Labor Material

Clearing / Grubbing and Layout 1,350.00 sq.m.


Excavation 882.00 cu.m.
Backfill and Compaction 625.00 cu.m.
Gravel Base 1,119.00 cu.m.
Concrete 500.00 cu.m.
Formworks Vertical (Using Phenolic Bd) 620.00 sq.m.
Formworks Slab& beams(Using Phenolic Bd) 750.00 sq.m.
Rebars 7.50 kg
Rebars (Grade 60) 7.50 kg
Ready Mix Concrete (3000 psi) 500.00 cu.m.
Ready Mix Concrete (3500 psi) 500.00 cu.m.
Ready Mix Concrete (5000 psi) 500.00 cu.m.
4" CHB Laying 425.00 sq.m.
6" CHB Laying 526.00 sq.m.
Exterior / Interior Plastering Works 368.00 sq.m.
Plasticizer admixture for Plastering sq.m.
Waterproofing (3 coats Cementitious Membrane) 800.00 sq.m.

Painting incl. Surface Preparation


Skim Coat sq.m.
Semi-gloss Latex 102.00 185.00 sq.m.
Elastomeric Paint 244.00 442.00 sq.m.
Epoxy Primer 185.00 332.00 sq.m.
Flat Latex 102.00 185.00 sq.m.
QDE paint 120.00 210.00 sq.m.
Acrylic Paint (Spray) sq.m.