Documente Academic
Documente Profesional
Documente Cultură
Page 1 of 8
Project Background and Business Need:
Barotiwala has conducted L &T machine guardign audit and to comply to the observations few modifications in existing guarding is
required . Unit proposes to install new guards which will comply to the observed points
Project Objectives
Ensure 360 degree guarding on WRA and BSM machines complying to L&T audit report
Business Objectives
No items.
Project Constraints
No items.
Project Assumptions
No items.
Page 2 of 8
In Scope:
Fabrication and Installation of machine gaurds
Out of Scope:
Installation of other fixed guards on packing line
Potential Alternatives:
modification can be done in exisiting guard , however it will not close 100 % of the observation
Conclusion:
Unit proposes to install the new guards on WRA and BSM
Page 3 of 8
Section B: Performance, Affordability and Milestones
Project Key Performance Indicators:
KPIs Unit of Measurement Figure
Project Affordability:
Expected Capital Cost (€) Expected Expense Cost (€) Expected Asset Write Off Cost (€)
16250 0
Expected Total Cost (€) IRR (%) NPV (€)
16250 0.00 0
Payback (years) Affordability Threshold Reached?
0.00
Key Milestones:
Milestone Date
Page 4 of 8
Section C: Project Classification
Project Type: Scoring:
Type D-Very Simple 7.50
Criteria & Level:
Criteria Level
Customer and Consumer Impact 0
Difficulty 1
Technological Change 0
Management Effort 1
Verification Table:
Page 5 of 8
Section D: Cardinal Rules
Assessment Method: Participants in Assessment:
Cardinal Rules:
Theme Cardinal Rule Answer
Risk Detection Questions have not yet been completed.
Verification Table:
Verifier Verifier Roles Verification Date Remarks
No items.
Page 6 of 8
Section E: Overall Project Risk Classification
Assessment Method: Participants in Assessment:
Overall Project Risk Classification Scoring and Banding:
Subject Consequence Likelihood Risk Scoring
Verification Table:
Verifier Verifier Roles Verification Date Remarks
No items.
Page 7 of 8
Section F: Control & Monitoring
Key Risks:
Export Details
Exported By: Exported Date:
Mishra5, Ashish 04 Nov 2019 07:17 AM
Project Sponsor: Link:
Mishra5, Ashish https://unilever.beca360.com/Project/2818
Page 8 of 8