2, Sircilla
District :Rajanna Siricilla Category : EPC Works
No. of tests to
Total quantity
Agreement Total QC be conducted /
Date of Progress (Expenditure) during the month in No. of inspections executed during
Value / Executi Certificates actual tests
Package No., Completion Crores during the month the month in
Revised ng upto last conducted by
S. No Name of the work Name of /Extentend Cum Remarks
Agreement Circle/ month/ QC Staff
Agency date of
value in division During the
completion Up to During
Cumulativ
Concret
Soil Concre
Crores last the Balance month AEE Dy.EE EE e in Soil
e in Cum te
Month Month Cum
1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19
Sripada Yellampally Project
Stage-II Phase-I works to
develop about 2.00 lakh acres of Package No.42 SYP
ayacut under Sripadasagar IVRCL- Circle ,
Project near Yellampally (V), work is stand still due to LA
1 Navayuga 1737 LMD 31.12.2019 1683.39 0 1683.39 53.61 136/0 0 0 0 0 0 0 problem at rudrangi tank
Ramagundam (M) in the unpland SEW (JV) Colony,
area of Karimnagar (D) (Beyond KNR
Hyderabad
Gangadhara)
Total 2697.76 2210.03 5.270 2215.30 482.46 309/1 30 24 5962 1100 135/135 1/1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MI-Mission Kakatiya M/s
Phase - II -Conversion of Paramitha IB
Gudi cheruvu (Oora Constructi work is
1 Rs.34.54/R Division 31.12.2018 40.64 0 40.64 21.19 9/0 0 0 0 0 0 0
Cheruvu as Mini tank ons Pvt s.61.83 Siricilla
stand still
Gambhiraopet(V&M)
Total 76.6 48.84 0.35 49.19 27.41 19/1 2 2 0 0 0/0 0/0
Progress during the month in Crores/ Total QC No. of inspections during Total quantity executed No. of tests to be conducted / actual tests
Total No Expenditure details Certificates the month during the month conducted by QC Staff
Total No
S. Description Of Of Works
Of Concrete Soil Remarks
No Work In upto During
Works Up to During the Cumulativ
Progress Balance last the AE Dy. EE EE Concrete Soil To be Actually To Be
last Month Month e Conducte Conducted Actually
month month conducted
d Conducted
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21
1 Major Irrigation
i EPC 8 4 2200.11 9.920 2210.03 487.73 305 2 25 19 500 0 6 6 0 0
ii NON-EPC 7 2 747.95 10.03 757.98 442.37 75 2 21 17 613 57283 7 7 10 10
2 Minor Irrigation 5 0 48.84 0.35 49.19 27.41 19 1 2 2 0 0 0 0 0 0
3 TSIDC 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0
Total 20 6 2996.90 20.300 3017.20 957.51 399 5 48 38 1113 57283 13 13 10 10