)
Total 76.6 48.84 0.35 49.19 27.41 19/1 2 2 0 0 0/0 0/0

Deputy Executive Engineer


Assistant Engineer
QC&I Sub division QC & I Sub division
No.2 Siricilla. No.2 Siricilla
ABSTRACT FOR PROGRESS OF WORKS OF QUALITY CONTROL & INSPECTION SUB DIVISION NO.2 SIRICILLA FOR THE MONTH OF OCTOBER-2019

Progress during the month in Crores/ Total QC No. of inspections during Total quantity executed No. of tests to be conducted / actual tests
Total No Expenditure details Certificates the month during the month conducted by QC Staff
Total No
S. Description Of Of Works
Of Concrete Soil Remarks
No Work In upto During
Works Up to During the Cumulativ
Progress Balance last the AE Dy. EE EE Concrete Soil To be Actually To Be
last Month Month e Conducte Conducted Actually
month month conducted
d Conducted
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21
1 Major Irrigation
i EPC 8 4 2200.11 9.920 2210.03 487.73 305 2 25 19 500 0 6 6 0 0
ii NON-EPC 7 2 747.95 10.03 757.98 442.37 75 2 21 17 613 57283 7 7 10 10
2 Minor Irrigation 5 0 48.84 0.35 49.19 27.41 19 1 2 2 0 0 0 0 0 0
3 TSIDC 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0
Total 20 6 2996.90 20.300 3017.20 957.51 399 5 48 38 1113 57283 13 13 10 10

Assistant Engineer Deputy Executive Engineer


QC & I Sub QC & I
division No.2 Siricilla Sub division No.2 Siricilla
ABSTRACT FOR PROGRESS OF WORKS OF QUALITY CONTROL & INSPECTION SUB DIVISION NO.2 SIRICILLA FOR THE MONTH OF OCTOBER 2019

Total No of works in Total No of certificates No of inspections made during the


Total No of works Proposed
progress issued month
for total
SL. payment
Category of the work Remarks
NO during the
Non Non Non month in
EPC Total EPC Total EPC Total Crores AEE/AE DEE EE Total
EPC EPC EPC

1 Major Irrigation 8 7 15 4 3 7 2 2 4 19.95 46 36


2 Medium Irrigation 0 0 0 0 0 0 0 0 0 0 0 0
3 Minor Irrigation 0 5 5 0 0 0 0 0 0 0.35 2 2
4 TSIDC 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 8 12 20 4 3 7 2 2 4 20.30 48 38

Assistant Engineer Deputy Executive Engineer


QC & I Sub division No.2 QC & I Sub
Siricilla division No.2 Siricilla