PAINTING CHECKSHEET

NAME OF WORK UTILITY PIPING SYSTEM Format No : METEC /J#1392/F -03

PROJECT J#1392- M/S ITC LTD Document No : ITC/METEC/PC/05

CLIENT M/s. ITC LIMITED, TRICHY Date & Time :

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/1392/002

SERVICE COMPRESSED AIR (100NB GI) ATTABLOCK GREOUND FLOOR

S.NO DESCRIPTION METEC ITC Date of Completion

1 Pipe surface is clean for painting

2 Bishon Wash primer applied and found satisfactory

3 Yellow Primer Second coat Primer completed

4 Synthetic Enamel Paint applied - First coat

5 Synthetic Enamel Paint applied - Final coat

DFT RECORD

S.NO DESCRIPTION P33 P34 P35 P36 P37 P38 P39 P40

1 Bishon Wash Primer Coating DFT observed

2 Yellow Primer Second coat Primer Coating DFT observed

3 Synthetic Enamel Coating DFT observed

4 Synthetic Enamel Coating DFT observed finally

OBSERVATION IF ANY:

Company M/s . METEC (EXECUTED BY) M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )

Name

Signature

Date
PAINTING CHECKSHEET

NAME OF WORK UTILITY PIPING SYSTEM Format No : METEC /J#1392/F -03

PROJECT J#1392- M/S ITC LTD Document No : ITC/METEC/PC

CLIENT M/s. ITC LIMITED, TRICHY Date & Time :

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/1392/001

SERVICE INTERNAL PIPE RACK (SNACKS BLOCK) Total no supports : 188

S.NO DESCRIPTION METEC ITC Date of Completion

1 Frame surface is clean for painting

2 Red oxide primer applied and found satisfactory

3 Red oxide Primer Second coat Primer completed

4 Synthetic Enamel Paint applied - First coat

5 Synthetic Enamel Paint applied - Final coat

DFT RECORD

S.NO DESCRIPTION F31-41 F31-42 F31-43 F31-44 F31-45 F31-46 F31-47 F31-48 F31-49 F31-50

1 Red oxide Primer Coating DFT observed

2 Red oxide Second coat Primer Coating DFT observed

3 Synthetic Enamel Coating DFT observed

4 Synthetic Enamel Coating DFT observed finally

OBSERVATION IF ANY:

Company M/s . METEC (EXECUTED BY) M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )

Name

Signature

Date
PAINTING CHECKSHEET

NAME OF WORK UTILITY PIPING SYSTEM

PROJECT J#1392- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD

S.NO DESCRIPTION

1 Pipe/Structural surface is clean for painting

2 Red Oxide primer applied and found satisfactory

3 Red oxide second coat Primer completed

4 Synthetic Enamel Paint applied - First coat

5 Synthetic Enamel Paint applied - Final coat

DFT RECORD
S.NO DESCRIPTION P1

1 Red Oxide Primer Coating DFT observed

2 Second coat Red oxide Primer Coating DFT observed

3 Synthetic Enamel Coating DFT observed

4 Synthetic Enamel Coating DFT observed finally

DESCRIPTION AND LOCATION OF WORK INSPECTED:

Company M/s . METEC (EXECUTED BY) M/s .METEC (CHECKED

Name

Signature

Date
TING CHECKSHEET

Format No : METEC /J#1392/F -03

Document No : ITC/METEC/PC/01

Date & Time :

A PVT LTD Drawing no : MDCEIPL/1392/001

METEC ITC Date of Completion


P2 P3 P4 P5 P6 P7

M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )


PAINTING CHECKSHEET

NAME OF WORK EXTERNALPIPE RACK SYSTEM

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- DIRECT EPOXY

S.NO DESCRIPTION

1 Column surface is clean for painting

2 Epoxy Final coat completed

DFT RECORD

S.NO DESCRIPTION C-1 C-2

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

OBSERVATION IF ANY:
Company M/s . METEC (EXECUTED BY) M/s .METEC (CHE

Name

Signature

Date
CHECKSHEET

Format No : METEC /J#1397/F-01

Document No : ITC/METEC/PC/01

Date & Time :

T LTD Drawing no : MDCEIPL/1397/001

METEC ITC Date of Completion

C-3 C-4 C-5 C-6 C-7 C-8


M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )
PAINTING CHECKSHEET

NAME OF WORK EXTERNALPIPE RACK SYSTEM-

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- DIRECT EPOXY

S.NO DESCRIPTION

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

DFT RECORD

S.NO DESCRIPTION C-9 C-10

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

OBSERVATION IF ANY:
Company M/s . METEC (EXECUTED BY) M/s .METEC (CHE

Name

Signature

Date
CHECKSHEET

Format No : METEC /J#1397/F-01

Document No : ITC/METEC/PC/02

Date & Time :

