Plant operation - Operation manual

1. START, STOP AND


OPERATION

General
This chapter describes the actions to Operation method
take in the order they should be per-
The operation of the genset is carried
formed when operating the power plant.
out from the control room. Auxiliary
These instructions gives general view of
equipment is controlled from local con-
the daily routines and step-by-step in-
trol panels mounted close to the equip-
structions when starting or shutting
ment.
down the power plant.

Doc id: WDAAA311909 - 1-1


1. START, STOP AND OPERATION Hitz; F1-Project, WPP10185

Start-up sequence

General Start-up sequence


LO system
It is assumed that all units are shut 6 Check the oil level in the engine
down but that power is available from sump. Add oil if necessary.
the main grid. It is also assumed that all 7 Check the centrifugal filter. Clean if
units are in operational condition. necessary.
Some of the actions to take depend on 8 Purge the sludge out of the safety fil-
the length of time the plant has been ter chambers. Replace the filter car-
shut down and may not be required if tridges if the engine has been shut
the plant has been shut down for a brief down for a prolonged period.
period only. In such cases the decision of
what to exclude must be left to the dis- Cooling water system
cretion of the operating personnel. 9 Check the water level of the expan-
sion vessels. Fill up and vent the sec-
Occasionally during stoppage covers are
tions if necessary.
removed for measurements and checks.
Before start it should be made sure that 10 Check that the automatic preheating
all covers and protective shields are unit is activated.

Z
mounted properly.
Generator
NOTE : 11 Clean the generator from moisture,
If a unit is found to be faulty it dust and dirt.
should be repaired or replaced be-
12 Check that the generator is ready for
fore continuing the start-up proce-
dure. start.
13 Check that the anticondensation
heater is in AUTO position.
10 hours before start of the
genset
1 hour before start of the
Compressed air system genset
1 Drain the condensate out of the sys-
tem. LO system
1 Set the prelubricating pump in auto-
2 Set the compressor unit in automatic
operation. matic operation.
3 Ensure that the backup compressor, 2 Check the prelubrication.
if installed, are in operational condi- ! Cut-off valves open.
tion. ! All chambers in the fine filter are
in use. Vent the filter if necessary.
Fuel system
4 Ventilate the engine hall properly. 30 minutes before start of the
5 Prepare the pressure reduction, gas genset
measuring unit and gas regulating

Z
unit for start of the engine. Charge air and exhaust gas system
1 Check the air intake for obstructions.
NOTE :
Do not open the gas circuit main Clear if necessary.
valve at this point. 2 Drain out any accumulated liquid
from the silencers.
3 Check that the drain pipe of the
charge air cooler casing is open.

1-2 Doc id: WDAAA311909 -


Plant operation - Operation manual

Start-up sequence

4 Check that the exhaust gas ventila- ! Safety shut-off valves are open.
tion unit is in automatic operation. + The cooling system is in running or-
der:
Starting air system ! Correct preheating and pressure.
5 Open the starting air valve on the air
bottle.
! Sufficient precirculation to heat
the engine.
Gas fuel system + LO pressure exceeds 0.5 bar.
If the power plant has been shut-down + Turning gear is not engaged.
for a prolonged period and the gas inlet + Engine is in the “STOP” condition.
valves are closed: + Exhaust gas system is properly
6 Open the valves slowly to avoid a vented.
blast.
7 Check that all manual operated Start of the genset
valves are in correct position. 1 Start the genset from the central
control panel or operators station.
Cooling system 2 Check that the pressure and temper-
8 Set the cooling system in to opera- ature readings are normal.
tion.
3 Check for alarms.

Before start Connecting the genset to the


Before starting the engine check that: grid
+ Starting air pressure exceeds 15 bar. 1 Synchronize the genset to the busbar
+ Control air pressure exceeds 7 bar. and grid.
+ The gas fuel system is in running or- ! When connecting to a live busbar,
der: the connection must be synchro-
! Correct gas inlet pressure. nized.
! When connecting to a dead busbar,
no synchronizing is needed.

