Documente Academic
Documente Profesional
Documente Cultură
BIOGAS UPGRADING
130 locations
PENTAIR 1 PENTAIR
1 2
STORIES TO SHARE
Haffmans story short
Founded First CO2 Started to Acquired by Digital CO2/O2 First Biogas Haffmans,
in Venlo, Gehaltemeter, produce CO2 Norit together Gehaltemeter upgrading Südmo, Norit
Beverage: Industrial Gases: Energy: recovery plants Process
Desalination: Process Services: Holland Type GMT with Südmo Type c-DGM
Breweries Petrochemical Biogas plants systems installed Technology
Contractors Universities
Soft drink bottlers Large industrial groups Farmers and X-Flow
Desalination plant Any existing projects acquired by Combined
Craft brewers Independent gas Industrial Gases
consortiums or company Pentair forces
Distilleries companies Landfill
allow us to
CO2 fermentation and CO2 capture and recovery Recovery and upgrading Safe CO2 technology for Relocation of an existing offer great
purification technologies technologies for obtaining plants for ‘zero-methane’ remineralising the desalted CO2 plant, extending the
1948 1967 1977 2009 2006 2010 2011 technologies,
for efficient and safe a safe endproduct even slip solutions. seawater, in order to capicity or developing a
from a low purity source. supply regions with scarce special technology for components,
endproducts.
The upgrading plants are water resources. scientific purposes. 1933 1972 1984 1994 1995 2013 2017 units and
An extensive product The plants are delivering an available with two different Serious
First CO2 Acquired by Sales and Sales and Acquisition Acquired by
portfolio within quality end-product that exceeds technologies, depending The plants are efficient and Service
plant installed; Norsk Hydro production production of Wittemann, Pentair
and control components. the highest demands form on need and plant size. available and an important globally!
Coca Cola, Danmark in China in Brazil USA
ISBT and EIGA. ingredient in delivering Iran established established
Innovative solutions – also The recovery plants offer a drinking water to the ECO2Brew CO2mpactBrew
for craft brewers. second value stream. people. launched launched
Founded Acquired by
After Market Service In Fredericia, British Oxygen
Serious Service is covering all segment, Denmark Company BOC )
offering an extensive service programme
globally.
3 4
1400+ 20.000+
MEASUREMENT
CO2 PLANTS DEVICES
BIOGAS UPGRADING
3 Stage & 2 Stage with CO2
> 3000 Nm3/h
No Methane Slip
5 6
1
14-5-2019
7 8
ANAEROBIC DIGESTION
LOCAL HEAT
PRODUCTS
PRODUCTS
PRODUCTS
PRODUCTS
9 10
Low Pressure Stage BIOGAS PART Low Pressure Stage BIOGAS PART
Fan Blower Scrubber Activ Carbon Low Pressure Membrane Separation Fan Blower Scrubber Activ Carbon Low Pressure Membrane Separation
Chiller (H2S/VOC) Conditioning Chiller (H2S/VOC) Conditioning
Heater Heater
High Pressure Stage Membrane Stage 1 & 2 Revenue Stream High Pressure Stage Membrane Stage 1 & 2 Revenue Stream
Compression High 1st Stage 2nd Stage Temperature Quality BioMethane Compression High 1st Stage 2nd Stage Temperature Quality BioMethane
Pressure Conditioning Control Pressure Conditioning Control
Conditioning Conditioning
CO2 PART
Vent
Cryogenic Separation
PENTAIR 11 PENTAIR 12
11 12
2
14-5-2019
CO2-Bolt-On
CO2 PART
Cryogenic Separation • CO2 purity acc EIGA Specs
13 14
BIOGAS UPGRADING – Amine Solution REFERENCES BIOGAS UPGRADING AND BOLT-ON CO2
Biogas AD
Flare UK & Ireland
Scandinavia
10x Standard Solution
Low Pressure Stage 2x Advanced Solution
-1x Standard Solution
Fan Blower Scrubber Activ Carbon Low Pressure -1x Amine Solution
6x Advanced Plus Solution
Chiller (H2S/VOC) Conditioning Support by
Heater 1x Bolt-on Solution
DK office
Support by
Ireland office
First Stage Second Stage Revenue Stream
Absorbor Water H2S Polishing Compressor Dryer Quality BioMethane
Scrubber Control
Central Europe
4x Standard Solution
5x Advanced Solution
Flare / Digester
5x Advanced Plus Solution
Amine Treatment Support by
North America NL office
Reboiler Stripper
High Pressure Stage Purification & Liquefaction Stage 3x3220Nm3/h
Compression High Regenerative CO2 Liquefier Stripper - Supported by South Africa &
Pressure Activ Carbon Reboiler
Conditioning & Drier US offices Philippines
1 Advance Plus
Optional CO2 PART 2 CO2 recovery plants
Heat for Digester Cryogenic Separation
15 16
BIOGAS UPGRADING in Nederland NL 2011: 450 Nm3/h BIOGAS TO GRID & GREEN CO2
NL AD – Bio-Methane
2018 :
268 bio gas installaties met WKK
Geïnstalleerd vermogen 119 MW
Totaal geleverd vermogen 17,0840,720 GWh
In 2018 was de productie van Bio-methaan +/- 1,170 GWh (source EBA)
6 YEARS OF LIQUID CO2 RECOVERY
PENTAIR 17 PENTAIR 18
17 18
3
14-5-2019
19 20
21 22
FURTHER REFERENCES IN SOUTH AFRICA, USA and PHILIPINES SECURITY AND FUTURE PROOFING
PENTAIR
PENTAIR
PENTAIR Process Technology PENTAIR 24
23 24
4
14-5-2019
PENTAIR TECHNICAL & ECONOMIC FEASIBILITY OF SUSTAINABLE CO2 FROM BIOGAS PENTAIR TECHNICAL & ECONOMIC FEASIBILITY OF SUSTAINABLE CO2 FROM BIOGAS
25 26
30 0%
27.5 – possible future GHG limit?
25 Biogas upgrading - other
Biogas upgrading - methane slip
20 Biogas Production
Silage - production & transport
15
Harvesting - diesel
Cultivation - diesel Niels den Heijer
10
Pesticides Product Line Manager – Biogas
5 Soil N2O emissions Haffmans B.V.
Fertiliser Production Niels.denheijer@Pentair.com
0 Seed www.biogas.pentair.com
Maize (1% CH4 loss) Maize (0% CH4 loss)
+31 77 3232396
Scenario
PENTAIR 27 PENTAIR 28
27 28