T LTD Drawing no : MDCEIPL/1397/001

METEC ITC Date of Completion

C-11 C-12 C-13 C-14 C-15 C-16


M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )
PAINTING CHECKSHE

NAME OF WORK EXTERNALPIPE RACK SYSTEM-

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS IND

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- DIRECT EPOXY

S.NO DESCRIPTION

1 supports surface are clean for painting

2 Epoxy Final coat completed

DFT RECORD

S.NO DESCRIPTION S-1 S-2

1 supports surface are clean for painti

2 Epoxy Final coat completed


OBSERVATION IF ANY:

Company M/s . METEC (EXECUTED BY) M/s .METEC (CH

Name

Signature

Date
NTING CHECKSHEET

Format No : METEC /J#1397/F-01

Document No : ITC/METEC/PC/13

Date & Time :

ON ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/1397/001

DE- DIRECT EPOXY( ADDITIONAL SUPPORTS)

METEC ITC Date of Completion

S-3 S-4 S-5 S-6 S-7 S-8


M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )
PAINTING CHECKSHEET

NAME OF WORK EXTERNALPIPE RACK SYSTEM-

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- DIRECT EPOXY

S.NO DESCRIPTION

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

DFT RECORD

S.NO DESCRIPTION C-25 C-26

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

OBSERVATION IF ANY:
Company M/s . METEC (EXECUTED BY) M/s .METEC (CHE

Name

Signature

Date
CHECKSHEET

Format No : METEC /J#1397/F-01

Document No : ITC/METEC/PC/04

Date & Time :

T LTD Drawing no : MDCEIPL/1397/001

METEC ITC Date of Completion

C-27 C-28 C-29 C-30 C-31 C-32


M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )
PAINTING CH

NAME OF WORK EXTERNALPIPE RACK SYSTEM

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- ENAMEL T

S.NO DESCRIPTION

1 Gantry surface clean for painting.

2 Protomastic applioed and found satisfactory.


3 Epoxy primer first coat completed.

4 Epoxy Final coat completed.

DFT RECORD

S.NO DESCRIPTION 89-89A

1 column surface is clean for painting

Protomastic applioed and found


2 satisfactory.

3 Epoxy primer first coat completed.

4 Epoxy Final coat completed

OBSERVATION IF ANY:
Company M/s . METEC (EXECUTED BY)

Name

Signature

Date
PAINTING CHECKSHEET

Format No : METEC /J#1397

Document No : ITC/METEC/PC

Date & Time :

TION ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/1397

RADE- ENAMEL TO EPOXY

ION METEC ITC


89-88 88-87 87-86 86-85 85-84
M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY
mat No : METEC /J#1397/F-01

ument No : ITC/METEC/PC/01

e & Time :

wing no : MDCEIPL/1397/001

Date of Completion
84-83 83-82
M/s .ITC (CHECKED BY )
PAINTING C

NAME OF WORK EXTERNALPIPE RACK SYSTEM

PROJECT J#1397- M/S ITC LTD

CLIENT M/s. ITC LIMITED, TRICHY

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE-DIRECT EP

S.NO DESCRIPTION

1 Gantry surface clean for painting.

2 Epoxy Final coat completed.


DFT RECORD

S.NO DESCRIPTION C-25

1 Gantry surface is clean for painting

2 Epoxy Final coat completed

OBSERVATION IF ANY:

Company M/s . METEC (EXECUTED BY)


Name

Signature

Date
PAINTING CHECKSHEET

Format No : METEC /J#13

Document No : ITC/METEC/P

Date & Time :

TION ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/139

RADE-DIRECT EPOXY

TION METEC ITC


C-26 C-27 C-28 C-29 C-30

M/s .METEC (CHECKED BY) M/s .ITC (CHECKED B


mat No : METEC /J#1397/F-01

ument No : ITC/METEC/PC/004

e & Time :

wing no : MDCEIPL/1397/001

Date of Completion
C-31 C-32

M/s .ITC (CHECKED BY )


PAINTING CHECKSHEET

NAME OF WORK EXTERNALPIPE RACK SYSTEM- Format No : METEC /J#1397/F-01

PROJECT J#1397- M/S ITC LTD Document No : ITC/METEC/PC/12

CLIENT M/s. ITC LIMITED, TRICHY Date & Time :

CONTRACTOR M/s. METEC DESIGN & CONSTRUCTION ENGINEERS INDIA PVT LTD Drawing no : MDCEIPL/1397/001

SERVICE EXTERNAL PIPE RACK- PAINT UPGRADE- DIRECT EPOXY(PUMP ROOM)

S.NO DESCRIPTION METEC ITC Date of Completion

1 column surface is clean for painting

2 Epoxy Final coat completed

DFT RECORD

SUB SUB SUB


S.NO DESCRIPTION PUMP STATION STATION- STATION-
ROOM -1 -1 2 3

1 column surface is clean for painting

2 Epoxy Final coat completed

OBSERVATION IF ANY:

Company M/s . METEC (EXECUTED BY) M/s .METEC (CHECKED BY) M/s .ITC (CHECKED BY )