Sheikh Zayed Bridge – Abu Dhabi

Use of post-tensioning to allow construction


of an otherwise almost unbuildable structure

▲ The 842m-long Sheikh Zayed Bridge is said to be the most intricate bridge ever constructed.

The 842m-long Sheikh Zayed the country's principal architect and with plate thicknesses of up to
Bridge comprises a sequence of former president, Sheikh 90mm . Below deck they are of
concrete waves that curve up and Zayed bin Sultan Al Nahyan. prestressed concrete.
down from the water to reach a
height of 64m, evoking the look of The project is widely regarded as the The bridge currently carries four
undulating sand dunes in the most demanding in Abu Dhabi and is lanes, two shoulders and a
desert. It connects Abu Dhabi also notable for its huge size. Its most pedestrian footpath in each
Island with the mainland, carrying striking features are the arch-like direction but has been constructed
a four-lane highway on two road structures that for two spans rise in such a way that it can easily be
decks that are cantilevered from above the roadway decks in the expanded to six lanes in each
the sides of the structure. centre of the bridge, before diving direction.
under the structure and coming up on
The bridge, which opened to traffic the outside of a third span. These
in December 2010, is named after ‘arches’ are really bent box girders in
a non-vertical plane, fixed at their
ends with little or no allowance for
Scope of works performed adjustment during erection.
• Engineering Consequently any applied load
• Supply and installation of VSL’s SSI causes bending in all directions and
2000 system torsion and compression or tension.
• Supply of post-tensioning components Above deck they are steel boxes
and their equipment
about 4m wide and 5m deep - the
ID 1787

• Heavy lifting for segment erection


height of a two-storey building – ▲ Finished main arch of the bridge
Simple repainting of the dividing OWNER
lines will create the extra lanes, Abu Dhabi Municipality
should the flow of traffic require it.
The bridge has a capacity of CONSULTING ENGINEER
16,000 cars per hour. High-Point Rendel

The unusual combination of MAIN CONTRACTOR


concrete and steel provided more Archirodon Construction / Six Construct
than its fair share of headaches. Co. Ltd.
Over 200,000m3 of concrete were
used – the central pier alone VSL ENTITY
contains enough concrete to cover VSL Switzerland Ltd. – Special Projects
a football pitch to a height of 5m, and Heavy Lifting Department
while 52,000 tonnes of steel were VSL Middle East LLC
required for the structure and
reinforcement. DATE
July 2003 – December 2010
The twin decks are 23.7m wide ▲ VSL’s lifting system
and 5m deep and are supported by
36 stay hangers in sizes up to 6-127. SMU-330 lifting jacks. They were
installed on a turntable that allowed
The arch bridge with its suspended segment movement with five
deck consists of 11 deck sections degrees of freedom. The heaviest
and three major arches, with four segment and lifting gear together
main piers and two additional sets added up to 740t.
of supports at the western end.
The length of the main span is The structure’s 5,000t of
126m and the highest point of the prestressing steel including bars
arch is at 63m. and hangers was a large amount
for such a short but massive
▲ Final design and construction engineering bridge. The cable hangers
For the erection of the arch segments, for the arch erection was done by VSL’s
VSL Heavy Lifting provided four Technical Centre in Singapore. consisting of 109 and 127 strands
were among the largest that VSL
had ever installed. Hanger pipes
made of stainless steel were
welded on site.

VSL’s scope of work included


post-tensioning of a total of
780 cables. White PT-Plus® plastic
ducts were used instead of the
standard black ducts because of
the high temperatures experienced
in Abu Dhabi.

Construction deadlines for VSL’s


work were very tight. VSL’s site
team worked day, night and
weekend shifts and close
communication and a solid team
▲ The pier arms have an undulating shape. effort ensured that the project was
▼ The arches rise to over 60m above sea level. completed on time and to the
owner’s total satisfaction.