BOQ and Price Format of Geotechnical investigation for

Sl No. Item Description Qty. Unit Basic Price GST%

A. Mobilisation and Demobilisation


Mobilisation and Demobilisation of boring rig, other in-situ test equipment,
personnel etc. for carrying out investigations on land, locating all bore holes
A-1. and other test points and taking their RLs and demobilisation on completion of 3 Nos. 14,000 18%
work and removal from site. (Bidder shall indicate number and type of rigs he
proposes to mobilise to complete the work within the stipulated time).

B. INVESTIGATION ON LAND
Setting out and excavating pits at each borehole location, of 1M x 1M minimum
size at the bottom, in all types of soil/fill/soft rock/slag upto 2.5 M depth
B-1 below ground level, for locating underground cables, utility lines, etc. including 25 Cum 3,000 18%
dewatering, shoring et., as required, all materials, tools, plants and labour
complete.
Setting up boring rig at each borehole location as decided by Engineer. (Any
B-2 crisscross or back and forth movement of boring rig can take place. No 0 Nos. 1500 18%
additional compensation will be payable by the owner for such movements).

Boring 150 mm dia. Through all kinds of soils, weathered rock, and soft
(disintegrated) rock including chiseling with adequate/ suitable equipment
B-3 including prevention of collapse of bore hole walls wherever necessary for
depths measured below existing ground level:
a) 0 – 10 m 300 Rm 2,000 18%
b) 10m to 20m 300 Rm 2,500 18%
c) 20m to 30m 300 Rm 3,000 18%

Collection (including preservation and transportation to laboratory) of


B-4 undisturbed tube samples of soil collected from bore hole as per specification 150 Nos. 350 18%

Collection (including preservation and transportation to laboratory) of


B-5 200 Nos. 300 18%
disturbed samples of soil collected from bore hole as per specification

Boring through rock using Nx size diamond bit/double tube core barrel
B-6 including collecting and preservation the rock core in wooden boxes in a
proper sequence, recording recovery & RQD, maintaining drilling observations
for the following depths measured below existing GL

Sl No. Item Description Qty. Unit Basic Price GST%

a) 0-10 m Rm
b)10 m & above 200 Rm 2,500 18%
Conducting Standard Penetration tests and collecting and transporting the
B-7 60 Nos. 250 18%
samples collected from split spoon sampler as per specification.

Excavating trial pits of size 3m x 3m and 3m to 4m deep at locations as


specified including conducting pocket penetrometer tests, with necessary
B-8 shoring, dewatering, removal of materials, backfilling etc. complete as 300 cum 1,000 18%
specified.

B-9 Obtaining undisturbed samples from trial pits and test pits including 10 Nos.
numbering, specifying the depth at which it is collected and sealing the same. 2,000 18%

B-10 Collecting bulk disturbed samples from test pits and trial pits. 10 Nos. 2,000 18%
Collecting ground water samples from drill holes (minimum 2 liters) including
B-11 preservation and transportation to laboratory 30 Nos. 1,000 18%

B-12 Recording of stable ground water table for each bore hole as per specification 30 Nos. 500 18%
B-13 Conducting Electrical Resistivity tests as per IS 3043 5 Nos. 8,000 18%
Conducting Field Permeability test in trail pits at 2.5m and 4m depth by falling
B-14 head or constant head method as per IS:5529. 5 Nos. 10,000 18%

Setting out & Conducting cyclic Plate load test as specified in IS: 5249 at 3M
below ground level as directed including excavation, shoring, dewatering,
B-15 backfilling with compacted earth, placement of kentledge, etc. all materials and 3 Nos. 120,000 18%
labour complete in all respects as per IS:1888 & IS: 5249.

Setting out and conducting routine plate load test as specified in IS:1888 at 3
B-16 M below ground level as directed including excavation, shoring, dewatering, 5 Nos.
backfilling with compacted earth, placement of kentledge, etc. all materials and 80,000 18%
labour complete in all respect.