Doc id: WDAAA311909 - 1-3


1. START, STOP AND OPERATION Hitz; F1-Project, WPP10185

Normal operation, daily checklist

General + Test checklist


Normal operation, daily the functioning of the emergency
lighting system.
There is no automatic supervision or
control arrangement that can replace an
experienced engineer’s observations. Genset
On the daily inspection tours the opera- Gas engine
tor should take readings, perform mea-
surements and other inspection routines. + Check the operating hours.
It is of great importance that all actions + Read all thermometers and pressure
are scrupulously and well recorded in gauges.
the power plant logbook. Note the devi- ! Read the load at the same time.
ating values and give the possible source + Check the ventilation of the engine
of the cause. Read appropriate sections cooling water system.
in the corresponding binder series for in-
+ Check that the crankcase breather is
formation on maintenance routines. To
functioning properly.
utilise trend information a continuous
+

Z
record is essential. Check the speed of the engine.
+ Check the main bearing temperatures.
NOTE : + Check the speed of the turbocharger.
Although some readings can be
read straight from the terminal of + Clean the compressor of the turbo-
the control room, the readings charger (every second day).
should be checked from the local
gauges and indicators, if installed. Generator
At the same time it is good opportu- + Check the power of the generator.
nity to check the unit visually and + Check the phase current of the gener-
ensure that the sensors and trans- ator.
mitters are functioning properly.
+ Check the power factor of the genera-
There will be occasions when the shift tor.
operator will find it more important to + Check the excitation current of the
attend a situation rather than collect log generator.
data. If the readings are not taken, the + Check the generator winding tempera-
operator should mark the vacant log tures.
spaces “Reading not taken because…” + Check the generator bearing tempera-
and make a concise notation of the in- tures.
terfering event in the remarks column.
+ Check the temperature of the genera-
Under no circumstances should the log
tor cooling air.
be falsified by inserting reading that
were not actually observed. + Check the generator frequency.

Miscellaneous Electrical system


+ Check the ambient temperature and + Check the DC voltage.
humidity. + Check the DC current.
+ Read the preceding day’s log sheets. + Check the battery level, clean termi-
+ Check that the crane, its hook, ma- nals and add electrolyte if needed.
noeuvring chains, and control box are
in safe positions. Fuel system
+ Inspect the fire extinguisher seals. + Inspect the system for leaks.
+ Check the pressure and temperature
from the engine.

1-4 Doc id: WDAAA311909 -


Plant operation - Operation manual

Normal operation, daily checklist

+ Check the pressure drop over the gas Compressor units


regulating filter. + Check the running hours of the com-
pressors.
Lubricating oil system + Drain the water separator.
+ Inspect the system for leaks. + Check the air pressure.
+ Check the pressure and temperature + Check the oil level.
from the engine.
+ Check the oil level in the sump. Cooling water system
+ Ensure that there are sufficient quan- + Inspect the system for leaks.
tities of lubricating oil in stock.
+ Check the pressure and temperature
readings at the inlet and outlet of the
Filters
engine.
+ Check the operation of LO filters.
Heat exchangers
LO cooler
+ Check the pressure and temperature
+ Check the cooling efficiency (inlet and readings at the inlet and outlet of all
outlet temperatures). heat exchangers.
+ Check the inlet and outlet pressure. + Check that the telltale holes are open.
+ Check that the telltale holes are open.
Cooling pumps
Compressed air system + Check that the leakage from the tell-
tale hole of the pump is normal.
+ Inspect the system for leaks.
+ Check the pressure from the engine.
Charge air & exhaust gas sys-
+ Drain the system.
tem
Starting air bottle + Check the charge air pressure and
+ Drain the bottle. temperature from the engine.
+ Check the air pressure. + Check the exhaust gas temperature
from the engine.
+ Check that the drain pipe of the
charge air cooler is open.
+ View the exhaust outlets for smoke,
colour and sparks.

Doc id: WDAAA311909 - 1-5


1. START, STOP AND OPERATION Hitz; F1-Project, WPP10185

Shut-down sequence

Normal stop Shut-down sequence


Tripping and blocking circuits

Z
1 Stop the engine.
Tripping
NOTE : The breaker trip circuit opens the genset
In manual mode the genset has to breaker and disconnects the excitation of
be manually unloaded and the gen- the generator. After the breaker has
erator breaker opened before stop- been opened and excitation disconnected
ping the engine. the genset runs unloaded for a preset
time before it stops.
The auxiliary systems shall always be in
operation circulating, cleaning and heat- The breaker trip circuit is self holding
ing the fluids, thus ensuring the best over an auxiliary contact and will re-
performance and trouble free operation main on until it is reset by the tripping
of the genset. It also reduces start-up reset push button.
time and enables the operator to start Before restart the cause for tripping
and load the engines very quickly. must be investigated and remedied.
Switch off the units only if prolonged
stoppage is planned or for maintenance Blocking
purposes. The blocking circuit opens the genset
If necessary, shut down auxiliary units breaker, disconnects the excitation and
according to instructions in the following stops the engine immediately without
chapters. any recooling time.
The blocking circuit is self holding over
an auxiliary contact and will remain on
until the blocking reset button is
pressed. The genset cannot be started if
the shut-down circuit is activated.
Before restart the cause for blocking
must be investigated and remedied.

1-6 Doc id: WDAAA311909 -