TABREED - DISTRICT COOLING SCHEME-AD16 PRESIDENTAL
GUARD COOLING PLANT, PROJECT NO. 4061E
WEEKLY REPORT 29th Nov 2015 TO 5th Dec 2015 WEEKLY HEALTH, SAFETY & ENVIRONMENT PERFORMANCE STATISTICS Month: Nov 2015 Name of the Contractor: RICHMOND
S. No. Data / Particulars This Week Cumulative
1 No. of Employees (Average) 19 19
2 Man Hours worked (Since last LTI) 1330 1330 3 Fatalities 0 0 4 First Aid Injuries 0 0 5 Lost Time Injuries (LTI) 0 0 6 Days Lost due to LTI 0 0 7 Restricted Work Day Cases (RWDC) 0 0 8 Medical Treatment Cases (MTC) 0 0 9 Heat stress related cases 0 0 10 Observation 02 2 11 Near Misses 0 0 12 High Potential Near misses 0 0 13 Damage to Property 0 0 14 Vehicle Incidents 0 0 15 Fire Incidents 0 0 16 Oil Spill Incidents 0 0 17 Chemical Spill Incidents 0 0 18 Accidents involving Third Parties 0 0 19 HSE Management System Audits 0 0 20 Camp Audits 0 0 21 Behavioral Audits 0 0 22 Site HSE Inspections 02 02 23 HSE Meetings 01 01 24 Municipal waste (Tons) 0 0 25 Hazardous waste (Tons) 0 0 26 Risk Assessments 05 05 27 Drills (Evacuation / Fire / Gas release) 0 0 Induction conducted 02 02 Employees Inducted 05 5 28 Trainings: Tool Box Talk 02 02 Safety Trainings 01 01 Employees Trained 01 01 Water (Gallon ) 0 5,000 29 Energy Consumption: Power (KWH) 0 0 Diesel (per Gallon) 100 100