C. LABORATORY TESTS 18%


Grain size analysis: 18%
C-1
C-1 a) Hydrometer analysis 20 Nos. 400 18%
b) Sieve analysis 130 Nos. 300 18%
C-2 Liquid limit, plastic limit, Shrinkage limit and plasticity index. 150 Nos. 300 18%
C-3 Field density and moisture content. 150 Nos. 350 18%
C-4 Specific gravity of soil. 150 Nos. 150 18%
C-5 Laboratory determination of permeability 150 Nos. 2250 18%
C-6 Determination of consolidation properties of soil 10 Nos. 1500 18%
C-7 Swelling pressure with free swell and differential swell indices 10 Nos. 500 18%
C-8 Unconfined compressive strength 20 Nos. 2500 18%
C-9 Direct Shear test 10 Nos. 680 18%
C-10 Triaxial Compressive strength 10 Nos. 800 18%

Sl No. Item Description Qty. Unit Basic Price GST%

a) Unconsolidated undrained test. 10 Nos. 450 18%


b) Consolidated undrained test. 10 Nos. 450 18%
c) Consolidated drained test. 10 Nos. 450 18%
C-11 Moisture-density relations for 18%
(a) Standard Proctor/equivalent IS test 5 Nos. 800 18%
(b) Modified Proctor density test 5 Nos. 1500 18%
C-12 California Bearing Ratio (CBR) 5 Nos. 1800 18%
a) Chemical analysis of soil including sulphates, chlorides, pH value, carbonates,
20 Nos. 1500 18%
nitrates, etc.
C-13
b) Chemical Analysis on 2:1 water: soil extract of the samples giving SO3 10 Nos.
content only. 1500 18%

C-14 Full chemical analysis of ground water including pH value, sulphates, 30 Nos.
chlorides, carbonates, nitrates organic matter, etc. 1500 18%

C-15 Crushing strength of rock on specimens of NX size with co-eff of softening 30 Nos. 1800 18%
C-16 Water absorption & porosity of rock samples 15 Nos. 800 18%
C-17 Bulk density of rock 30 Nos. 350 18%
C-18 Unconfined compressive strength of rock 30 Nos. 1200 18%
C-19 Point load strength index of rock 30 Nos. 1500 18%
C-20 Slake durability index of rock 30 Nos. 2000 18%
C-21 Specific gravity of rock 30 Nos. 300 18%
D. PREPARATION OF REPORT

Preparation and submission of four copies of draft report and ten copies of
final report of geotechnical investigations and foundation recommendations. 80,000 18%
D-1. Lump-sum
(No additional compensation is payable by the owner for any expenses
incurred by the contractor for travel, etc. Or for meetings / discussions with
owner / consultants)

(A + B+ C ) Gr. Total Rs. 61,94,174


Consumable (Gases, Electrodes etc) shall be in contractor scope of work

All equipments,rigs, crane of any capacity, scaffolding, manlifter etc required for execution shall be in contractor scope. Equipment used for execution at the time of mo
than 3 year old from manufacturing date.

The Rate quoted by you should ensure complete execution of work/activity mentioned against each line of Rate schedule. The rates quote will deemed to include all ac
mentioned or not, which are required for satisfactory and complete execution of work.

The price quoted shall be fixed and firm till completion of the job.

The price offer shall be valid upto 90 days from date of submission

Note:
1 Necessary Gate pass is in client,s scope.
2 Moblization of men and machineries within 10 days on receiving of work order
3 25% advance on work order amount.
4 Time to time running bill will claimed on copmetion of field work.
5 90 % payment against runing bill.
6 10% on submission of final test report.
7 Client supervision during work is in your scope.
tion for

Total excluding Total including


GST in Rs
GST GST

2520 42000 49560

540 75000 88500

270

360 600000 708000


450 750000 885000
540 900000 1062000

63 52500 61950

54 60000 70800

A TOTAL 2925810.00

Total excluding Total including


GST in Rs
GST GST

450 500000 590000

45 15000 17700

180 300000 354000

360 20000 23600

360 20000 23600

180 30000 35400

90 15000 17700

1440 40000 47200

1800 50000 59000

21600 360000 424800

14400 400000 472000


72 8000 9440
54 39000 46020
54 45000 53100
63 52500 61950
27 22500 26550
405 337500 398250
270 15000 17700
90 5000 5900
450 50000 59000
122.4 6800 8024
144 8000 9440
B TOTAL 2760374.00
Total excluding Total including
GST in Rs
GST GST

81 4500 5310
81 4500 5310
81 4500 5310

144 4000 4720


270 7500 8850
324 9000 10620

270 30000 35400

270 15000 17700

270 45000 53100

324 54000 63720

144 12000 14160


63 10500 12390
216 36000 42480
270 45000 53100
360 60000 70800
54 9000 10620

14400 14400 94400

(C ) TOTAL 507990.00

Gr. Total Rs. 61,94,174

ipment used for execution at the time of mobilisation shall not be more

The rates quote will deemed to include all activities, whether specifically